ML20055B009

From kanterella
Jump to navigation Jump to search
Corrected Monthly Refueling Info Requests for May 1982
ML20055B009
Person / Time
Site: Oconee  Duke energy icon.png
Issue date: 06/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20055B006 List:
References
NUDOCS 8207200251
Download: ML20055B009 (2)


Text

_

..t --

y. .

, MONTF N.ETUEt,ljjG I Nro.vtAT 1033 RE0uM1

1. Facility name: Oconee Unit 2 .

2 .- Scheduled next refueling shutdown: October 1983 . ,

3. Scheduled restart following refueling: December.1983 ,

l

4. Will refueling or resumption of operation thereaf ter require a technical spacification change or other license amendment? Yes .

If yes, what will these be?

Technical Specification Revision' If no, has reload design and core configuration been reviewed by Safety Review Co=mittee regarding unreviewed safety questions? N/A . .

If no, when is review scheduled? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting inf o rma tion : Unknown 6.

I=portant licensing considerations (new or dif ferent design or supplier, un:eviewed design or performance analysis methods, significant changes in design or new operating procedures).

7. Number of fuel assemblies (a) in the core: 177 .

(b) in the spent fuel pool: 724* ,

8. Present licensed fuel pool capacity: 1312* ,

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity:

DUKE PC'.JER COMPAtri Date: June 15, 1982 ,

Name of

Contact:

J. A. Reavis

  • Renrosanec *ba total for the combined Units 1 & 2 i 8207200251 820715 PDR ADOCK 05000269 R PDR

a- *

[t0,qji Q RFM.Eg JG INFADNAT g ?f,Q i

1. Facility name: Oconee Unit 3 ,

i 2. Scheduled next refueling shutdown: Unknown . .

i j

3. Scheduled restart following refueling: Unknown ,

t

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .

If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

If no, when is review scheduled? N/A .

5.

Scheduled date(s) for submitting pro osed licensing action and supporting inf o rma tion: Unknown .

6.

I=portant licensing considerations (new or dif ferent design or supplier, unreviewed design or performance analysis methods, significant-changes in design or new operating procedures).

t

7. Number of fuel assemblies (a) in the core: Refueling (b) in the spent fuel pool: 371 ,
8. Present licensed fuel pool capacity: 474 ,

Size of requested or planned increase: .

9.

Projected date of last refueling which can be accommodated by present licensed capacity: .

DUKE POWER COMPANY Date: June 15, 1982 ,

Name of

Contact:

_.J. A. Reavis ,

.= = _

_ ,