RAI Regarding Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 9 (Tac D91660)
ML14168A509
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/26/2014
From: Nadiyah Morgan
Plant Licensing Branch 1
To: George Gellrich
Calvert Cliffs
Morgan N
References
TAC D91660
Download: ML14168A509 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 26, 2014 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2-REQUEST FOR ADDITIONAL INFORMATION REGARDING SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTIGENCY PLAN AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM, REVISION 9 (TAC NO. D91660)

Dear Mr. Gellrich:

By letter dated May 14, 2014, Calvert Cliffs Nuclear Power Plant, LLC submitted Revision 9 of the Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2.

The Nuclear Regulatory Commission (NRC) staff is reviewing the submission and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The NRC staff is requesting a response to the RAI within 30 days of this letter.

If you have any questions regarding this issue, please contact me at (301) 415-1016.

Sincerely, adiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

RAI cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION REGARDING SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTIGENCY PLAN AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM, REVISION 9 CALVERT CLIFFS NUCLEAR POWER PLANT, LLC.

EXELON GENERATION COMPANY, LLC CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-317 AND 50-318 By letter dated May 14, 2014 (Agencywide Documents Access and Management System Accession No. ML14139A425), Calvert Cliffs Nuclear Power Plant, LLC, submitted Revision 9 of the Physical Security Plan (PSP), Training and Qualification Plan, Safeguards Contingency Plan (SCP), and Independent Spent Fuel Storage Installation Security Program for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submission to ensure compliance with Title 10 of the Code of Federal Regulations (1 0 CFR) Section 50.54(p)(2). In order to complete its review, the NRC staff needs the following additional information:

1. There is a discrepancy between Section 18, page 29 of the PSP, and Section 5.9, page C-24 of the SCP.
a. Explain the conflict in language concerning the third sentence in the second paragraph of Section 18 and the second sentence in Section 5.9.
b. Confirm that appropriate changes will be made to reflect the current status of these sections in the next revision of the site security plan.

Regulatory Basis:

  • Consistent with 10 CFR 73.55(k)(6), "(i) Armed security officers, designated to strengthen onsite response capabilities, shall be onsite and available at all times to carry out their assigned response duties."
  • Consistent with 10 CFR 73, Appendix C, Section II.B.3.c.(v)(5), "Describe the specific structure and responsibilities of the armed response organization to include: [(1 )] the authorized minimum number of armed responders, available at all times inside the protected area [and (2)] the authorized minimum number of armed security officers, available onsite at all times."

Enclosure

June 26, 2014 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2-REQUEST FOR ADDITIONAL INFORMATION REGARDING SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTIGENCY PLAN AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM, REVISION 9 (TAC NO. D91660)

Dear Mr. Gellrich:

By letter dated May 14, 2014, Calvert Cliffs Nuclear Power Plant, LLC submitted Revision 9 of the Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2.

The Nuclear Regulatory Commission (NRC) staff is reviewing the submission and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The NRC staff is requesting a response to the RAI within 30 days of this letter.

If you have any questions regarding this issue, please contact me at (301) 415-1016.

Sincerely, IRA/

Nadiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

RAI cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDor1Lpl1-1 RidsNrrPMCalvertCiiffs LPL 1-1 R/F RidsNrrLAKGoldstein RidsAcrsAcnw_MaiiCTR RidsNrrDoriDpr RidsRgn1 MaiiCenter V. Williams, NSIR RidsOGCMaiiCenter J. Petrucelli, NSIR D. Huyck, NSIR ADAMS ACCESSION NO: ML14168A509 *See dated memo OFFICE LPLI-1/PM LPLI-1/LA NSIR/DSP/BC LPLI-1/BC NAME NMorgan KGoldstein DHuyck BBeasley DATE 6/25/14 6/25/2014 6/9/2014* 6/26/14 OFFICIAL RECORDS COPY