Forwards Insp Rept 50-346/98-14 on 980808-0918.No Violations Noted.Online Safety Equipment Outages Were Performed Well & IAW Established Procedures
ML20154Q589
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/14/1998
From: Kozak T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20154Q591 List:
References
50-346-98-14, NUDOCS 9810260017
Download: ML20154Q589 (2)


See also: IR 05000346/1998014

Text

4 & a " 4

l ^<

t

t

l o Octooer 14, 1998

l

Mr. John K. Wood

Vice President - Nuclear

Davis-Besse Nuclear Power Station

Centerior Service Company

5501 North State Route 2

Oak Harbor, OH 43449

SU,BJECT:

DAVIS-BESSE INSPECTION REPORT 50-346/98014(DRP)

Dear Mr. Wood:

On September.18,1998, the NRC completed an inspection at your Davis-Besse site. The

enclosed report presents the results of that inspection.

Conscientious and safe operation of the facility was observed during the inspection period.

Plant equipment operated as designed and operators were not presented with any abnormal

operating conditions. Online safety equipment outages were performed well and in accordance

with established procedures. Challenges during the outages were efficiently handled and

safety equipment was restored to service within the allotted outage times.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

original signea by

Thomas J. Kozak, Chief

Reactor Projects Branch 4-

Docket No.: 50-346

License No.: NPF-3

Enclosure: Inspection Report

. . 50-346/98014(DRP)

See Attached Distributh.n;

DOCUMENT NAME: G:\DAVl\DAV98014.DRP

vo me.iv. . . w w. ooc- unac.i. in m. im c cmumow.n.cw.nci e cm .im n.cw.aci u wo em

OFFICE Rlli [

NAME Kozak/ml

DATE 10// /98

OFFICIAL RECORD COPY

"

9810260017 981014

PDR ADOCK 05000346

G PDR

  • ,

.

'

'J. Wood -2-

cc w/ encl: J. Stetz, Senior Vice .

President - Nuclear

J. Lash, Plant Manager

.

J. Freels, Manager .

Regulatory Affairs

M. O'Reilly, FirstEnergy. .

State Liaison Officer, State

of Ohio

R. Owen, Ohio Department

. ' of Health -

' C. Glazer, State of Ohio

Public Utilities Commission

Distribution:

. Project Mgr., NRR w/enct

J. Caldwell, Rlli w/enct

C. Peterson, Rlli w/ encl

B. Clayton, Rlll w/enct '

SRI Davis-Besse w/enci

DRP w/ encl

TSS w/enci- '

DRS (2) w/enci

Rlli PRR w/enci

' PUBLIC IE-01 w/enci i

'

Docket File w/enci

GREENS

IEO (E-Mail) -

,

. DOCDESK (E-Mail). j

'/, 1

l

.

2500.24

.

__