ML20055B008
Jump to navigation
Jump to search
| ML20055B008 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 07/15/1982 |
| From: | Reavis J DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20055B006 | List: |
| References | |
| NUDOCS 8207200249 | |
| Download: ML20055B008 (1) | |
Text
r OPERATING DATA REPORT DOCKET S0.
50-287 CORRECTED COPY DATE 7-15-82 COSIPLETED BY J. A. Reavis TELEPHONE 7nt 17' R552 OPERATING STATUS
- 1. Unit Name:
Oconee #3 No tes Year-to-date and cummulative
- 2. Reporting Period:
April 1.
1982 - April 30 1987 capacity factors are calcu-
- 3. Licensed Thermal Power OlWt):
2568 lated using a weighted
- 4. Nameplate Rating (Gross 5twei:
934 average f r maximum 886
.s. Design Electrical Rating (Net atWe):
dependable capacity.
- 6. Staximum Dependable Capacity (Gross StWe):
809 l
- 7. Staximum Dependable Capacity (Net StWe):
860 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None i
i
- 9. Power Level To which Restricted. If Any (Net 31We):
None
- 10. Reasons For Restrictions !f Any:
e his hionth Yr..to.Date Cumulative
- 11. Hours in Reporting Period 719.0 2 879.0 64 631.0
- 12. Number Of Hours Reactor Was Critical 556.2 1 709.6 47 023.5
- 13. Reactor Reserve Shutdown Hours
-~
- 14. Hours Generator On.Line 555.3 1 702.3 46 018.4
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (StWH) 1 412 675 4 322 647 111 841 386 17 Gross Electrical Energy Generated (StWH) 489 550 1 494 110 38 640 924
- 13. Net Electrical Energy Generated (StWH) 467 902 1 423 652 36 775 128 l
- 19. Urut Service Factor 77.2 59.1 71.2
- 20. Unit Availability Factor 77.2 59.1 71.2
- 21. Umt Capacity Factor iUsing 31DC Nett 75.7 57.5 65.9
- 22. Unit Capacity Factor iUsing DER Net) 73.5 55.8 64.2 l
-23. Unit Forced Outage Rate 0.0 37.3 16.1
- 24. Shutdowns Scheduled Over Next o stonths tType. Date and Duration of Eacht Current 1v Refueling
- 25. If Shut Down At End Of Report Penod. Estimated Date of ',,tartup:
- 26. Units in Test Status iPnor to Commercial Operation):
Forecast Achieved l A' INITIA L CRITICA LITY INITIAL ELECTRICITY COstStERCIAL OPER ATION 8207200249 820715 PDR ADOCK 05000269 PDR R
gof- ;