Cleve Reasoner

~*rt_. Vice President Engineering WAmeren Ameren Missouri Callaway Plant T 573.676.8241 MISSOURI F 573.676.4056 December 15, 2011 ULNRC-05830 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 APPLICATION FOR RENEWED OPERATING LICENSE (LDCN 11-0022)

Pursuant to the Code of Federal Regulations (CFR), Title 10, Parts 2, 50, 51 and 54, Ameren Missouri (Union Electric Company) herewith transmits a request for the renewal of Facility Operating License Number NPF-30 for the Callaway Plant Unit 1. The current Operating License for Callaway Plant expires at midnight on October 18, 2024. Ameren Missouri requests that the Callaway Plant Operating License be extended for 20 years beyond the current expiration date to midnight on October 18, 2044.

The enclosed License Renewal Application contains the information required by 10 CFR Parts 51 and 54 for filing an application, and the application meets the timeliness requirements of 10 CFR 54.17(c) and 10 CFR 2.1 09(b). The application includes an environmental report (Operating License Renewal Stage) prepared in accordance with 10 CFR 54.23 and 10 CFR Part 51, Subpart A. The signed original application and 13 copies are provided herewith. The copies are being provided via CD-ROM.

As required by 10 CFR 54.21(b), the enclosed License Renewal Application will be updated to address current licensing basis (CLB) changes that have a material effect on the content of the application.

The application will be updated at least annually while the license renewal application is under NRC review and at least three (3) months prior to the scheduled completion of the NRC review.

PO Box 620, MC CA-460 Fulton, MO 65251 AmerenMissouri.com

ULNRC-05830 December 15, 2011 Page2 Table A4-1 of Appendix A to the Enclosure provides a summary of commitments made in this application. Implementation of new programs may require additional action items not included in this table. Ameren Missouri will add any new program elements to docketed updates to this application and to the commitment tracking system as they evolve. It is Ameren Missouri's intent that Table A4-1 of Appendix A will be retained as historical information upon receipt of the renewed operating license, as the commitments themselves will be controlled in accordance with Callaway's Commitment Control Program.

If you have any questions on this License Renewal Application, please contact me at (573) 676-8241 or Ms. Sarah Kovaleski at (314) 225-1134.

I declare under penalty of petjury that the foregoing is true and correct.

Sincerely, Executed on: I Z. / I ) /I (


+.~~.~-----

Cleveland 0. Reasoner ill Vice President Engineering SGK/nls

Enclosure:

Callaway Plant Unit 1 License Renewal Application

ULNRC-05830 December 15, 2011 Page3 cc: U.S. Nuclear Regulatory Commission (Original and 13 copies)

Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins, Jr.

Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Brian Harris Safety Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11D19 Washington, DC 20555-0001 Mr. Mohan C. Thadani Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B1 Washington, DC 20555-2738

ULNRC-05830 December 15, 20 11 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:

A C. Heflin F. M. Diya C. 0. Reasoner ill D. W. Neterer L. H. Graessle J. S. Geyer L. H. Kanuckel G. S. Kremer S. A Maglio R. Holmes-Bobo NSRB Secretary S. G. Kovaleski T. B. Elwood G. G. Yates Ms. Diane M. Hooper (WCNOC) w/o Enclosure Mr. Tim Hope (Luminant Power) w/o Enclosure Mr. Ron Barnes (APS) w/o Enclosure Mr. Tom Baldwin (PG&E) w/o Enclosure Mr. Wayne Harrison (STPNOC) w/o Enclosure Ms. Linda Conklin (SCE) w/o Enclosure Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission Mr. Dru Buntin (DNR)