ML12216A148

From kanterella
Jump to navigation Jump to search
Revision 17 to Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan
ML12216A148
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/01/2012
From: Hettel W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G02-12-106
Download: ML12216A148 (2)


Text

-A EN W. Grover Hettel Columbia Generating Station

- WL O P.O. Box 968, PE23 imKHWS Richland, WA 99352-0968 Ph. 509.377.8311 JF. 509.377.4150 whettel@energy-northwest.com SAFEGUARDS INFORMATION August 1, 2012 G02-12-106 10 CFR 50.54(p)(2)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 COLUMBIA GENERATING STATION PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION PLAN, REVISION 17

Dear Sir or Madam:

Energy Northwest has revised the subject document, hereinafter referred to as the plan, and determined that the changes do not decrease the safeguards effectiveness of the plan. In accordance with 10 CFR 50.54(p)(2), a report containing a description of each change made in Revision 17 of the plan is provided in Attachment 1. The revised plan is provided in Attachment 2.

Attachments 1 and 2 contain safeguards information and should be protected in accordance with 10 CFR 73.21.

This letter contains no new regulatory commitments. If you have any questions or require additional information, please contact Mr. K. R. Gosney at (509) 377-1050.

NOTE:

ATTACHMENTS 1 AND 2 TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENTS, THIS TRANSMITTAL LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION 7S-C)Cý)

. ý-( Lk I

COLUMBIA GENERATING STATION PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION PLAN, REVISION 17 Page 2 of 2 Respectfully, W. G. Hettel Vice President, Operations Attachments: As stated cc: NRC RIV NRC NRR Project Manager (w/o all)

NRC Senior Resident Inspector - 988C (w/o all)

AJ Rapacz - BPA - 1399 (w/o all)

WA Horin - Winston & Strawn (w/o all)