Revision to the Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 9
ML12219A228
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/03/2012
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML12219A228 (3)


Text

SAFEGUARDS INFORMATION Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 August 3, 2012 10 CFR 50.4(b)(4) 10 CFR 50.54(p)(2)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

10 CFR 50.54(p) Revision to the Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 9 In accordance with 10 CFR 50.54, "Conditions of Licenses," paragraph (p)(2), this letter provides Revision 9, dated August 3, 2012, of the Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program. The Tennessee Valley Authority (TVA) has evaluated this change and does not consider the revision to decrease the overall effectiveness of the plan. provides a summary of changes. Enclosure 2 provides a copy of the Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 9.

This letter contains Safeguards Information as defined in 10 CFR 73, "Physical Protection of Plants and Materials," Section 21. Therefore, TVA requests that Enclosure 2 to this letter be withheld from public disclosure. The enclosed plan revision is being sent by FEDEX.

"Enclosure 2 Contains Safeguards Information. Upon Separation, This Page Is Decontrolled" SAFEGUARDS INFORMATION 4SQQ0 Printed on recycled paper O

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 2 August 3, 2012 There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact Joan McCullum, Coordinator Nuclear Physical Security at (423) 751-4282.

rRes tfully, icrent, Nuclear Licensing

Enclosures:

1. Summary of Changes
2. "Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program," Revision 9 cc (Enclosures):

NRC Regional Administrator - Region II "Enclosure 2 Contains Safeguards Information. Upon Separation, This Page Is Decontrolled" SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 3 August 3, 2012 LRM Enclosures bcc (w/o Enclosures):

E. W. Cobey J. T. Carlin T. E. Cribbe S. M. Douglas F. A Little EDMS "Enclosure 2 Contains Safeguards Information. Upon Separation, This Page Is Decontrolled" SAFEGUARDS INFORMATION