Notice of Violation from Insp on 970112-0222.Violation Noted:Licensee Failed to Implement Appropriate Emergency Procedures,Conduct Required Drills or Renew Exemptions to Be Excluded from Stated Requirements
ML20137V138
Person / Time
Site: Mcguire, McGuire  Duke energy icon.png
Issue date: 03/24/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20137V136 List:
References
50-369-97-01, 50-369-97-1, 50-370-97-01, 50-370-97-1, NUDOCS 9704170224
Download: ML20137V138 (2)


Text

- - - _ . -- . - . - - - . . - . .- _ . - . - - - - - . . . - -

cn

!' NOTICE OF VIOLATION i

Duke Power Company Docket Nos. 50-369 and 50-370 l McGuire Nuclear Plant License Nos. NPF-9 and NPF-17 L During an NRC inspection conducted on January 12 through February 22. 1997, a l violation.of NRC requirements was identified. In accordance with the " General l Statement of Policy and Procedure for NRC Enforcement Actions." NUREG-1600, the violation is listed below:

! l I

l Part 70.24(a) of Title 10 of the Code of Federal Regulations, requires, l

in part, that each licensee authorized to possess special nuclear material (SNM) of sufficient quantity to maintain a radiation monitoring system in each area where SNM is handled or stored that will alarm if accidental criticality occurs. Furthermore, the licensee shall maintain emergency procedures for each applicable area to ensure that

.all personnel are withdrawn to an area of safety when the alarm sounds.

l The procedures must also include the conduct of drills to familiarize personnel with the evacuation plan and other key response activities.

! Contrary to the above the licensee's initial exemptions from the-L requirements of 10 CFR 70.24(a) (contained as part of its original NRC I l Materials Licenses of possessing SNM) expired when the Unit 1 and 2 l construction permits were converted to operating licenses in 1981 and i 1983 respectively. At that time, the licensee failed to implement

! appropriate emergency procedures, conduct required drills, or renew its

exemptions to be excluded from the stated requirements. Since that time, new fuel storage areas have been used to handle and store new fuel assemblies prior to each unit refueling outage.

! This is a Severity Level IV violation (Supplement IV).

l Pursuant to the provisions of 10 CFR 2.201. Duke Power Com3any is hereby .

required to submit a written statement or explanation to tle U.S. Nuclear 1

Regulatory Commission. ATTN: Document Control Desk. Washington, D.C. 20555 l with a copy to the Regional Administrator. Region II. and a copy to the NRC l

Resident Inspector at the McGuire Nuclear Plant. within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should i be clearly marked as a " Reply to a Notice of Violation" and should include for  !

l each violation: (1) the reason for the violation, or, if contested. the basis for disputing the violation. (2) the corrective steps that have been taken and j the results achieved. (3) the corrective steps that will be taken to avoid further violations, and (4) the.date when full compliance will be achieved.

l Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses-the recuired response. If an adequate reply is not received within the time specifiec in this Notice, an order or Demand for.Information may be issued as.to why the license should not be i modified, suspended, or revoked, or why such other action as may be 3 roper i should not be taken. Where good cause is shown, consideration will 3e given

to extending the response time.

Enclosure 1 9704170224 970324 PDR ADOCK 05000369 G PDR

~ -

Notice of Violation 2 Because your res)onse will be placed in the NRC Public Document Room (PDR), to the extent possi)le, it should not include any personal privacy, 3roprietary, or safeguards information so that it can be placed in the PDR wit 1out redaction. However, if you find it necessary to include such information. you should clearly indicate the specific information that you desire not to be placed in the PDR, and provide the legal basis to support your request for withholding the information from the public.

, Dated at Atlanta, Georgia

.. this$$hdidayofMarch,1997 4

0 f

d Enclosure 1