ML15280A306
From kanterella
Revision as of 21:54, 8 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Letter Sequence Other | |
---|---|
TAC:ME4640, Steam Generator Tube Integrity (Approved, Closed) | |
Initiation
Administration Questions
Answers
Results
Other: L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples, L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems., L-11-334, Reply to Request Additional Information for the Review of the License Renewal Application Amendment No. 21, L-12-337, Review of the Safety Evaluation Report with Open Items Related to the License Renewal, L-12-444, Submittal of Contractor Equivalent Margins Assessments for Reactor Vessel Welds (Nonproprietary Versions), L-12-456, Notification of Closure of Commitments Related to the Review of the License Renewal Application, L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45), L-13-330, License Renewal Application Amendment No. 46 - Annual Update, L-13-341, Review of the Safety Evaluation Report Related to the License Renewal of Davis-Besse Nuclear Power Station, L-14-085, License Renewal Application (TAC No. ME4640) Amendment No. 48, L-14-206, License Renewal Application Amendment No. 50 - Annual Update, L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55, L-15-139, License Renewal Reactor Vessel Internals Inspection Plan, L-15-214, License Renewal Application Amendment No. 59 - Annual Update, L-15-309, License Renewal Application Amendment No. 60, L-15-310, C-CSS-099.20-069, Rev 0, Shield Building Laminar Cracking Limits., ML102450565, ML111050091, ML11110A089, ML11110A091, ML11110A092, ML11110A093, ML11110A094, ML11110A095, ML11110A105, ML11110A106, ML11110A107, ML11122A014, ML11126A017, ML11126A018, ML11126A019, ML11126A020, ML11126A021, ML11126A022, ML11126A023, ML11126A024, ML11126A025, ML11126A026, ML11126A032, ML11126A033, ML11126A034, ML11126A035, ML11126A036, ML11126A037, ML11126A038, ML11126A039, ML11126A040, ML11126A041, ML11126A042, ML11126A043... further results | |
MONTHYEARML11126A0882008-01-12012 January 2008
[Table View]Drawing No. LR-M041B, Revision 1, Piping & Instrument Diagram Primary Service Water System. Job Code 12501 Project stage: Other ML11126A0902008-01-15015 January 2008 Drawing No. LR-OS41A1, Revision 1, Operational Schematic Emergency Diesel Generator Systems. Project stage: Other L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems.2008-01-15015 January 2008 Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems. Project stage: Other ML11126A0682008-05-0505 May 2008 Drawing No. LR-M-037E, Revision 28, Piping & Instrument Diagram Clean Liquid Radioactive Waste System. Project stage: Other ML11126A0652008-08-0606 August 2008 Drawing No. LR-M036B, Revision 1, Piping & Instrument Diagram Component Cooling Water System. Project stage: Other ML11126A0592008-10-0909 October 2008 Drawing No. LR-M033A, Revision 1, Piping & Instrument Diagram High Pressure Injection. Project stage: Other ML11126A0632008-10-10010 October 2008 Drawing No. LR-M033B, Revision 1, Piping & Instrument Diagram Decay Heat Train 1. Project stage: Other ML11126A0702008-10-10010 October 2008 Drawing No. LR-M033C, Revision 1, Piping & Instrument Diagram Decay Heat Train 2. Project stage: Other ML11126A0742008-11-0606 November 2008 Drawing No. LR-M043, Revision 1, Piping & Instrument Diagram Auxiliary Building Chilled Water System. Project stage: Other ML11126A0832008-12-18018 December 2008 Drawing No. LR-M038C, Revision 2, Piping & Instrument Diagram Gaseous Radioactive Waste System. Job Code 12501 Project stage: Other ML11126A0712009-04-0707 April 2009 Drawing No. LR-M034, Revision 1, Piping & Instrument Diagram Emerg. Core Cooling System Ctmt. Spray & Core Flooding Systems. Project stage: Other ML11126A0892009-04-0707 April 2009 Drawing No. LR-OS002, Revision 1, Operational Schematic Makeup and Purification System. Project stage: Other ML1024505652010-08-27027 August 2010 License Renewal Application and Ohio Coastal Management Program Consistency Certification Project stage: Other ML1104500462011-02-17017 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Fire Protection Project stage: RAI ML11126A0792011-02-25025 February 2011 Drawing No. LR-M900A, Revision 0, Instrument Air System Piping Schematic. Project stage: Other ML1104205972011-02-28028 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 2.4 Project stage: RAI ML1106801722011-03-17017 March 2011 Request for Additional Information on the Reactor Vessel Surveillance Aging Management Program, Time-Limited Aging Analyses for Neutron Embrittlement of the Rv and Internals, and Other TLAAs for the Review of the Davis-Besse Nuclear Power S Project stage: RAI ML1107007322011-03-18018 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.2 & 2.3 Project stage: RAI L-11-078, Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 12011-03-18018 March 2011 Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 1 Project stage: Response to RAI ML11068A0002011-03-21021 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 4.7 (TAC Number ME4640) Project stage: RAI L-11-079, Reply to Request for Additional Information for the Review of the License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-11-089, Reply to Request for Additional Information for the Review License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review License Renewal Application Project stage: Response to RAI ML1108206242011-03-30030 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.1 (Tac No. ME4640) Project stage: RAI ML1109002952011-03-31031 March 2011 Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station Project stage: Approval ML1108204902011-04-0505 April 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 1 Project stage: RAI ML11110A0932011-04-15015 April 2011 Drawing No. M-037D, Rev. 21, Clean Liquid Radioactive Waste System Project stage: Other ML11110A1072011-04-15015 April 2011 Drawing No. M-045, Rev. 56, Chemical Addition Systems Project stage: Other ML11110A1062011-04-15015 April 2011 Drawing No. M-042C, Rev. 33, Sampling System Sh. 3 Project stage: Other ML11110A1052011-04-15015 April 2011 Drawing No. M-040A, Rev. 76, Reactor Coolant System Details Project stage: Other ML11110A0952011-04-15015 April 2011 Drawing No. M-039B, Rev. 18, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0942011-04-15015 April 2011 Drawing No. M-039A, Rev. 33, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0922011-04-15015 April 2011 Drawing No. M-037C, Rev. 30, Clean Liquid Radioactive Waste System Project stage: Other L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples2011-04-15015 April 2011 Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples Project stage: Other L-11-107, Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application...2011-04-15015 April 2011 Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application... Project stage: Response to RAI ML11110A0882011-04-15015 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application, Sections 2.2 & 2.3, License Renewal Application Amendment No. 3, and Revised License Renewal Project stage: Response to RAI ML11110A0912011-04-15015 April 2011 Drawing No. M-011, Rev. 61, Domestic Water System Project stage: Other ML11110A0892011-04-15015 April 2011 Drawing No. M-0060, Rev. 52, Auxiliary Feedwater System Project stage: Other ML1110500912011-04-19019 April 2011 Scoping and Screening Audit Report Regarding the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Other L-11-115, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 42011-04-20020 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 4 Project stage: Response to RAI ML1109807182011-04-20020 April 2011 Request for Additional Information for the Review of the Davis-Bessie Nuclear Power Station - Batch 2 Project stage: RAI ML11126A0362011-04-29029 April 2011 Drawing No. LR-M017D, Revision 1 Piping & Instrument Diagram, Steam Blackout Diesel Generator. Project stage: Other ML11126A0352011-04-29029 April 2011 Drawing No. LR-M017C, Revision 2, Piping & Instrument Diagram, Fuel Oil. Project stage: Other ML11126A0342011-04-29029 April 2011 Drawing No. LR-M017B, Revision 1, Piping & Instrument Diagram, Diesel Generators Air Start. Project stage: Other ML11126A0332011-04-29029 April 2011 Drawing No. LR-M016B, Revision 1, Piping & Instrument Diagram Station Fire Protection System Project stage: Other ML11126A0322011-04-29029 April 2011 Drawing No. LR-M016A, Revision 1, Piping & Instrument Diagram Station Fire Protection System Project stage: Other ML11126A0262011-04-29029 April 2011 Drawing No. LR-M010C, Revision 1, Piping & Instrument Diagram Make-up Water Treatment System Project stage: Other ML11126A0252011-04-29029 April 2011 Drawing No. LR-M010A, Revision 1, Piping & Instrument Diagram Make-Up Water Treatment System Project stage: Other ML11126A0242011-04-29029 April 2011 Drawing No. LR-M009B, Revision 1, Piping & Instrument Diagram Cooling Water System Project stage: Other ML11126A0192011-04-29029 April 2011 Drawing No. LR-M003A, Revision 1, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 1 Project stage: Other ML11126A0452011-04-29029 April 2011 Drawing No. LR-M024H, Revision 1, Piping & Instrument Diagram, No. 2 Main and Auxiliary Turbine Driven Feed Pumps. Project stage: Other 2011-02-25 |
ML15280A306 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 09/03/2014 |
From: | FirstEnergy Nuclear Operating Co |
To: | Advisory Committee on Reactor Safeguards |
Shared Package | |
ML15280A293 | List: |
References | |
L-15-310, TAC ME4640 C-CSS-099.20-063, Rev 1 | |
Download: ML15280A306 (58) | |
Similar Documents at Davis Besse | |
---|---|
Category:Calculation
MONTHYEARL-20-093, Offsite Dose Calculation Manual, Revision 372019-11-0404 November 2019
[Table view]Offsite Dose Calculation Manual, Revision 37 ML20142A4012019-02-13013 February 2019 Offsite Dose Calculation Manual, Revision 36 L-16-134, Offsite Dose Calculation Manual, Revision 312015-06-30030 June 2015 Offsite Dose Calculation Manual, Revision 31 L-15-310, C-CSS-099.20-069, Rev 0, Shield Building Laminar Cracking Limits.2015-05-0606 May 2015 C-CSS-099.20-069, Rev 0, Shield Building Laminar Cracking Limits. ML16147A0092015-01-14014 January 2015 Offsite Dose Calculation Manual, Revision 30 ML15280A3092014-09-0303 September 2014 C-CSS-099.20-063, Rev 1, Shield Building Design Calculation. Part 1 of 7 ML15280A3032014-09-0303 September 2014 C-CSS-099.20-063, Rev 1, Shield Building Design Calculation. Part 4 of 7 ML15280A3042014-09-0303 September 2014 C-CSS-099.20-063, Rev 1, Shield Building Design Calculation. Part 5 of 7 ML15280A3052014-09-0303 September 2014 C-CSS-099.20-063, Rev 1, Shield Building Design Calculation. Part 6 of 7 ML15280A3062014-09-0303 September 2014 C-CSS-099.20-063, Rev 1, Shield Building Design Calculation. Part 7 of 7 ML15280A3102014-09-0303 September 2014 C-CSS-099.20-063, Rev 1, Shield Building Design Calculation. Part 2 of 7 ML15280A3112014-09-0303 September 2014 C-CSS-099.20-063, Rev 1, Shield Building Design Calculation. Part 3 of 7 L-15-010, Offsite Dose Calculation Manual, Revision 292014-05-14014 May 2014 Offsite Dose Calculation Manual, Revision 29 ML15155B3672014-02-0101 February 2014 Offsite Dose Calculation Manual, Revision 28 L-14-135, Offsite Dose Calculation Model, Revision 272013-02-27027 February 2013 Offsite Dose Calculation Model, Revision 27 ML13009A3752012-12-12012 December 2012 Enclosure B to L-12-444, Calculation No. 32-9195651-000, Equivalent Margins Assessment of Davis-Besse Transition Welds for 52 EFPY - Non-Proprietary. ML13009A3742012-12-11011 December 2012 Enclosure a to L-12-444, Calculation 32-9195423-000, DB-1 EMA of RPV Inlet & Outlet Nozzle-to-Shell Welds for 60 Years - Non-Proprietary. ML12213A3332012-07-27027 July 2012 SB-0033 - Calculation C-CSS-099.20-054, Revision 0 ML12213A3342012-07-27027 July 2012 SB-0034 - Bechtel Response to Calculation C-CSS-099.20-054, Revision 0 L-12-152, Offsite Dose Calculation Manual, Revision 262011-11-0202 November 2011 Offsite Dose Calculation Manual, Revision 26 ML15280A3082011-10-31031 October 2011 C-CSS-099.20-055, Rev. 01, Ii/I Evaluation for Architectural Flute Shoulder. ML11109A0842011-04-15015 April 2011 Attachments B-D, to L-11-107, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application L-11-150, Offsite Dose Calculation Manual, Rev. 242011-03-11011 March 2011 Offsite Dose Calculation Manual, Rev. 24 ML12174A0962011-02-22022 February 2011 Offsite Dose Calculation Manual, Revision 25 ML1014004062010-05-11011 May 2010 Areva Calculation 32-9136508-002, DB-1 CRDM Nozzle J-Groove Weld Flaw Evaluation for Idtb Repair, Enclosure B ML1014004072010-05-0707 May 2010 Areva Calculation 32-9135800-001, DB-1 CRDM Nozzle Weld Anomaly Flaw Evaluation of Idtb Repair, Enclosure C ML1014004052010-05-0606 May 2010 Areva Calculation 32-9136884-001, DB-1 CRDM Nozzle Weld Anomaly Flaw Evaluation of Idtb Alternate Repair with Alloy 52M/82, Enclosure a L-10-131, Additional Information Regarding 10 CFR 50.55a Request RR-A34 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetration Nozzles2010-04-21021 April 2010 Additional Information Regarding 10 CFR 50.55a Request RR-A34 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetration Nozzles ML1011101482010-04-0808 April 2010 Calculation 32-91358000-000, DB-1 CRDM Nozzle Weld Anomaly Flaw Evaluation of Idtb Repair. ML0933603302009-11-23023 November 2009 Calculation, 0800368.325, Rev. 0, ASME Code, Section Iii Evaluation of Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. L-09-268, Calculation, 0800777.309, Rev. 0, Sensitivity Study of Temperbead Surface Area Limitations for Large Bore Weld Overlay Repairs Over Ferritic Materials (from 500 to 1,000 Square Inches).2009-11-0202 November 2009 Calculation, 0800777.309, Rev. 0, Sensitivity Study of Temperbead Surface Area Limitations for Large Bore Weld Overlay Repairs Over Ferritic Materials (from 500 to 1,000 Square Inches). ML0933603312009-07-20020 July 2009 Calculation, 0800368.326, Rev. 0, Crack Growth Evaluation of Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. ML0933603292009-07-10010 July 2009 Calculation, 0800368.324, Rev. 0, Residual Stress Analysis of Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. ML1014105112009-06-11011 June 2009 Offsite Dose Calculation Manual, Revision 23 ML0933603262009-05-27027 May 2009 Calculation, 0800368.320, Rev. 1, Optimized Weld Overlay Sizing for the 28 I.D. Outlet/Discharge Reactor Coolant Pump Nozzle. ML0933603282009-05-23023 May 2009 Calculation, 0800368.323, Rev. 1, Thermal and Unit Mechanical Stress Analyses for Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. ML0933603272009-05-22022 May 2009 Calculation, 0800368.322, Rev. 1, Finite Element Models of the Reactor Coolant Pump Discharge Nozzle with Weld Overlay Repair. ML0933603242009-04-21021 April 2009 Calculation, 0800368.301, Rev 0, Material Properties for Davis-Besse Unit 1, RCP Suction, RCP Discharge, Cold Leg Drain and Core Flood Nozzles Preemptive Weld Overlay Repairs. ML0933603252009-04-0808 April 2009 Calculation, 0800368.311, Rev. 0, Design Loads for the 28 I.D. Reactor Coolant Pump (RCP) Suction and Discharge Nozzles. L-09-111, Offsite Dose Calculation Manual, Revision 222008-09-0303 September 2008 Offsite Dose Calculation Manual, Revision 22 L-08-056, Reactor Protection System High Flux Trip Setpoint Calculation2008-02-14014 February 2008 Reactor Protection System High Flux Trip Setpoint Calculation IR 05000124/20280082007-04-12012 April 2007 Enclosure 3, Areva Np Calculation 32-5012428-08, Davis-Besse Heat Balance Uncertainty. ML0710705782007-04-12012 April 2007 Enclosure 3, Areva Np Calculation 32-5012428-08, Davis-Besse Heat Balance Uncertainty. ML0612304032005-12-22022 December 2005 Offsite Dose Calculation Manual Revision 20.0 ML0512502282004-12-22022 December 2004 Offsite Dose Calculation Manual, Revision 19.0 ML0512502232004-01-23023 January 2004 Offsite Dose Calculation Manual, Revision 18.0 ML0310401082003-03-31031 March 2003 Computations on Failure Pressure of as-found Cavity FENOC Cavity Analysis with Handwritten Notes ML0308501852003-02-0505 February 2003 Preliminary Responses to NRC Staff Comments & Questions on Davis Besse Safety Significance Assessment 2019-02-13 |
Text
%
%
%
%
%%
%%%%%%%%
%%%%%%%%
%%%%%%%%%%
%%%
%%
%%%%%
%%%
%
%%
%
%%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%%
%%
%%
%%
%%
%%
%%%
%
%%
%%%
%%%%%
%
%%%
%%%
%
%%
%%
%
%%%
%%%
%%%
%
%
%%
%
%
%%
%%
%%
%
%%
%%%
%
%%%
Retrieved from "https://kanterella.com/w/index.php?title=ML15280A306&oldid=855918"