PLA-2424, Monthly Operating Repts for Feb 1985

From kanterella
Revision as of 07:19, 23 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1985
ML20115B568
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/28/1985
From: Kenyon B, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2424, NUDOCS 8504180071
Download: ML20115B568 (9)


Text

  • ,; .
_N4 g AVERAGE DAILY UNIT POWER LEVEL

}

I E ---. 5 DOCKET NO. 50-387 L NN UNIT One

  • e$

EB 4S 8 DATE March 11, 1985 Ric SY CourLE7ED sy L.A. Kuczynski TELEPHONE (717)542-3759 MONTH February, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe. Net)

I 859 0-17 2 851 gg o 3 850 19 0 4 846 0 20 5 839 0 21 6 838 0 22 7 832 0 23 _

8 681 0 24 9 0 o 3

10 0 0 26 11 0 0-27 12 0 0 i 28 13 0 -

29 0 -

14 30 0 -

15 3, 16 0 -

INSTRUCTIONS On this format, list the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/771 l

8504180071 850228 l

DR ADOCK0500g7 ff--7

.- ., ANN 4 s

Z

$ ) 3 L i+ -- IQ", J OPERATING DATA REPORT s0 DOCKET NO. 50-387 DATE March 11, 1985 QNIC si COMPLETED BY L.A. Kuczynski TELEPHONE L717) 542-3759 OPERATING STATUS Unit 1 Susquehanna Steam Electric Station Notes: Ctxmienced first refuel

1. Unit Name: outage at 0146 on 2/9/85.
2. Reporting Period: February, 1985 ,
3. Licensed Thermal Power (MWt):

3293

4. Name,) late Rating (Gross MWe): 1152 accurate EFPD data.
5. Design Electrical Rating (Net MWe): 1065 ** Values altered to reflect
6. Maximum Dependable Capacity (Gross MWe): 1068 station electrical use while
7. Maximum Dependable Capacity (Net MWe): 1032 unit is shutdown.
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted,If Any (Net MWe): None
10. Reasons For Restrictions,if Any: None This Month Yr.-to.Date Cumulative
11. Hours In Repo ting Period 672 1,416 15,169
12. Number Of Hours Reactor Was Critical 193.8 896 11,283.7
13. Reactor Reserve Shutdown Hours 0 41.8 513.2
14. Hours Generator On.Line 193.8 883.9 11,030.8
15. Unit Reserve Shutdown Hours 0 0 0
  • 16. Gross Thermal Energy Generated (MWH) 515,552 2,529,543 33,158,531
17. Gross Electrical Energy Generated (MWH) 165,950 _ 823,150 10,813,660
    • 18. Net Electrical Energy Generated (MWil) 151,085 779,822 10,360,392
19. Unit Service Factor 28.8 62.4 72.7
20. Unit Availability Factor 28.8 62.4 72.7
21. Unit Capacity Factor (Using MDC Net) 21.8 53.4 66.2
22. Unit Capacity Factor (Using DER Net) 21.1 51.7 64.1
23. Unit Forced Outage Rate 0 5.8 13.4

- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

25. If Shut Down At End Of Report Period. Estimated Date of Startup: June 1, 1985
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (4/77)

[ 4 ,>

~

g, O I \T -

@l -.

f DOCKET NO. 50-387 .

' UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME One (O

E o DATE March 11. 1985.

M COMPLETED BY L.A. Kuczynski I4fC SY REPORT MONTH February, 1985 TELEPHONE (717)S42-3759 n.

- E E

-, .!? }g }I3 Licensee Eg ye. Cause & Corrective gy No. Date g- 58 .g s & Event o3 Action to F

$= 5 j di g Report a mV fV Prevent Recurrence d

2 850209 S 478.2 C 2 NA NA NA Manual scram to cmmence first refuel outage.

I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A-Ecuipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5 G-Operational Error (Explain) 5-Reduction Exhibit I- Same Source (9/77) 11-O:her (Explain) 9-Other

I " ..
et q

p , :. -

UNIT 1 SUSQUEHANNA STEAM ELBCIRIC STATION .

Docket.No.- 50-387 i-Date' March 11, 1985 Cmpleted by. 5.A. Kuczynski

Telephone- (717)S42-3759 Challenges to Main Steam Safety Relief Valves None

~

Changes to the Offsite Dose Calculation Manual None

. Major Changes to Radioactive Waste Treatment Systens None 4

J 3

m y L -.

AVERAGE DAILY UNIT POWER LEVEL Q j tt) ____

E DOCKETNO. 50-388 t "% -

UNIT TWo PPal DAH March 11, 1985

+

?ggg gi COMPLETED BY L.A. Kuczynski TELEPHONE (717)542-3759 MONTH February, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWeNet) (MW,. Net) 1 43 827 37 353 2 18 1053 3 849 3, 1058 _

4 1002 1058 20 5 1050 1057 21 6 1053 1057 22

~

7 1058 23 1053 _

8 1057 24 1051 9 1057 1058 25 10 1058 26 1059 Ig 1059 y 1059

  • 12 972 1059 28 13 1058 29 14 1059 ~

30 15 1060 3g 16 611 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

  • Unit was decl& red ccxmorcial at 0001 on February 12, 1985.

(9/77)

',.- ANN 4

~ >

.D i

{..i.$ / 7

@ __---.' 5 LA"-- AJ OPERATING DATA REPORT 30 p DOCxET NO. 50-388 DATE March 11, 1985 OpNIC Sif COMPLETED BY L. A. Kuczynski TELEPHONE (717)542-3759 OPERATING STATUS Unit 2

1. Unit Name:

Susquehanna Steam Electric Station Notes:

Unit declared comnercial

2. Reporting Period: February, 1985 at 0001 on February 12, 1985.
3. Licensed Thermal Power (MWt):

3293

4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1068
7. Maximum Dependable Capacity (Net MWe): 1032
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Lan Report.Give Reasons:

None

9. Power Level To Which Restricted. If Any (Net MWe): None
10. Reasons For Restrictions,If Any: None

, This Month Yr. to-Date Cumulative

11. Hours In Reporting Period 408 408 408
12. Number Of Hours Reactor Was Critical 408 408 408
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 408 408 408
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,293,749 1,293,749 1,293,749
17. Gross Electrical Energy Generated (MWH) 427,446 427,446 427,446
18. Net Electrical Energy Generated (MWH) 413,058 413,058 413,058
19. Unit Service Factor 100 100 100
20. Unit Availability Factor 100 100 100
21. Unit Capacity Factor (Using MDC Net) 98.1 98.1 98.1
22. Unit Capacity Factor (Using DER Net) 95.1 95.1 95.1
23. Unit Forced Outage Rate 0 0 0
24. Shutdowns Scheduled Over Next 6 Months (Type.Date and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: E
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION _

(9/77 )

ANN 4 x >

f b ky . .

5 d UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-388 .

g R UNIT NAME N M DATE March 11, 1985 COMPLETED BY L.A. Kuczynski I4K' N REPCRTMONTH Februarv 1985 TELEPHONE (717)S42-3759_

B e.

- E E

,{ g 3 Licensee ,Ev, gn, Cause & Corrective

)Y3 N. . Date g 3m ( y$ Event g'g pU Action to H

$= 5 j iji g Report a mo g Prevent Recurrence a

5 850216 F O A 5 NA HC/CB IfIEXCH/ Power reduction'to repair main conden-GENERA ser water box 'B' tube leaks and change-out the reactor recirculation motor-generator setA' brushes.

I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1. Manual for Preparation of Data B-Maintenance of Test 2-Mancal Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG .

D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination fro" previous month F-Adrr inistrative 5-Reduction 5 G-Operational Esrur (Explain) Exhibit I- Same Source (9/77) Il4)ther (Explain) 9-Other

C

. . 19~ c : ~

UNIT 2 SUSQUEHAME STEAM ELECTRIC STATION Docket No. 50-388' Date March 11, 1985 Cm pleted by L.A. Kuczynski

, . Telephone (717)542-3759 Challenges to Main Steam Safety Relief \'lves None Changes to the Offsite' Dose Calculation Manual None Major Changes .to Radioactive Waste Treatment Systens None k _

PP&L Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 I 770 5151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 MAR 141985 Director, Data Automation &

Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2424 50-388/NPF-22

Dear Mr. Beebe:

The February 1985 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly.yours,

~

h-

. D. Kenyon Vice President-Nuclear Operations Attachment cc: Dr. Thomas E. Murley Regional Administrator-Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk (12 copies)

Mr. R. H. Jacobs - NRC Ms. M. J. Campagnone - NRC f62-Y l

W