WEEKMONTHYEAR05000265/LER-2024-002-01, Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure2024-10-300Start date: 30 October 2024 Site: Quad Cities Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-290Start date: 29 October 2024 Site: Browns Ferry Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000400/LER-2024-001-01, Automatic Reactor Trip Due to Main Generator Lock-Out2024-10-230Start date: 23 October 2024 Site: Harris Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-170Start date: 17 October 2024 Site: Sequoyah Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(iv), System Actuation 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-250Start date: 25 September 2024 Site: Sequoyah Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(iv), System Actuation 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-240Start date: 24 September 2024 Site: North Anna Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-190Start date: 19 September 2024 Site: South Texas Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(iv)(B)(6), 10 CFR 50.73(a)(2)(iv)(B)(1), 10 CFR 50.73(a)(2)(iv)(B)(8) 05000318/LER-2024-002, Automatic Reactor Trip Due to Main Turbine Loss of Load2024-09-160Start date: 16 September 2024 Site: Calvert Cliffs Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-120Start date: 12 September 2024 Site: Cook Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-050Start date: 5 September 2024 Site: Peach Bottom Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-050Start date: 5 September 2024 Site: Vogtle Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000333/LER-2024-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation2024-09-040Start date: 4 September 2024 Site: FitzPatrick Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2) 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-290Start date: 29 August 2024 Site: South Texas Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(iv)(B)(1), 10 CFR 50.73(a)(2)(iv)(B)(8) 05000387/LER-2023-004-01, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-260Start date: 26 August 2024 Site: Susquehanna Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000318/LER-2024-001-01, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-08-200Start date: 20 August 2024 Site: Calvert Cliffs Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-090Start date: 9 August 2024 Site: Vogtle Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-060Start date: 6 August 2024 Site: Vogtle Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(x) 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-050Start date: 5 August 2024 Site: Saint Lucie Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-020Start date: 2 August 2024 Site: Oconee Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-300Start date: 30 July 2024 Site: Surry Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-250Start date: 25 July 2024 Site: North Anna Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000265/LER-2024-002, Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure2024-07-220Start date: 22 July 2024 Site: Quad Cities Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000400/LER-2024-001, Automatic Reactor Trip Due to Main Generator Lock-Out2024-07-220Start date: 22 July 2024 Site: Harris Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-100Start date: 10 July 2024 Site: Waterford Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000456/LER-2024-001, Trip on Low Steam Generator Level Ddue to Failure to Verify Isolation Valves Were Open2024-07-030Start date: 3 July 2024 Site: Braidwood Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(iv)(B)(6) 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-020Start date: 2 July 2024 Site: South Texas Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(iv)(B)(1), 10 CFR 50.73(a)(2)(iv)(B)(8) 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-250Start date: 25 June 2024 Site: Palo Verde Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v), Loss of Safety Function 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-240Start date: 24 June 2024 Site: Browns Ferry Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2) 05000373/LER-2024-004, Emergency Diesel Generator Auto-Start and Load Due to Loss of Station Auxiliary Transformer2024-06-190Start date: 19 June 2024 Site: LaSalle Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(i), 10 CFR 50.73(a)(2)(x), 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded, 10 CFR 50.73(a)(2)(iii), 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System, 10 CFR 50.73(a)(2), 10 CFR 50.73(a)(2)(viii)(B) 05000348/LER-2024-002-01, Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-06-190Start date: 19 June 2024 Site: Farley Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000334/LER-2024-002, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-110Start date: 11 June 2024 Site: Beaver Valley Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(iv)(B)(6), 10 CFR 50.73(a)(2)(iv)(B)(1), 10 CFR 50.73(a)(2)(iv)(B)(8) 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-100Start date: 10 June 2024 Site: Limerick Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-040Start date: 4 June 2024 Site: River Bend Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-280Start date: 28 May 2024 Site: Grand Gulf Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-230Start date: 23 May 2024 Site: Palo Verde Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v), Loss of Safety Function 05000373/LER-2024-002, Reactor Protection System Half Scram Due to Motor Generator Set Electric Power Monitoring Assembly Output Breaker Trip2024-05-170Start date: 17 May 2024 Site: LaSalle Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-160Start date: 16 May 2024 Site: Waterford Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000265/LER-2024-001, Automatic Actuation of Reactor Protection System During Scram Discharge Volume Leak Rate Testing2024-05-100Start date: 10 May 2024 Site: Quad Cities Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000321/LER-2024-002, Manual Reactor Trip Due to Loss of Feedwater2024-05-090Start date: 9 May 2024 Site: Hatch Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-290Start date: 29 April 2024 Site: Calvert Cliffs Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-290Start date: 29 April 2024 Site: Prairie Island Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000263/LER-2024-001, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-250Start date: 25 April 2024 Site: Monticello Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000296/LER-2024-002, Breaker Trip Automatically Started an Emergency Diesel Generator2024-04-240Start date: 24 April 2024 Site: Browns Ferry Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-240Start date: 24 April 2024 Site: Calvert Cliffs Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000364/LER-2024-002, For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-04-150Start date: 15 April 2024 Site: Farley Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-120Start date: 12 April 2024 Site: Calvert Cliffs Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000325/LER-2024-002, Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization2024-04-100Start date: 10 April 2024 Site: Brunswick Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-270Start date: 27 March 2024 Site: Watts Bar Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000277/LER-2024-001, Automatic Reactor Scram Due to an Invalid Generator Lockout2024-03-210Start date: 21 March 2024 Site: Peach Bottom Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000282/LER-2023-001-01, Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables2024-03-210Start date: 21 March 2024 Site: Prairie Island Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-190Start date: 19 March 2024 Site: Hope Creek Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000391/LER-2023-003-01, Automatic Reactor Trip Due to Loss of Main Feedwater Regulating Valve Control2024-02-290Start date: 29 February 2024 Site: Watts Bar Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000416/LER-2023-002, Reactor Scram Due to Generator Stator Fault to Ground2024-02-130Start date: 13 February 2024 Site: Grand Gulf Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(viii)(B) 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-120Start date: 12 February 2024 Site: Hope Creek Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-080Start date: 8 February 2024 Site: River Bend Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000528/LER-2023-003, Control Room Essential Filtration Actuation Signal (CREFAS) Actuation with Essential Spray Pond Pump Start2024-02-010Start date: 1 February 2024 Site: Palo Verde Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v), Loss of Safety Function, 10 CFR 50.73(a)(2)(iv)(B)(9) 05000499/LER-2023-002, Automatic Actuation of Emergency Diesel Generator Due to Lockout of Switchyard Electrical Bus2024-01-300Start date: 30 January 2024 Site: South Texas Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(iv)(B)(8) 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-300Start date: 30 January 2024 Site: Nine Mile Point Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000528/LER-2023-001-02, Reactor Trip Following a Main Turbine Trip2024-01-260Start date: 26 January 2024 Site: Palo Verde Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000458/LER-2023-005, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-01-160Start date: 16 January 2024 Site: River Bend Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000364/LER-2024-001, Manual Reactor Trip Due to Rising Steam Generator Levels2024-01-110Start date: 11 January 2024 Site: Farley Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000387/LER-2023-004, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-01-090Start date: 9 January 2024 Site: Susquehanna Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000366/LER-2023-003, Manual Reactor Trip Due to Loss of Feedwater2023-12-190Start date: 19 December 2023 Site: Hatch Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(x), 10 CFR 50.73(a)(2) 05000369/LER-1923-001, Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error2023-12-130Start date: 13 December 2023 Site: McGuire Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000250/LER-2023-004, Unplanned Automatic Scram During RPS Testing2023-12-130Start date: 13 December 2023 Site: Turkey Point Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000461/LER-2017-0102017-12-090Start date: 9 December 2017, 5 February 2018 Site: Clinton Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v)(C), Loss of Safety Function - Release of Radioactive Material 05000391/LER-2017-0052018-01-250Start date: 25 January 2018 Site: Watts Bar, Watts Bar Nuclear Plant. Unit 2 Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000446/LER-2017-0032017-11-250Start date: 25 November 2017, 22 January 2018 Site: Comanche Peak, Comanche Peak Nuclear Power Plant, Unit 2 Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v), Loss of Safety Function 05000334/LER-2017-0032017-11-070Start date: 7 November 2017, 4 January 2018 Site: Beaver Valley Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000395/LER-2017-0052017-01-070Start date: 7 January 2017, 22 December 2017 Site: Summer Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000390/LER-2017-0162017-12-200Start date: 20 December 2017 Site: Watts Bar Nuclear Plant. Unit 1 Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v)(C), Loss of Safety Function - Release of Radioactive Material, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident 05000286/LER-2017-0042017-11-030Start date: 3 November 2017, 20 December 2017 Site: Indian Point Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000416/LER-2017-0072017-12-120Start date: 12 December 2017 Site: Grand Gulf Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000425/LER-2017-0022017-11-170Start date: 17 November 2017 Site: Vogtle Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000395/LER-2017-0042017-11-090Start date: 9 November 2017 Site: Summer Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000251/LER-2017-0012017-09-100Start date: 10 September 2017, 7 November 2017 Site: Turkey Point Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000220/LER-2017-0032017-09-060Start date: 6 September 2017, 2 November 2017 Site: Nine Mile Point Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000389/LER-2017-0042017-10-260Start date: 26 October 2017 Site: Saint Lucie Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000395/LER-2017-0032017-08-280Start date: 28 August 2017, 26 October 2017 Site: Summer, Vc Summer - Unit 1 Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000397/LER-2017-0042017-08-200Start date: 20 August 2017, 18 October 2017 Site: Columbia Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000390/LER-2017-0102017-08-170Start date: 17 August 2017, 10 October 2017 Site: Watts Bar Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v)(C), Loss of Safety Function - Release of Radioactive Material, 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident 05000410/LER-2017-0012017-08-050Start date: 5 August 2017, 4 October 2017 Site: Nine Mile Point Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000387/LER-2017-0052017-06-080Start date: 8 June 2017, 4 October 2017 Site: Susquehanna Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v)(C), Loss of Safety Function - Release of Radioactive Material 05000461/LER-2017-0052017-05-300Start date: 30 May 2017, 28 September 2017 Site: Clinton Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000391/LER-2017-0042017-09-250Start date: 25 September 2017 Site: Watts Bar Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000263/LER-2017-0052017-07-230Start date: 23 July 2017, 20 September 2017 Site: Monticello Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000287/LER-2017-0012017-07-240Start date: 24 July 2017, 20 September 2017 Site: Oconee, Oconee Nuclear Station Unit 3 Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000382/LER-2017-0022017-07-170Start date: 17 July 2017, 18 September 2017 Site: Waterford, Waterford Steam Electric Station, Unit 3 Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability, 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 05000325/LER-2017-0042017-09-170Start date: 17 September 2017 Site: Brunswick Steam Electric Plant (Bsep) Unit1 Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000311/LER-2016-0022016-02-040Start date: 4 February 2016, 7 September 2017 Site: Salem Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000311/LER-2015-0022015-08-050Start date: 5 August 2015, 7 September 2017 Site: Salem Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation, 10 CFR 50.73(a)(2)(iv), System Actuation 05000390/LER-2017-0042017-08-310Start date: 31 August 2017 Site: Watts Bar Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000395/LER-2017-0022017-06-290Start date: 29 June 2017, 25 August 2017 Site: Summer Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000247/LER-2017-0012017-02-060Start date: 6 February 2017, 22 August 2017 Site: Indian Point Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation 05000458/LER-2017-0072017-08-210Start date: 21 August 2017 Site: River Bend, River Bend Station — Unit 1 05000-458 Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation
[Table view] |