MONTHYEARML0514701152005-05-27027 May 2005 RAI, Response to Generic Letter 2004-02 Project stage: RAI ML0603704402006-02-0909 February 2006 RAI - Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accident at Pressurized-Water Reactors Project stage: RAI ML0729706052007-10-24024 October 2007 Exigent License Amendment Request Re Alternative Containment Analysis Methodology Supporting Information - Gothic Model Input Files Project stage: Other ML0731905532007-11-15015 November 2007 North Anna, Units 1 and 2, and Surry, Units 1& 2, Request for Extension of Completion Dates for Corrective Actions Regarding NRC Generic Letter 2004-02 Project stage: Request ML0734505942007-12-13013 December 2007 Approval of Extension of Completion Dates for Corrective Actions of Generic Letter 2004-02 Project stage: Other ML0806505632008-02-29029 February 2008 Supplemental Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0806505622008-02-29029 February 2008 Supplemental Response to NRC GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0806503142008-02-29029 February 2008 Kewaunee, NRC Generic Letter 2004-02 Supplemental Response, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0814306122008-05-22022 May 2008 Units 1 & 2 - NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors Request for Interim. Project stage: Request ML0814905722008-05-29029 May 2008 Request for Extension of Completion Dates for Generic Letter 2004-02 Corrective Actions Project stage: Other ML0818302472008-07-0101 July 2008 Request for Extension of Completion Dates for Generic Letter 2004-02 Corrective Actions Project stage: Other ML0917406492009-06-22022 June 2009 Draft RAI on Generic Letter 2004-02 Re. Potential Impact of Debris Blockage of PWR Sumps Project stage: Draft RAI ML0917406412009-06-22022 June 2009 Transmits Draft RAI on Generic Letter 2004-02 Re. Potential Impact of Debris Blockage of PWR Sumps Project stage: Draft RAI ML0920400062009-08-14014 August 2009 RAI, Regarding Response to Generic Letter 2004-02 (Tac No. MC4691) Project stage: RAI ML0924404262009-08-24024 August 2009 Attachment 1 - Volume 10, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling System (ECCS) Revision 0 Project stage: Request ML0923801712009-08-28028 August 2009 Notice of Telephone Conference Meeting with Dominion Energy Kewaunee, to Discuss Licensee'S Proposed Response to Request Regarding Generic Letter 2004-02 Project stage: Meeting ML0926006432009-09-15015 September 2009 Handout 3 - Kewaunee Power Station, Agenda Setting Meeting 09/15/09 Project stage: Meeting ML0926003762009-09-15015 September 2009 Handout 2 - Drawings, Analyzed RCS - Not Limiting Break Project stage: Other ML0926000182009-09-15015 September 2009 Handout 1 - GSI-191 Resolution for Kewaunee Power Station Project stage: Other ML0926008992009-09-28028 September 2009 (KPS) - Summary of 9/15/09 Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML0928702112009-10-14014 October 2009 Revised Questions 4, 6, 7, and 12 of Formal RAI Dated 08/14/2009 GL 2004-02 Project stage: RAI ML1011707792010-04-30030 April 2010 Notice of Meeting with Kewaunee Personnel to Discuss Kewaunee'S Proposed Response to an RAI Regarding Generic Letter 2004-02 Project stage: RAI ML1014005072010-05-19019 May 2010 E-mail Handouts for the 5/20/2010 Kewaunee Public Meeting Project stage: Meeting ML1014106432010-06-0909 June 2010 May 20, 2010 Summary of Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02 Project stage: RAI 2009-10-14
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML19289D4842019-10-24024 October 2019 Summary for NEIMA-Kewaunee Meeting on 9/24/2019 ML16190A3452016-07-13013 July 2016 Inc. Pre-Submittal Meeting Regarding Load Drop Analysis for Spent Fuel Cask Handling Operations at Kewaunee Power Station (L53130) ML15223B2832015-08-11011 August 2015 Summary of Public Meeting to Discuss NRC Activities at the Kewaunee Power Station ML13205A0832013-07-24024 July 2013 Summary of Public Meeting to Discuss the 2012 Kewaunee Power Station End-of-Cycle Performance Assessment ML12352A2822012-12-31031 December 2012 Summary of Meeting with Dominion Energy Kewaunee on Implementation of Orders Japan Lessons Learned Effort ML12292A0942012-10-17017 October 2012 Summary of Public Meeting to Discuss the Prairie Island Nuclear Generating Plant, Unit 2 Steam Generators Replacement Activities ML11173A2772011-06-22022 June 2011 Summary of the Public Meeting with Dominion Energy Kewaunee, Inc., to Discuss the Kewaunee Power Station End-Of-Cycle Performance Assessment for 2010 ML1024402012010-09-16016 September 2010 08/31/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the U.S. Nuclear Regulatory Commission Concerning a Draft Request for Additional Information Pertaining to the Kewaunee Power Station License Renewal A ML1023901982010-09-16016 September 2010 08/26/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and NRC Concerning a D-RAI Pertaining to the Kewaunee Power Station License Renewal Application ML1014106432010-06-0909 June 2010 May 20, 2010 Summary of Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02 ML1012601102010-05-18018 May 2010 Summary of Public Meetings Conducted to Discuss the Draft Supplement Environmental Impact Statement Related to the Review of the Kewaunee Power Station License Renewal Application ML1012600702010-05-0505 May 2010 Summary of Public Meeting to Discuss the 2009 Kewaunee End-Of-Cycle Performance Assessment ML1007107412010-03-31031 March 2010 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the NRC to Discuss Certain RAI Responses on Two Mechanical Systems ML1001104472010-01-13013 January 2010 Summary of Telephone Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Duplicate RAI Number ML0932400382009-11-27027 November 2009 Summary of Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Inaccessible Cables Program ML0932302572009-11-27027 November 2009 Summary of Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Program for Neutron Absorbing Material ML0926008992009-09-28028 September 2009 (KPS) - Summary of 9/15/09 Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02 ML0921801372009-08-12012 August 2009 Summary Site Audit Related to the Review of the License Renewal Application for Kewaunee Power Station ML0921006122009-08-10010 August 2009 07/28/2009 Summary of Public Meeting Related to the Review of the Kewaunee Power Station License Renewal Application ML0918205652009-07-0808 July 2009 Summary of Conference Calls with Dominion Energy Kewaunee, Inc., to Discuss Response to Follow-Up Question Regarding Severe Accident Mitigation Alternatives Request for Additional Information for Kewaunee Power Station ML0916904292009-06-17017 June 2009 Summary of Public Meeting with NRC and Members of the Kewaunee Power Station Emergency Preparedness Staff to Discuss the June 2009 Kewaunee Emergency Preparedness Exercise ML0913300252009-05-21021 May 2009 Summary of Meeting with Kewaunee to Discuss a Future Amendment to Convert the Plant TS from Custom to Improved TS Format ML0913403292009-05-14014 May 2009 Summary of Meeting Between NRC Region III Management and Dominion Energy Kewaunee, Inc. Representatives to Discuss the 2008 Kewaunee End-of-Cycle Performance Assessment ML0900801102009-02-0505 February 2009 Summary of Meeting Between NRC Staff and Kewaunee to Discuss a Future Amendment to Convert Technical Specifications to the Improved Standard TS Format ML0830904522008-11-17017 November 2008 10/22/08 Summary of Public License Renewal Overview and Environmental Scoping Meeting Related to the Review of the Kewaunee Power Station License Renewal Application ML0815607282008-05-29029 May 2008 Ltr. 05/29/08 Kewaunee Re Non-Public Meeting Summary ML0810202352008-04-11011 April 2008 Summary of Meeting Between NRC Region III Management and Dominion Energy Kewaunee, Inc. Representatives to Discuss the Nrc'S Assessment ML0802304472008-01-25025 January 2008 Summary of Meeting with Dominion Energy Kewaunee Inc. Licensee'S Amendment Request on Seismic Methodology for Analysis of Auxiliary Building Crane ML0729601702007-10-31031 October 2007 Public Meeting Summary on the Reactor Oversight Process ML0729005732007-10-17017 October 2007 Summary of Public Meeting with Dominion Energy Kewaunee to Discuss the Ongoing Substantive Cross-Cutting Issues ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0721900152007-08-0909 August 2007 8/2/07 Public Meeting Summary on the Kewaunee Appeal of a Frequently Asked Question on the Mitigating Systems Performance Index ML0709504642007-04-0505 April 2007 Summary of Public Meeting with Dominion Energy Kewaunee, Inc. Regarding the Kewaunee End-of-Cycle Plant Performance Assessment ML0703304272007-02-26026 February 2007 Summary of January 25, 2007, Meeting with Dominion Energy Kewaunee Inc., on the Licensee'S Amendment Request Regarding the Use of TORMIS Methodology ML0634605062006-12-12012 December 2006 Summary of Public Meeting with Dominion to Discuss Revised Risk Assessment Information and Future Actions for Kewaunee Power Station ML0618405302006-07-0303 July 2006 Public Meeting Summary with Kewaunee to Discuss Improvement Initiatives ML0609005782006-03-30030 March 2006 Public Meeting Summary Kewaunee End-of-Cycle Plant Performance Assessment ML0604000982006-02-24024 February 2006 Summary of Meeting with Dominion Energy Kewaunee, Inc., to Discuss the Applicability of Dominion Safety and Core Design Methods to Kewaunee Power Station ML0532103612005-11-16016 November 2005 Kewaunee Public Meeting Summary, Regulatory Conference for Flooding Issue and Management Meeting ML0527702352005-09-29029 September 2005 Summary of the August 9, 2005, Public Meeting to Discuss the Kewaunee End-of-Cycle Plant Performance Assessment ML0513100572005-05-12012 May 2005 Summary of Meeting with Nuclear Management Company, LLC Regarding the Auxiliary Feedwater Amendment Request Dated May 5, 2005, and the Internal Flooding Design Basis ML0507505452005-03-18018 March 2005 3/18/05, Kewaunee, Summary of Telephone Conference Steam Generator Water Chemistry Excursion (TAC No. M40695) ML0435801802004-12-22022 December 2004 Summary of Public Meeting with Nuclear Management Company, Llc. to Discuss Engineering Initiatives ML0418202382004-05-21021 May 2004 Public Meeting Summary with Nuclear Management Company, LLC Re Kewaunee 2003 End-of-Cycle Assessment ML0333709182003-12-15015 December 2003 Summary of Meeting with Nuclear Management Company, LLC, Regarding Amendment Requests to Use Alternate Source Term Methodology at Prairie Island and Kewaunee ML0323103952003-08-18018 August 2003 Point Beach & Kewaunee Meeting Summary Reactor Vessel Head Replacement Activities ML0323101482003-08-18018 August 2003 Point Beach & Kewaunee Meeting Summary Reactor Vessel Head Replacement Activities ML0312504092003-04-21021 April 2003 Public Meeting Summary with Nuclear Management Co. LLC Kewaunee to Discuss Kewaunee Performance Re EOC ML0222502832002-08-20020 August 2002 Summary of Meeting Between the NRC Staff and Nuclear Management Company, LLC Upcoming Power Uprate and Associated Submittals for Kewaunee ML0214900232002-05-31031 May 2002 Meeting with Nuclear Management Company, LLC, to Discuss Their Response to Interim Compensatory Measure B.2.b of the Security Orders 2019-10-24
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 June 9, 2010 LICENSEE:
Dominion Energy Kewaunee, Inc. FACILITY:
Kewaunee Power Station
SUBJECT:
SUMMARY
OF MAY 20, 2010, MEETING REGARDING THE LICENSEE'S PROPOSED RESPONSE TO THE REQUEST FOR ADDITIONAL INFORMATION ON GENERIC LETTER 2004-02 (TAC NO. MC4691) On May 20,2010, the Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting by telephone with Dominion Energy Kewaunee, Inc. (the licensee).
The purpose of the meeting was to discuss the licensee's proposed response to a Request for Additional Information (RAI) dated August 14, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092040006) regarding Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design-Basis Accidents at Pressurized-Water Reactors." Attendees of the meeting are listed in Enclosure
- 1. The licensee had previously provided draft responses to the RAI questions.
The collection of draft responses is included as Enclosure 2 (Accession No. ML 101400507).
The NRC staff reviewed the draft responses and provided the following comments to licensee personnel: NRC Staff Comment on Draft Response Adequate as is. Adequate as is; proposed response says no Temp Mat will be remaining for the limiting breaks. Adequate as is because all debris is treated as fines. Adequate as is based on treatment of all debris as fines. The NRC staff stated that the licensee should plan to clean the containment each refueling outage and that the licensee should follow the NRC safety evaluation on NEI04-07, "Pressurized Water Reactor Sump Performance Evaluation Methodology," guidelines for sampling periodicity.
Licensee personnel said that they will find reference in their submittals where cleaning procedures are described.
Licensee personnel also stated that they plan to sample initially every other outage, and will adjust the frequency based on results and performance.
Licensee personnel further stated that they will clean the containment each time. These changes will be included in the formal response; accordingly, the response, as modified above, is considered adequate.
-2The licensee will clearly state that the separate debris interceptor testing will not be created, and the licensee will delete the statement that says results of the fiber transport test are still valid. With these changes, this response is considered adequate. 10 -Adequate as is Licensee personnel stated that they plan to remove most fibrous material, and what remains will be trended as fines. They plan to rely on an analytical argument that they will not have a filtering bed and on the existing test result in the presence of much less debris than previously evaluated. The NRC staff's view is that demonstrating analytically a bed will not form is the most likely success path. This item referring to the existing testing is not considered resolved but may be amenable to holistic resolution via established NRC staff practice.
13 Adequate as is Licensee personnel stated that they would remove this response and would commit to removing material so they are no longer relying on Computational Fluid Dynamics (CFD) characterization of containment flow. The NRC staff stated that is an acceptable response, but that absence of demonstration of flow would not support confidence in the test result; the licensee should rely on the analytical approach it has described. Licensee personnel stated that they will make this response similar to 15 above, removing existing text and replacing it with a statement that commits to removing material and no longer relying on CFD for characterization of flow. NRC staff response was same as for 15 above.
17 Adequate as is Discussion of clean strainer head and head loss is adequate. The NRC staff will not rely on debris head loss results: thus, the balance of this response can remain in the formal response but will not be used by the NRC staff in its review. 20 -Adequate as is The licensee should more fully discuss the rationale for level and safety injection flow differences for the two scenarios, and revise and discuss with the NRC staff this revised draft response before formal submittal. Licensee personnel committed to provide a revised draft response by June 3, 2010; NRC staff participants agreed to provide feedback on the revised draft response by June 10,2010. Adequate as is Licensee personnel stated that they will state in the formal response that the licensee intends to remove the 1"x1" grid in the reactor cavity drain standpipe.
This response is adequate with this modification.
41 -3This will be resolved as part of the NRC staff review of WCAP-16793, "Evaluation on Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in the Recirculating Fluid," on which the licensee relies. 42-44 Adequate as is The NRC staff had the following additional comments: The licensee should clarify Table B-1 by removing Note 1 and recalculating table entries accordingly, and then recalculating allowable latent debris. The licensee should make a physical, qualitative argument that miscellaneous debris will not be transported to the strainer, and the licensee should include discussion of interceptors and material-specific transport properties. After the NRC staff provided its feedback on the licensee's revised draft response to 32, the licensee should formally submit its entire response within 30 days. The licensee's discussion regarding zone of influence for inorganic zinc coatings is acceptable as is. No comment was received via the Public Meeting Feedback form. Please direct any inquiries to me at S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305
Enclosures:
- 1. List of Attendees
- 2. Draft responses by the licensee cc w/Enclosure 1: Distribution via ListServ T. Breene L. Christensen P. Furio* J. Gadzala D. Hoang J. Kasper M. Khanna J. Lehning G. Miller S. Putman M. Scott S. Smith P.Tam R. Torres S. Yuen NRC and Dominion Energy Kewaunee, Inc. (DEK) Meeting of May 20! 2010 List of Attendees (in alphabetical order) Organization DEK DEK Calvert Cliffs Nuclear Plant DEK NRC/NRR/Mechanical
& Civil Engineering Branch DEK NRC/NRR/Mechanical
& Civil Engineering Branch NRC/NRRISafety Issue Resolution Branch DEK DEK NRC/NRRISafety Issue Resolution Branch NRC/NRRISafety Issue Resolution Branch NRC/NRR/Plant Licensing Branch 111-1 I\JRC/NRRISafety Issue Resolution Branch DEK *Member of the public, present as observer Enclosure 1
41 June 9, 2010 -3This will be resolved as part of the NRC staff review of WCAP-16793, "Evaluation on Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in the Recirculating Fluid," on which the licensee relies. 42 -44 Adequate as is The NRC staff had the following additional comments: The licensee should clarify Table B-1 by removing Note 1 and recalculating table entries accordingly, and then recalculating allowable latent debris. The licensee should make a physical, qualitative argument that miscellaneous debris will not be transported to the strainer, and the licensee should include discussion of interceptors and material-specific transport properties. After the NRC staff provided its feedback on the licensee's revised draft response to 32, the licensee should formally submit its entire response within 30 days. The licensee's discussion regarding zone of influence for inorganic zinc coatings is acceptable as is. No comment was received via the Public Meeting Feedback form. Please direct any inquiries to me at 301-415-1451.
IRAJ Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305
Enclosures:
- 1. List of Attendees
- 2. Draft responses by the licensee cc w/Enclosure 1: Distribution via ListServ DISTRIBUTION:
PUBLIC LPL3-1 r/f RidsNrrDorlLpl3-1 Resource RidsNrrLABTully Resource RidsNrrDssSbpb R. Krsek, Region III RidsNrrDeEmcb RidsAcrsAcnw_MailCTR Resource P. Tam, NRR S. Smith, NRR D. Hoang, J. Lehning, NRR R. Torres, NRR M. Scott, RidsRgn3MailCenter Resource S. Bagley, EDO Rill M. Kunowski, Region III ADAMS ACCESSION NUMBERS: Package -ML101380268 S ummary-ML 101410643 -ML101400 507 Meeting N otice-ML1 01170779 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/DSS/SSIB/BC NAME PTam BTuily MScott DATE 6/9/10 5/26/10 6/9/10 NRR/LPL3-1/BC RPascarelli 6/9/10 OFFICIAL RECORD COpy