r OPERATING DATA REPORT DOCKET S0.

50-287 CORRECTED COPY DATE 7-15-82 COSIPLETED BY J. A. Reavis TELEPHONE 7nt 17' R552 OPERATING STATUS

1. Unit Name:

Oconee #3 No tes Year-to-date and cummulative

2. Reporting Period:

April 1.

1982 - April 30 1987 capacity factors are calcu-

3. Licensed Thermal Power OlWt):

2568 lated using a weighted

4. Nameplate Rating (Gross 5twei:

934 average f r maximum 886

.s. Design Electrical Rating (Net atWe):

dependable capacity.

6. Staximum Dependable Capacity (Gross StWe):

809 l

7. Staximum Dependable Capacity (Net StWe):

860 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None i

i

9. Power Level To which Restricted. If Any (Net 31We):

None

10. Reasons For Restrictions !f Any:

e his hionth Yr..to.Date Cumulative

11. Hours in Reporting Period 719.0 2 879.0 64 631.0
12. Number Of Hours Reactor Was Critical 556.2 1 709.6 47 023.5
13. Reactor Reserve Shutdown Hours

-~

14. Hours Generator On.Line 555.3 1 702.3 46 018.4
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (StWH) 1 412 675 4 322 647 111 841 386 17 Gross Electrical Energy Generated (StWH) 489 550 1 494 110 38 640 924
13. Net Electrical Energy Generated (StWH) 467 902 1 423 652 36 775 128 l
19. Urut Service Factor 77.2 59.1 71.2
20. Unit Availability Factor 77.2 59.1 71.2
21. Umt Capacity Factor iUsing 31DC Nett 75.7 57.5 65.9
22. Unit Capacity Factor iUsing DER Net) 73.5 55.8 64.2 l

-23. Unit Forced Outage Rate 0.0 37.3 16.1

24. Shutdowns Scheduled Over Next o stonths tType. Date and Duration of Eacht Current 1v Refueling
25. If Shut Down At End Of Report Penod. Estimated Date of ',,tartup:
26. Units in Test Status iPnor to Commercial Operation):

Forecast Achieved l A' INITIA L CRITICA LITY INITIAL ELECTRICITY COstStERCIAL OPER ATION 8207200249 820715 PDR ADOCK 05000269 PDR R