Letter Sequence Other |
---|
|
|
MONTHYEARML0514701152005-05-27027 May 2005 RAI, Response to Generic Letter 2004-02 Project stage: RAI ML0603704402006-02-0909 February 2006 RAI - Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accident at Pressurized-Water Reactors Project stage: RAI ML0603800172006-02-0909 February 2006 RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors. Project stage: RAI ML0603801882006-02-0909 February 2006 RAI Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors (Tac MC4694) Project stage: RAI ML0603704632006-02-0909 February 2006 RAI, Response to GL-2004-02, Potential Impact to Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors. Project stage: RAI ML0603801992006-02-0909 February 2006 RAI Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: RAI ML0721205432007-08-0909 August 2007 Draft Open Items from Staff Audit of Corrective Actions to Address GL 2004-02 Project stage: Draft Other ML0722905502007-08-30030 August 2007 GSI-191, Generic Letter 2004-02 Corrective Actions Audit Report Project stage: Acceptance Review ML0722905312007-08-30030 August 2007 Report on Results of Staff Audit of Corrective Actions to Address Generic Letter 2004-02 Project stage: Other ML0729706052007-10-24024 October 2007 Exigent License Amendment Request Re Alternative Containment Analysis Methodology Supporting Information - Gothic Model Input Files Project stage: Other ML0731905532007-11-15015 November 2007 North Anna, Units 1 and 2, and Surry, Units 1& 2, Request for Extension of Completion Dates for Corrective Actions Regarding NRC Generic Letter 2004-02 Project stage: Request ML0727404002007-11-15015 November 2007 Corrective Actions for Generic Letter 2004-02 Project stage: Acceptance Review ML0731001672007-11-15015 November 2007 Report on Results of Staff Audit of Corrective Actions to Address Generic Letter 2004-02 Project stage: Other ML0734505942007-12-13013 December 2007 Approval of Extension of Completion Dates for Corrective Actions of Generic Letter 2004-02 Project stage: Other ML0806505632008-02-29029 February 2008 Supplemental Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0806503142008-02-29029 February 2008 Kewaunee, NRC Generic Letter 2004-02 Supplemental Response, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0806505622008-02-29029 February 2008 Supplemental Response to NRC GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0814207932008-05-21021 May 2008 North Anna, Units 1 and 2, and Surry, Units 1 & 2, NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Request.. Project stage: Request ML0814306122008-05-22022 May 2008 Units 1 & 2 - NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors Request for Interim. Project stage: Request ML0814905722008-05-29029 May 2008 Request for Extension of Completion Dates for Generic Letter 2004-02 Corrective Actions Project stage: Other ML0818302472008-07-0101 July 2008 Request for Extension of Completion Dates for Generic Letter 2004-02 Corrective Actions Project stage: Other ML0821301802008-08-0404 August 2008 Audit Report of Corrective Actions for Generic Letter 2004-02 Project stage: Other ML0825404952008-09-0505 September 2008 North Anna and Surry Power Station, Units 1 and 2, NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Accidents at Pressurized-water Reactors Request for Extension of Completion Dates for Corrective Actions Project stage: Request ML0827300222008-09-29029 September 2008 Request for Extension of Completion Dates for Generic Letter 2004-02 Corrective Actions Project stage: Other ML0832304692008-12-17017 December 2008 Request for Additional Information, GL 2004-02 Project stage: RAI ML0915409542009-06-18018 June 2009 Request for Additional Information Regarding Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors: Extension Approval for Surry 1 & 2 Project stage: RAI ML0917406492009-06-22022 June 2009 Draft RAI on Generic Letter 2004-02 Re. Potential Impact of Debris Blockage of PWR Sumps Project stage: Draft RAI ML0917406412009-06-22022 June 2009 Transmits Draft RAI on Generic Letter 2004-02 Re. Potential Impact of Debris Blockage of PWR Sumps Project stage: Draft RAI ML0920400062009-08-14014 August 2009 RAI, Regarding Response to Generic Letter 2004-02 (Tac No. MC4691) Project stage: RAI ML0924404262009-08-24024 August 2009 Attachment 1 - Volume 10, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling System (ECCS) Revision 0 Project stage: Request ML0923801712009-08-28028 August 2009 Notice of Telephone Conference Meeting with Dominion Energy Kewaunee, to Discuss Licensee'S Proposed Response to Request Regarding Generic Letter 2004-02 Project stage: Meeting ML0926000182009-09-15015 September 2009 Handout 1 - GSI-191 Resolution for Kewaunee Power Station Project stage: Other ML0926003762009-09-15015 September 2009 Handout 2 - Drawings, Analyzed RCS - Not Limiting Break Project stage: Other ML0926006432009-09-15015 September 2009 Handout 3 - Kewaunee Power Station, Agenda Setting Meeting 09/15/09 Project stage: Meeting ML0926008992009-09-28028 September 2009 (KPS) - Summary of 9/15/09 Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML0928702112009-10-14014 October 2009 Revised Questions 4, 6, 7, and 12 of Formal RAI Dated 08/14/2009 GL 2004-02 Project stage: RAI ML1000700682010-02-0404 February 2010 Request for Additional Information Regarding Generic Letter 2004-02 Project stage: RAI ML1003314992010-03-0101 March 2010 Notice of Conference Call with Dominion Nuclear Connecticut, Inc., to Discuss Millstone Power Station, Unit Nos. 2 and 3 Generic Letter 2004-02 Supplemental Responses Project stage: Other ML1008204222010-03-26026 March 2010 Notice of Conference Call with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit Nos 2 and 3 Generic Letter 2004-02 Supplemental Responses Project stage: Other ML1009804152010-04-0808 April 2010 Draft Millstone GL2004-02 Supplemental Responses to Support Public Teleconference on 4/08 Project stage: Request ML1011707792010-04-30030 April 2010 Notice of Meeting with Kewaunee Personnel to Discuss Kewaunee'S Proposed Response to an RAI Regarding Generic Letter 2004-02 Project stage: RAI ML1011705752010-05-0505 May 2010 Summary of Teleconference with DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information Project stage: RAI ML1014005072010-05-19019 May 2010 E-mail Handouts for the 5/20/2010 Kewaunee Public Meeting Project stage: Meeting ML1012506232010-05-24024 May 2010 Summary of Meeting with Dominion Nuclear Connecticut, Inc. (DNC) to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information Project stage: RAI ML1013700502010-05-25025 May 2010 Forthcoming Conference Call with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit Nos. 2 and 3 Generic Letter 2004-02 Supplemental Responses Project stage: Other ML1015305562010-06-0202 June 2010 Mps GL-04-002 Draft RAI Responses/Public Telecon Handouts Project stage: Request ML1014106432010-06-0909 June 2010 May 20, 2010 Summary of Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML1015906482010-06-30030 June 2010 Summary of Meeting with Dominion Nuclear Connecticut, Inc., (DNC) to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information Project stage: RAI ML1018005132010-07-0101 July 2010 Notice of Forthcoming Public Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit No. 3 Generic Letter 2004-02 Supplemental Response Project stage: Meeting ML1019505052010-07-13013 July 2010 MPS3 RAI 6 Project stage: Request 2009-06-22
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 And Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 2024-09-03
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23117A0952023-05-10010 May 2023 – Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23061A0122023-05-0909 May 2023 Issuance of Amendment Nos. 312 and 312, Regarding Technical Specifications Task Force (TSTF) Traveler 547, Revision 1 ML23082A1362023-03-23023 March 2023 License Amendment Request NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure Response to Request for Additional Information ML22339A1372022-12-0101 December 2022 License Amendment Request for NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure Supplemental Information ML22322A1822022-11-18018 November 2022 Proposed Emergency Plan Revision - Relocation of the Technical Support Center ML22312A5502022-11-0707 November 2022 Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML22227A1772022-08-15015 August 2022 License Amendment Request - Proposed Technical Specifications Change for New Fuel and Spent Fuel Storage Areas ML22172A1342022-06-20020 June 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater (AFW) Cross-Connect Capability ML22171A0132022-06-20020 June 2022 Units, Units 1 and 2 - Proposed License Amendment Request Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML22146A0272022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant. ML22131A3102022-05-11011 May 2022 Proposed License Amendment Request Addition of Alternate Control Rod Position Monitoring Requirements ML22131A3512022-05-11011 May 2022 License Amendment Request for Application of Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML22104A1252022-04-14014 April 2022 License Amendment Request for NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure ML21334A1692021-11-29029 November 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Additional Tank and Replacement of Containment Buffer Supplemental Information ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML20338A5422020-12-0303 December 2020 Proposed License Amendment Request, Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis ML20296A6232020-10-22022 October 2020 Request for NRC Approval to Apply Leak-Before-Break Methodology to Reactor Coolant System Branch Piping ML20274A3292020-09-30030 September 2020 Proposed License Amendment Request: Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1 ML20105A2232020-04-14014 April 2020 Proposed License Amendment Request: One-Time Deferral of Surry Unit 2 Steam Generator B Inspection ML19343A0192019-12-0606 December 2019 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML19309D1962019-10-30030 October 2019 Proposed License Amendment Request Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) ML19309D1992019-10-30030 October 2019 Proposed License Amendment Request: Temporary, One Time 14-Day Allowed Outage Time for Replacement of Reserve Station Service Transformer C 5KV Cables to Transfer Bus F ML19042A1372019-01-29029 January 2019 Submittal of Supplement to Subsequent License Renewal Operating Licenses Application for Sufficiency Review Change Notice 1 ML18304A3302018-10-25025 October 2018 Proposed License Amendment Request TSTF-490 & Update of Alternative Source Term Analyses Response to Request for Additional Information & Revised Proposed Technical Specifications ML18025B4852018-01-16016 January 2018 Isfsis, Surry, Units 1 and 2, and ISFSIs - Submittal of Proposed Consolidated Emergency Operations Facility ML18025B4882018-01-16016 January 2018 Attachments 1 to 4: Proposed Consolidated Emergency Operations Facility ML18025B4912018-01-16016 January 2018 Attachments 5 and 6: North Anna - Proposed Changed to Emergency Plan Pages and Marked-Up SPS Emergency Plan Page Changes ML18025B4932018-01-16016 January 2018 Attachments 7 & 8: Surry - Proposed Changed SPS Emergency Plan Pages and Offsite Response Agency Letters of Concurrence ML17317A4642017-11-0707 November 2017 Proposed License Amendment Request, Temporary, One Time 21-Day Allowed Outage Time for Replacement of Reserve Station Service Transformer C and Associated Cabling ML17150A3022017-05-23023 May 2017 Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 ML17026A1742017-01-20020 January 2017 Surrey Power Station, Units 1 and 2 - Proposed License Amendment Request for Revision to Technical Specifications Residual Heat Removal Requirements and Component Cooling System Requirements & Addition of Surveillance Requirement ML16146A5402016-05-18018 May 2016 Proposed License Amendment Request Extension of TS 3.14 Service Water Flow Path Allowed Outage Times and Deletion of Expired Temporary Service Water Jumper Requirements ML14160A6072014-06-0303 June 2014 Proposed License Amendment Request Clarification of Reactor Coolant System Heatup and Cooldown Limitations Technical Specifications ML14112A0732014-04-11011 April 2014 Proposed License Amendment Request Relocation of Augmented Inspection Requirements from TS 4.2 and TS 4.15 to Technical Requirements Manual ML14079A0832014-03-13013 March 2014 Proposed License Amendment Request Regarding Relocation of Snubber Surveillance Requirements from Technical Specification 4.17 to Snubber Program - Correction ML13231A1702013-09-23023 September 2013 Issuance of Amendments Regarding Use of a Temporary Jumper for Providing Service Water ML13248A1072013-09-0303 September 2013 Proposed License Amendment Request Regarding Temporary Service Water Jumper to the Component Cooling Heat Exchangers Correction of Identified Discrepancy ML13232A0422013-08-12012 August 2013 Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval ML13179A0142013-06-26026 June 2013 Proposed License Amendment Request Addition of an Analytical Methodology to Core Operating Limits Reports and an Increase to Minimum Temperature for Criticality ML13179A0152013-05-31031 May 2013 Units I and 2, Qualification of the ABB-NV and Wlop CHF Correlations in the Dominion VIPRE-D Computer Code ML13137A3132013-05-13013 May 2013 Proposed License Amendment Request Regarding Relocation of Snubber Surveillance Requirements from Technical Specification 4.17 to Snubber Program ML12283A0692012-09-27027 September 2012 ISFSIs and Surry, Units 1 and 2 and ISFSIs Proposed Emergency Action Level Revisions ML12279A2822012-09-26026 September 2012 Proposed License Amendment Request Regarding Temporary Service Water Jumper to the Component Cooling Heat Exchangers 2024-09-03
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 24, 2007 U.S.Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.20555 Serial No.07-0693A NL&OS/GDM RO Docket Nos.50-280/281 License Nos.DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 EXIGENT LICENSE AMENDMENT REQUEST ALTERNATIVE CONTAINMENT ANALYSIS METHODOLOGY SUPPORTING INFORMATION
-GOTHIC MODEL INPUT FILES In an October 22, 2007 letter (Serial No.07-0693), Virginia Electric and Power Company (Dominion) requested an amendment to the licensing basis for Facility Operating License Numbers DPR-32 and DPR-37 for Surry Power Station Units 1 and 2, respectively.
The proposed amendment will permit the use of an alternate GOTHIC containment analysis methodology in support of the implementation of modifications to resolve Generic Safety Issue (GSI)191, Assessment of Debris Accumulation on PWR Sump Performance, as committed to in Dominion's response to Generic Letter 2004-02,"Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors." In support of the NRC review of the alternative methodology, Dominion provided a CD-ROM with GOTHIC model files to the NRC Project Manager, Mr.R.A.Jervey, on October 22, 2007.However, the CD-ROM contains information that is considered proprietary commercial information to Dominion.Consistent with 10 CFR 2.390(b)(1), Dominion is providing an affidavit in the attachment to this letter with the basis for withholding the information as proprietary.
Serial No.07-0693A Docket Nos.50-280/281 Page 2 of 3 If you have any questions or require additional information, please contact Mr.Gary D.Miller at (804)273-2771.Very truly yours, Gerald T.Bischof Vice President-Nuclear Engineering Attachment Application for Withholding and Affidavit of Gerald T.Bischof Commitments made in this letter: None.COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Gerald T.Bischof, who is Vice President-Nuclear Engineering, of Virginia Electric and Power Company.He has affirmed before me that he is dUly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.Acknowledged before me this of CctaJuv, 2007.My Commission
&.Pires:ffld'j 3/, dtllo.
Notary Public (SEAL)YIelD L.HULL NoIarY N:IIlC COINMI.......of YIf8InIO'*'I My COIMlIIII,n May 11, 101.
cc: U.S.Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr.J.E.Reasor, Jr.Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.Suite 300 Glen Allen, Virginia 23060 State Health Commissioner Virginia Department of Health James Madison Building-i h floor 109 Governor Street Suite 730 Richmond, Virginia 23218 Mr.J.T.Reece NRC Senior Resident Inspector North Anna Power Station Mr.S.P.Lingam NRC Project Manager U.S.Nuclear Regulatory Commission One White Flint North Mail Stop 0-8 G9A 11555 Rockville Pike Rockville, Maryland 20852 Mr.R.A.Jervey NRC Project Manager U.S.Nuclear Regulatory Commission One White Flint North Mail Stop 0-8 G9A 11555 Rockville Pike Rockville, Maryland 20852 Serial No.07-0693A Docket Nos.50-280/281 Page 3 of 3 Serial No.07-0693A Docket Nos.50-280/281 ATTACHMENT Application for Withholding and Affidavit of Gerald T.Bischof Virginia Electric and Power Company Surry Power Station Units 1 and 2 Serial No.07-0693A Docket Nos.50-280/281 Affidavit Page 1 of 2 APPLICATION FOR WITHHOLDING AND AFFIDAVIT OF GERALD T.BISCHOF I, Gerald 1.Bischof, Vice President-Nuclear Engineering, state that: 1.I am authorized to execute this affidavit on behalf of Virginia Electric and Power Company (Dominion).
2.Dominion has submitted a CD-ROM that contains the electronic GOTHIC model files from the demonstration cases in Section 3.3 of Attachment 1 from Dominion letter dated October 22, 2007 (Serial No.07-0693).
The CD-ROM contains proprietary commercial information that should be held in confidence by the NRC pursuant to the policy reflected in 10 CFR§§2.390(a)(4) because: a.This information is being held in confidence by Dominion.b.This information is of a type that is held in confidence by Dominion, and there is a rational basis for doing so because the information contains sensitive commercial information concerning Dominion's containment analysis methodology.
c.This information is being transmitted to the NRC in confidence.
d.This information is not available in public sources and could not be gathered readily from other publicly available information.
e.Public disclosure of this information would create substantial harm to the competitive position of Dominion by disclosing confidential Dominion internal containment analysis methodology information to other parties whosecommercialinterests may be adverse to those of Dominion.Furthermore, Dominion has expended significant engineering resources in the development of the information.
Therefore, the use of this confidential information by competitors would permit them to use the information developed by Dominion without the expenditure of similar resources, thus giving them a competitive advantage.
Serial No.07-0693A Docket Nos.50-280/281 Affidavit Page 2 of 2 3.Disclosure pursuant to the policy reflected in 10 CFR§§2.390(a)(4).
Vice President-Nuclear Engineering COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Gerald T.Bischof, who is Vice President-Nuclear Engineering of Virginia Electric and Power Company.He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.Acknowledged before me this of{2f!t!Jit<u
,2007.My Commission
.
Notary Public (SEAL)VICKI L.HULL Notary Pubflc l commonwealth af VIrgInIa 1...2IMv CommIIIIon Ixpkea May 31.2810--