ML20106C020

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept CP-92-018 Re 920728 Discovery of Steam Leak in 3-inch Schedule 80 Lateral Installed in Steam Blowdown Sys.Evaluation of Deviation Will Be Completed by 921112
ML20106C020
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 09/28/1992
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-92-018, CP-92-18, TXX-92464, NUDOCS 9210060007
Download: ML20106C020 (1)


Text

.

~

Log

  1. 1XX-92464 File #

10110 1

C

  1. 903.9 r

Z Ref.

10CFR50.55(e)

TUELECTRIC September 28, 1992

% Hliam J. CnN!!, Jr.

Grmr. Yk e he m, nr U. S. Nuclear Regulatory Commission Attn:

Document Control Dest Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) - UNIT 2 DOCKET NO. 50-446 STEAM LEAK IN A 3" SCHEDULE 80 LATERAL SDAR-CP-92-018 (INTERIG REPORT)

Gentlemen:

On July 28, 1992 TU Electric discovered a steam leal; in a 3' Schedule 80 lateral installed in the steam blowdown system.

The evaluation of this identified deviation will be complete by November 12, 1992.

Sincerely.

/

William J. Cahill, Jr.

CEJ/tg c

Mr. J.

L. Milhoan. Region IV Mr. B. E. Holian, NRR Resident Inspectors. CPSES (2)

L Y llf sn.

9210060007 920928

/f DR ADOCK 0S00 6

JiU N. Ol;ve Street L.B. 81 Dallas. Te us 75201