RA-12-082, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12)

From kanterella
Jump to navigation Jump to search

Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12)
ML12198A298
Person / Time
Site: Oyster Creek
Issue date: 07/13/2012
From: Massaro M
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-12-082
Download: ML12198A298 (3)


Text

~

.4GfIl1!Y[!JZ2)'

~'o Exelon Generation""

Oyster Creek Generating Station www.exelollcorp.com Route 9 South

~r::; ~~:r, NJ o8731SAFEGUARDS INFORMATION 10 CFR 50.54(p)(2) 10 CFR 50.4(b)(4)

RA-12-0B2 July 13, 2012 U.S. Nuclear Regulatory Commission*

ATTN: Document Control Desk Washington, D.C. 20555-0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 Docket Nos. 50-219

Subject:

Oyster Creek Nuclear Generating Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12)

In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon is submitting Revision 12 to the Oyster Creek Nuclear Generating Station (OCNGS) Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Security Plan). The changes to the OCNGS Security Plan were implemented on July 13, 2012. In accordance with 10 CFR 50.54(p)(2), Exelon is submitting this change within 60 days of implementation (Le., no later than September 11, 2012).

The OCNGS Security Plan has been revised to comply with NEI 03-12 Revision 7 template and NEI 03-12 Revision 7 SFAQ Resolutions. Details of these changes are classified as safeguards information.

Exelon has concluded that the changes do not decrease the safeguards effectiveness of the OCNGS Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.

SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS COVER LETTER 1$ DECONTROLLED

SAFEGUARDS INFORMATION U,S. Nuclear Regulatory Commission July 13, 2012 Page 2 contains Safeguards Information. Therefore, Exelon requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (a)(1)(i), and 10 CFR 73.22, " Protection of Safeguards Information: Specific Requirements," paragraph (a){1 )(i).

If you have any questions or require additional information, please contact Tim Keenan at 609-971-4953.

Respectfully, Michael J. Ma aro Vice President Oyster Creek Nuclear Generating Station Attachments: 1. Oyster Creek Nuclear Generating Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 12 (Contains Safeguards Information) cc: Regional Administrator - NRC Region I (wI attachment(s))

NRC Resident Inspector - Oyster Creek Nuclear Generating Station (wlo attachment(s>>

NRC Senior Project Manager, NRR - Oyster Creek Nuclear Generating Station (w/o attachment(s>>

SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS COVER LETTER IS DECONTROLLED

SAFEGUARDS INFORMATION u.s. Nuclear Regulatory Commission July 13, 2012 Page 3 bcc: Sr. Vice President, Mid-Atlantic Operations wlo attachments Vice President, Mid-Atlantic Operations Sr. Director, Nuclear Security - Cantera Director, Licensing and Regulatory Affairs, Mid-Atlantic - KSA-3E Site Vice President, OCNGS Plant Manager, OCNGS Director, Operations, OCNGS Manager, Site Security, OCNGS Director, Site Training, OCNGS Manager, Regulatory Assurance, OCNGS Security Operations Superintendent - KSA "

Manager, Licensing - KSA-3E "

Commitment Coordinator - KSA-3E Records Management - KSA-1 N1 SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS COVER LETTER IS DECONTROLLED