MONTHYEARRA-12-082, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12)2012-07-13013 July 2012
[Table View]Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12) Project stage: Request NOC-AE-12002878, Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 142012-07-17017 July 2012 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 14 Project stage: Request ML12214A2642012-07-25025 July 2012 PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14 Project stage: Request CP-201200875, Report of Changes to the Physical Security Plan (Revision 7)2012-07-26026 July 2012 Report of Changes to the Physical Security Plan (Revision 7) Project stage: Request ML12214A5812012-07-30030 July 2012 Associated ISFSIs - Submittal of Security Plan, Training & Qualification Plan, Safeguards Contingency Plan & ISFSI Security Program Project stage: Request RBG-47269, Submittal of Revision 10 to the Security Plan, T&Q Plan and Safeguards Contingency Plan2012-08-0202 August 2012 Submittal of Revision 10 to the Security Plan, T&Q Plan and Safeguards Contingency Plan Project stage: Request L-2012-305, Revision 15 to the Physical Security Plan, Cover Letter2012-08-0303 August 2012 Revision 15 to the Physical Security Plan, Cover Letter Project stage: Request ULNRC-05889, Union Electric Co. Facility Operating License NPF-030 Physical Security Plan, Revision 102012-08-0303 August 2012 Union Electric Co. Facility Operating License NPF-030 Physical Security Plan, Revision 10 Project stage: Request ML12219A2282012-08-0303 August 2012 Revision to the Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 9 Project stage: Request ML12221A3362012-08-0808 August 2012 Draft RAI on Revision to Security Plan Project stage: Draft RAI ML12229A2872012-08-13013 August 2012 Security Plan, Revision 9 to the Training and Qualification Plan, and Safeguards Contingency Plan Project stage: Request ML12237A0772012-08-23023 August 2012 Draft Request for Information Email - Related to Physical Security Plant (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: Draft RAI ML12229A4332012-09-0606 September 2012 Request for Additional Information Regarding Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 12 (TAC No. D91660) Project stage: RAI ML12251A0472012-09-11011 September 2012 Request for Additional Information, Review of Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: RAI ML12255A0742012-09-18018 September 2012 Request for Additional Information, Changes to Callaway Physical Security Plan (TAC No. D91660) Project stage: RAI ML12286A3362012-10-0404 October 2012 (ANO) Units 1 and 2, Revision 14 of the ANO Security Plan Project stage: Request ML12284A0182012-10-0505 October 2012 NRR E-mail Capture - (D91660) Request for Additional Information (RAI) Draft Questions Corporate Security Plans Submitted 7/30/2012 Project stage: Draft RAI ULNRC-05921, Response to Request for Additional Information Regarding Changes to Security Plan (TAC No. D91660)2012-10-18018 October 2012 Response to Request for Additional Information Regarding Changes to Security Plan (TAC No. D91660) Project stage: Response to RAI ML12296A0102012-10-19019 October 2012 NRR E-mail Capture - D91660 - Dominion Physical Security Plan - Request for Additional Information - This Message Is Publically Available and non-sensitive Project stage: RAI ML12296A9302012-10-23023 October 2012 Enclosudraft Request for Additional Information Project stage: RAI ML12305A0432012-10-29029 October 2012 Email Security-Related Request for Additional Information, Review of Revision 10 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (TAC D91660) Project stage: RAI ML12305A0192012-10-30030 October 2012 NRR E-mail Capture - FW: D91660 - NextEra Energy Duane Arnold Physical Security Plan - RAI - This Message Is Publically Available and non-sensitive Project stage: RAI ML12306A5462012-11-0101 November 2012 E-mail, Request for Additional Information - Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 7 for the CPNPP (TAC No. D91660) Project stage: RAI ML12292A3222012-11-0101 November 2012 Request for Additional Information Regarding Revision 9 to Security Plant, Training & Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installa Project stage: RAI ML12297A3602012-11-0101 November 2012 Request for Additional Information, Review of Revision 14 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Project stage: RAI ML12300A0372012-11-0505 November 2012 Request for Additional Information Regarding Physical Security Plan, Training and Qualifications Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program Project stage: RAI ML12300A3222012-11-0505 November 2012 Redacted Letter Only, Request for Additional Information Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (TAC D91660) Project stage: RAI ML12307A3692012-11-0707 November 2012 Request for Additional Information Regarding Revision 18 to the Physical Security Plan (TAC No. D91660) Project stage: RAI ML12310A0292012-11-16016 November 2012 Request for Additional Information Related to Physical Security Plan, Revision 16 Project stage: RAI ML12314A3562012-11-20020 November 2012 Request for Additional Information, Round 2, Changes to Callaway Physical Security Plan (TAC No. D91660) Project stage: RAI ML12335A0112012-11-28028 November 2012 Response to Request for Additional Information Regarding Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 Project stage: Response to RAI ML12347A3022012-12-12012 December 2012 Email, Request for Additional Information on Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 15, (TAC No. D91660) Project stage: RAI ML12341A1592012-12-18018 December 2012 Request for Additional Information Regarding Physical Security Plan, Training Qualifications Plan, and Safeguards Contingency Security Program Revision 15 Project stage: RAI ML13002A0352012-12-19019 December 2012 Response to Request for Additional Information Regarding Revision 9 to the Wolf Creek Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Project stage: Response to RAI ML12356A2182012-12-21021 December 2012 Email, Request for Additional Information Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 (TAC No. D91660) Project stage: RAI ML13010A5522013-01-16016 January 2013 Request for Additional Information Regarding Revision 18 to the Physical Security Plan Project stage: RAI ML13010A5512013-01-16016 January 2013 Request for Additional Information Regarding Revision 18 to the Physical Security Plan (TAC No. D91660) Project stage: RAI ML13023A4072013-01-23023 January 2013 Request for Additional Information Email, Review of Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 7 Project stage: RAI ULNRC-05954, Response to Request for Additional Information Changes to Physical Security Plan (TAC No. D91660)2013-01-28028 January 2013 Response to Request for Additional Information Changes to Physical Security Plan (TAC No. D91660) Project stage: Response to RAI ML13029A7132013-01-29029 January 2013 Email, Request for Additional Information, Revision 13 to Physical Security, Safeguards Contingency, and Training and Qualification Plan (TAC No. D91660) Project stage: RAI ML13077A3372013-03-18018 March 2013 Email, Request for Additional Information, Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: RAI ML13120A0832013-03-22022 March 2013 Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 20 (TAC No. D91660) Project stage: RAI ML13120A0842013-03-22022 March 2013 Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 20 (TAC No. D91660) Project stage: RAI ML13165A3442013-06-12012 June 2013 Revision 15 of the ANO Security Plan Project stage: Request ML13165A0842013-06-13013 June 2013 Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 21 (TAC No. D91660) Project stage: RAI ML13116A3702013-07-12012 July 2013 (Redacted) Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10 (TAC No. D91660) Project stage: Approval ML13116A0942013-07-12012 July 2013 (Redacted) Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 9 (TAC No. D91660) Project stage: Approval ML13116A3912013-07-12012 July 2013 (Redacted) Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 17 (TAC No. D91660) Project stage: Approval ML13120A2322013-07-18018 July 2013 (Redacted) Review of Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revisions 14 and 15 (TAC D91660) Project stage: Approval ML13275A3102013-11-25025 November 2013 Cover Memo from Robert Caldwell to Robert Pascarelli, RAI for V C Summer Revision 10 Security Plan Review Project stage: RAI 2012-07-26 |
ML12216A356 | |
Person / Time | |
---|---|
Site: | River Bend ![]() |
Issue date: | 08/02/2012 |
From: | Clark J Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RBG-47269 | |
Download: ML12216A356 (2) | |
Similar Documents at River Bend | |
---|---|
Category:Letter type:RBG
MONTHYEARRBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024
[Table view]Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owner'S Activity Report Form for Cycle 22 RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report RBG-48221, 2022 Annual Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Radiological Environmental Operating Report RBG-48142, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-27027 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RBG-48198, Report of Changes and Errors to 10CFR50.462022-09-22022 September 2022 Report of Changes and Errors to 10CFR50.46 RBG-48187, Notification of Spent Fuel Cask Use2022-08-15015 August 2022 Notification of Spent Fuel Cask Use RBG-48184, Notification of Spent Fuel Cask Use2022-07-18018 July 2022 Notification of Spent Fuel Cask Use RBG-48178, Notification of Spent Fuel Cask Use2022-06-29029 June 2022 Notification of Spent Fuel Cask Use RBG-48166, Supplement to Special Report for Tritium Discovered Onsite2022-05-12012 May 2022 Supplement to Special Report for Tritium Discovered Onsite RBG-48149, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report RBG-48148, 2021 Annual Radiological Environmental Operating Report2022-04-27027 April 2022 2021 Annual Radiological Environmental Operating Report RBG-48134, Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency2021-11-29029 November 2021 Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency RBG-48136, Additional Information for the 2020 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2020 Annual Radioactive Effluent Release Report RBG-48137, Additional Information for the 2019 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2019 Annual Radioactive Effluent Release Report RBG-48128, Reply to a Notice of Violation; EA-21-017, 030 and 0502021-10-29029 October 2021 Reply to a Notice of Violation; EA-21-017, 030 and 050 RBG-48129, Payment of a Civil Penalty2021-10-21021 October 2021 Payment of a Civil Penalty RBG-48112, Report of Changes and Errors to 10CFR50.462021-09-16016 September 2021 Report of Changes and Errors to 10CFR50.46 RBG-48110, Core Operating Limits Report (COLR) - Cycle 22, Revision 12021-08-19019 August 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 1 RBG-48104, Fitness for Duty Blind Quality Assurance Specimen Testing Error2021-06-30030 June 2021 Fitness for Duty Blind Quality Assurance Specimen Testing Error RBG-48099, Submittal of Owner'S Activity Report Form for Cycle 212021-06-16016 June 2021 Submittal of Owner'S Activity Report Form for Cycle 21 RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials RBG-48093, Corrected 2020 Annual Radiological Environmental Operating Report2021-05-20020 May 2021 Corrected 2020 Annual Radiological Environmental Operating Report RBG-48082, 2020 Annual Radiological Environmental Operating Report2021-04-20020 April 2021 2020 Annual Radiological Environmental Operating Report RBG-48081, 2020 Annual Radioactive Effluent Release Report2021-04-20020 April 2021 2020 Annual Radioactive Effluent Release Report RBG-48078, Core Operating Limits Report (COLR) - Cycle 22, Revision 02021-03-14014 March 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 0 RBG-48075, Notification of Deviation from BWRVIP Guidelines2021-02-24024 February 2021 Notification of Deviation from BWRVIP Guidelines RBG-48074, Spent Fuel Storage Radioactive Effluent Release Report for 20202021-02-22022 February 2021 Spent Fuel Storage Radioactive Effluent Release Report for 2020 RBG-48061, One-Time Schedular Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-12-0303 December 2020 One-Time Schedular Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency RBG-48054, Application to Adopt GL 86-10 Standard License Condition for Fire Protection Program2020-11-0202 November 2020 Application to Adopt GL 86-10 Standard License Condition for Fire Protection Program RBG-48049, Reply to a Notice of Violation; EA-20-0582020-10-26026 October 2020 Reply to a Notice of Violation; EA-20-058 RBG-48038, Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to Covid 19 Pandemic2020-10-0606 October 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to Covid 19 Pandemic RBG-48042, Submittal of Rev. 48 to Emergency Plan2020-09-22022 September 2020 Submittal of Rev. 48 to Emergency Plan RBG-48039, Report of Changes and Errors to 10CFR50.462020-09-16016 September 2020 Report of Changes and Errors to 10CFR50.46 RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-0404 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RBG-48023, Submittal of Revs. 46 and 47 to Emergency Plan and Revised Emergency Implementing Procedures2020-06-0909 June 2020 Submittal of Revs. 46 and 47 to Emergency Plan and Revised Emergency Implementing Procedures RBG-48019, 2019 Annual Radioactive Effluent Release Report2020-04-30030 April 2020 2019 Annual Radioactive Effluent Release Report RBG-48020, Annual Radiological Environmental Operating Report2020-04-30030 April 2020 Annual Radiological Environmental Operating Report RBG-48018, Withdrawal of License Amendment Request to Extend the RBS Emergency Plan Implementation Date2020-04-24024 April 2020 Withdrawal of License Amendment Request to Extend the RBS Emergency Plan Implementation Date 2024-01-12 |
Text
Entergy Operations, Inc.
River Bend Station 5485 U S. Highway 61N St. Francisville, LA 70775 Tel 225-381-4177 Joseph A. Clark Manager-Licensing SAFEGUARDS INFORMATION RBG-47269 August 2, 2012 Via Overnight Delivery U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 301-415-1445
Subject:
River Bend Station Submittal of Revision 10 to the Security Plan, T&Q Plan and Safeguards Contingency Plan River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47
Dear Sir or Madam:
Enclosed is Revision 10 to the River Bend Station Physical Security, Safeguards Contingency and Training & Qualification Plan. This revision reflects implementation of changes per Revision 7 of Nuclear Energy Institute (NEI) 03-12, "Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, [and Independent Spent Fuel Storage Installation Security Program]," dated October 2011, plus other changes. In accordance with I OCFR 50.54(p) these changes do not decrease the effectiveness of the Security Plan.
This letter includes no new commitments. If you require additional information, please contact Mr. Todd Santy at (225) 378-3524.
Sincerely, JAC/wjf Enclosure NOTICE: Enclosure contains "Safeguards Information." Upon separation of the Enclosure, this letter becomes "DECONTROLLED."
SAFEGUARDS INFORMATION Q) !)
% Vc_L
e River Bend Station Submittal of Revision 10 to the Security Plan, T&Q Plan and Safeguards Contingency Plan RBG-47269 Page 2 of 2 SAFEGUARDS INFORMATION cc: w/o Enclosure U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd.
Arlington, TX 76011-4511 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Ms. Tracie Lowrey Public Utility Commission of Texas 1701 N. Congress Ave.
Austin, TX 78711-3326 Department of Environmental Quality Office of Environmental Compliance Radiological Emergency Planning and Response Section Attn: JiYoung Wiley P.O. Box 4312 Baton Rouge, LA 70821-4312 Mr. Alan B. Wang, Project Manager U.S. Nuclear Regulatory Commission MS 0-8 B1 11555 Rockville Pike Rockville, MD 20852-2738 NOTICE: Enclosure contains "Safeguards Information." Upon separation of the Enclosure, this letter becomes "DECONTROLLED."
SAFEGUARDS INFORMATION