Pages that link to "ML20151U677"
Jump to navigation
Jump to search
The following pages link to ML20151U677:
Displayed 50 items.
- PNO-II-85-112, on 851123,Limitorque Valve Motors Inside & Outside Containment Bldg Inspected After Util Determined That Some Motors May Not Be Environmentally Qualified.Unit Will Be Restarted.Insp of Unit 3 Motors Planned (← links)
- PNO-II-86-003, on 860107,unscheduled Shutdown Lasted Longer than 48 H Due to Damaged Steam Supply Stop Check Valve in Each Auxiliary Feedwater Sys Train.Remaining Valves Being Inspected (← links)
- PNO-II-86-004, on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm (← links)
- PNO-II-85-088, on 850910,reactor Manually Tripped from 100% Power.Caused by Excessive Vibration in Reactor Coolant Pump & Loose Parts Monitor Alarm in Same Cooling Loop.Unit in Cold Shutdown for Investigation of Problem & Repairs (← links)
- PNO-II-85-085, on 850824,leaking Oil from Reactor Coolant Pump Lower Motor Reservoir Contacted Pump Casing & Caught Fire.Caused by Failure of Lower Bearing & Oil Seal.Pump & Motor Vendors Contacted for Technical Assistance (← links)
- PNO-II-85-097, on 851021,notification Received That Reactor Will Be Shut Down for Approx 8-10 Days to Repair Boot Seal Between Condenser & Low Pressure Turbine.Region II Will Conduct Routine Followup (← links)
- PNO-II-85-076, on 850808,reactor Tripped from 99% Power. Caused by Two Blown Fuses.Unit Proceeding to Cold Shutdown & Will Be Out of Svc for 10 Days While Cause Investigated & Reactor Coolant Pumps Inspected (← links)
- ML20151X532 (← links)
- PNO-II-88-027, on 880415,ENERCON Svc,Inc Completed Independent Mgt Appraisal of Plant Nuclear Operations Per NRC Order EA 87-85.Licensee Issued News W/Appraisal on 880418 & Currently Reviewing Appraisal.State of Fl Informed (← links)
- ML20151U665 (← links)
- ML20151U484 (← links)
- ML20151U452 (← links)
- PNO-II-88-005, on 880113,manual Reactor Trip Initiated Per off-normal Procedure.Caused by Loss of Power to Movable Gripper Coils.Unit Will Remain Down for Approx 10 Days Due to Pinhole Leak in Canopy Seal for Rod D-8 (← links)
- PNO-II-99-023, on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems (← links)
- PNO-II-83-058, on 830809,St Lucie Unit 2 Completed 100-hour Test Run at Full Power.Test Was Culmination of Power Ascension Testing Which Began After Full Power License Was Issued on 830610.Placed Into Commercial Operation on 830808 (← links)
- PNO-II-83-081, on 831012,FPL Took Unit Out Svc Because of Failure of One of Two Rhrps.Determined Rhrp Failure on 831011 Was Due to Short Circuit Caused by Water in Terminal Box Which Houses Pump Motor Leads (← links)
- PNO-II-84-039, on 840625,10 Gpm Primary Coolant Leak Inside Containment Bldg Caused Slight Increase in Pressure & Containment Radiation Levels.Reactor Placed in Cold Shutdown for Corrective Maint on Root Valve (← links)
- PNO-II-85-105, on 851106,while Removing Core Internals Upper Guide Structure,One Lifting Rig Attachment Failed.Refueling Operations Halted W/Structure in Apparently Stable Position. NSSS Vendor Being Contacted (← links)
- PNO-II-87-019, Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding Areas (← links)
- PNO-II-87-020, on 870319,facility Made Critical,For First Time Since 861209,feed Sys Pipe Rupture.Extensive Replacement of Feedwater Piping in Both Units Completed & Program for Periodic Insp of Sys Instituted (← links)
- PNO-II-80-031, on 800219,18 Gallons of Extraneous Liquid & Resin Found in Radwaste Shipment.Source of Liquid & Resin at Bottom of Shipping Cask Not Confirmed.Shipment Loaded in Rain & Overfilled (← links)
- PNO-II-93-025, on 930610,controlled Shutdown from 100% Power to Mode 5 to Repair Secondary Steam Leak Began.Licensee Planning to Complete Repairs & Return Unit on Line as Early as 930613 (← links)
- PNO-II-93-001, on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified (← links)
- ML20207G431 (← links)
- PNO-II-87-017, media Interest Developed Re Air Lock Problem Identified When Routine Surveillance Test Indicated Minor Pressure Leakage on Inside Door of Personnel Lock.Unit to Be Retested & Returned to Svc (← links)
- IR 05000250/1987016 (← links)
- ML20249B526 (← links)
- ML20249B317 (← links)
- ML20249B228 (← links)
- ML20249B080 (← links)
- ML20249A904 (← links)
- ML20249A862 (← links)
- ML20249A654 (← links)
- ML20249A539 (← links)
- ML20248L013 (← links)
- ML20236U015 (← links)
- PNO-II-87-075, on 871021 & 25,voiding Noted in Vessel Head Regions.Caused by Mispositioned Manual Valve in Nitrogen Vent Line.Investigation Continuing (← links)
- ML20236F554 (← links)
- ML20236F440 (← links)
- ML20236F407 (← links)
- ML20236F338 (← links)
- PNO-II-87-074, on 870929,24 H Control Room Coverage Initiated by NRC in Response to Determination That Licensee Violated 10CFR50.54 by Allowing Nonlicensed Person to Manipulate Reactor Dilution Controls (← links)
- PNO-II-87-066, on 871008,licensee Calculated Leakage Above Required Tech Spec Limits.Cause Could Not Be Identified. Reactor Shut Down Based on Leakage & Results of Containment Insp (← links)
- PNO-II-87-062, on 870926,nonlicensed Person Not in Training Status Allowed to Manipulate Reactor Dilution Controls in Control Room.Cause Not Stated.Licensed Personnel Had Prepared Sys Properly for Manipulation of Controls (← links)
- ML20216K132 (← links)
- ML20216J702 (← links)
- PNO-II-86-066, on 860920,leaking Relief Valve on Storage Tube on Hydrogen Trailer Discovered.Other Tubes Isolated from Leak,Area Roped Off & Smoking Prohibited.Event Terminated on 860921 (← links)
- PNO-II-88-030A, on 880517,during Police Interview,Security Officer at Turkey Point Admitted That Story Told Last Week of Exchanging Shots W/Three Unidentified Persons During Early Morning Hours of 880506 Near Plant False (← links)
- PNO-II-86-040, on 860606,util Took Facility Out of Svc to Begin Plugging 17 Degraded Steam Generator Tubes.Unit Will Be Shut Down Approx 2 Wks.Tube Degradation Discovered on 860523 in Eddy Current Data Taken During Oct-Dec 1985 (← links)
- PNO-II-86-032, on 860428,iron Workers Employed by Util Contractor Walked Off Job & Set Up Picket Lines at All Four Entrances to Facility.Union Workers Refusing to Cross Picket Lines.Security Forces & Senior Reactor Operators on Job (← links)