Request for Additional Information Regarding Physical Security Plan, Training and Qualifications Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program
ML12300A037
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/05/2012
From: Siva Lingam
Plant Licensing Branch II
To: James Shea
Tennessee Valley Authority
Lingam, Siva
References
TAC D91660
Download: ML12300A037 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 November 5,2012 Mr. Joseph W. Shea Vice President, Nuclear licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM (TAC NO. D91660)

Dear Mr. Shea:

By letter dated August 3, 2012, you submitted revision to Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program for Sequoyah Nuclear Plant, Units 1 and 2 in accordance with Title 10 of the Code of Federal Regulation (10 CFR), Part 50, Section 50.54(p)(2).

The U.S. Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is required to complete its evaluation. This request was discussed with Mr. Clyde Mackaman of your staff on October 31, 2012, and it was agreed that a response would be provided within 45 days from the date of this letter.

If you have any questions regarding this matter, I can be reached at 301-415*1564.

Sincerely,

~((.~

Siva P. Lingarn, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No 50-327 and 50-328

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION REGARDING PHYSICAL SECURITY PLAN CHANGES SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. SO-327 AND SO-328 By letter dated August 3, 2012 (Agencywide Documents Access and Management System Accession No. ML12219A228), the Tennessee Valley Authority (the licensee or TVA), submitted the Sequoyah Nuclear Plant's Physical Security Plan (PSP), Training and Qualification Plan, and Safeguards Contingency Plan, Revision 9. The enclosure to the letter contained Safeguards Information and has been withheld from public disclosure. The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal to ensure compliance with Title 10 of the Code of Federal Regulations (10 CFR), Part SO, Section SO.S4(p)(2). The NRC staff has determined that the additional information requested below is needed to complete its review.

Section 11.1 of the PSP describes the Owner Controlled Area (OCA) barriers at the site. The description of the employment and characteristics of OCA barriers in Revision 9 of the PSP has been modified from the description in Revision 8 of the PSP. The "Revision Log" that was submitted with the security plans addresses this change, but doesn't provide the rationale for the change nor demonstrate that an analysis, for this change, was conducted. The "Table of Deviation from NEI [Nuclear Energy Institute] 03-12 Rev. 7 Text," also identifies this change, but does not provide rationale, nor indicate that this change was analyzed. Describe the rationale for changing the employment of the site's OCA barriers. Describe whether the OCA barriers have been removed, modified or reconfigured. Describe how this change was evaluated to ensure it complies with 10 CFR SO.S4(p)(2).

Regulatory Basis:

Consistent with10 CFR SO.S4(p)(2), the licensee may make changes to the plans referenced in 10 CFR SO.S4(p)(1), without prior Commission approval if the changes do not decrease the safeguards effectiveness of the plan. The licensee shall maintain records of changes to the plans made without prior Commission approval for a period of 3 years from the date of the change, and shall submit, as specified in Section SO.4, a report containing a description of each change within 2 months after the change is made.

Consistent with 10 CFR 73.SS(c)(1 )(i), the licensee security plans must describe: how the licensee will implement requirements of this section through the establishment and maintenance of a security organization, the use of security equipment and technology, the training and qualification of security personnel, the implementation of predetermined response plans and strategies, and the protection of digital computer and communication systems and networks.

Consistent with 10 CFR 73.SS(c)(3), the licensee shall establish, maintain, and implement a PSP which describes how the performance objective and requirements set forth in this section will be implemented.

Enclosure

November 5,2012 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM (TAC NO. 091660)

Dear Mr. Shea:

By letter dated August 3, 2012. you submitted revision to Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program for Sequoyah Nuclear Plant, Units 1 and 2 in accordance with Title 10 of the Code ofFederal Regulation (1 0 CFR), Part 50, Section 50.54{p){2).

The U.S. Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is required to complete its evaluation. This request was discussed with Mr. Clyde Mackaman of your staff on October 31,2012, and it was agreed that a response would be provided within 45 days from the date of this letter.

If you have any questions regarding this matter, I can be reached at 301-415-1564.

Sincerely, IRA!

Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-327 and 50-328

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrPMSequoyah RidsNrrLABClayton RidsOgcMailCenter RidsNrrDorlDpr RidsAcrsAcnw_MailCTR RidsRgn2MailCenter R. Costa, NSIR R. Felts, NSIR BCla on 10/31112 NSIRIDSP/BC*

RFelts 10124/12 OFFICIAL RECORD COpy JQuichocho 11/2/12