Final Supplemental Deficiency Rept CP-85-40 Re Adequacy of Flux Mapping Seal (Fms) Table Restraints Under Seismic Loads.Initially Reported on 851126.Unit 1 Fms Mods Complete. Unit 2 Mods Scheduled for Completion by 880515
ML20238C500
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/03/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-85-40, TXX-6713, NUDOCS 8709100159
Download: ML20238C500 (1)


Text

- -

1 M

s lllllll:' ':llllllll Log # TXX-6713

- ~"-

Tile # 10110

~~ -

905.3 Ref # 10CfR50.55(e)

, TUELECTRIC wimam c. coune e,eptember 3, 1987 rm,a~c u m&m U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washingtor., D.C, 20555

SUBJECT:

C0tMNCHE PEAK STEAM ELECTRIC STATION (CPSES) l 00CPET NOS. 50-445 AND 50-446 FLUX MAPPING SEAL TABLE RE31RAINTS SDAR: CP-85-40 (SUPPLEMENTAL REPORT)

Gentlemen:

On November 26, 1985, in ouvreport logged TXX-4633, we not if ied you of a ,

deficiency regarding the, adequacy of restraints (provided for the flux mapping l system) under seismic loads which we deemed reportable under the provisions of 10CTR50.55(e). This item w s subsequently identified by our letter, logged TXX-6435, dated May 13, 1987, as an item for which a final report had been issued but "the originally scheduled completion date for the implementation of j corrective actins has elapsed but t'ie implementation of those actions is  ;

still in progress ." 1his report is submitted to status the implementation of corrective actichs.

I in our report TXX-4633, we advit ed the actual modifications for the flux i l Mapping System (fMS) would be completed no later than March 31, 1986. Unit 1 .

l FMS modifications (for Equipment Tag No. TBX-ICELFM-01) are complete. I Currently, Unit 2 modifications are scheduled for completion no later than May l 15, 1986 i

Supporting documentation will be available at the CPSES site for your  ;

inspectors review Mter May 15, 1998. No further reports are anticipated.

Very truly yours, I Wh<f ,

W. G. ounsil .

I py.- [_

.J -

y c -- s ..

Manager. Nuclear Lictysing j CBC/ rih c .tr. R. D. Martin, Region IV  !

Hesident inspectors, CPSES (3) 8109100159 B70903 @ North Dint Street LB 81 Dallas. Texas 75201

'PDR ADOCK 05000445 i

[ ___ _ _ _ _ _ _ _ _ _ _ l

l O

W -@@ h p'

Of. CD *s h,

\1 ku

- tlJ  %$ -

o S .4,c -I to w gli (C as a

q. P ','

A .@

i I

i

.il 1

1 l

I I

l l

1 I

)

l 1

I

_ - _ _ _ - _ - - _ _ _ _ - -