Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed ML20210U2211999-08-10010 August 1999 Forwards Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Late Performance of off-gas Grab Sample Surveillance 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210P4191999-08-0404 August 1999 Forwards Initial Exam Repts 50-352/99-302 & 50-353/99-302 on 990702-04 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20212J5401999-06-28028 June 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Bulletin Closed for Unit 2 by NRC ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196G7041999-06-24024 June 1999 Forwards Insp Repts 50-352/99-03 & 50-353/99-03 on 990413- 0524.No Violations Noted.Nrc Concluded That Licensee Staff Continued to Operate Both Units Safely ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld ML20195G4591999-06-10010 June 1999 Forwards MORs for May 1999 & Revised Repts for Apr 1999 for LGS Units 1 & 2 ML20195H0531999-06-0909 June 1999 Forwards Revised Bases Pages B3/4 10-2 & B3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7701999-06-0707 June 1999 Provides Notification of Change to NPDES Permit PA0052221, for Bradshaw Reservoir Facility Which Supports Operation of Lgs,Units 1 & 2,per EPP Section 3.2 ML20195C7631999-06-0101 June 1999 Notifies NRC That PECO Energy Has Completed Installation of New Large Capacity,Passive Strainers on RHR & Core Spray Sys Pump Suction Lines at Lgs,Unit 2,in Response to Ieb 96-003 ML20195D5381999-05-26026 May 1999 Forwards 1998 Occupational Exposure Tabulation Rept for LGS Units 1 & 2. Encl Is Diskette & Instructions.Rept Is Being re-submitted to Reset 12 Month Time Period.Without Disk ML20195B2821999-05-24024 May 1999 Requests That NRC Distribution Lists for LGS Be Updated. Marked-up Distribution List Showing Changes Is Attached ML20196L2891999-05-20020 May 1999 Provides Status Update of Thermo-Lag 330-1 Fire Barrier Corrective Actions,Iaw Commitments Made in ML20195B2951999-05-20020 May 1999 Forwards Rev 0 to LGS Unit 2 Reload 5,Cycle 6 COLR, IAW TS Section 6.9.1.12.Values Listed Have Been Determined Using NRC-approved Methodology & Are Established Such That All Applicable Limits of Plants Safety Analysis Are Met 05000352/LER-1999-003, Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv1999-05-19019 May 1999 Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv 05000353/LER-1999-002, Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 9904191999-05-18018 May 1999 Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 990419 ML20206E2001999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept (Non- Radiological) for Limerick Generating Station,Units 1 & 2. Rept Submitted IAW Section 5.4.1 of App B of Fols,Epp (Non- Radiological) & Describes Implementation of EPP for 1998 ML20206D8801999-04-27027 April 1999 Forwards Rev 2 to LGS Unit 1 Reload 7,Cycle 8 COLR, IAW TS Section 6.9.1.12.COLR Provides cycle-specific Parameter Limits for Noted Info ML20206A5461999-04-21021 April 1999 Responds to Conference Call Between Util & NRC on 990420,re TS Change Request 98-07-2,revising TS Section 2.0 to Incorporate Revised MCPR Safety Limits.Attached Ltr Contains Info Requested ML20205T0441999-04-17017 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept 15, IAW TS Section 6.9.1.7.REMP for 1998,confirmed That LGS Environ Effects from Radioactive Release Were Well Below LGS TSs & Other Applicable Regulatory Limits ML20205Q7581999-04-15015 April 1999 Forwards Response to RAI Re ISI Program First & Second 10-Yr Interval Relief Requests.Revs to Identified by Vertical Bar in Right Margin 1999-09-09
[Table view] |
Text
--
Enclosure 1 NangtEs of fip }lniiEb ffairs Konse af fcpresentatives panhington, B.C. 20515 March 18 19 85 The attached communication is sent for your consideration. ,
Please contact the AIDE mentioned below upon receipt of this inquiry. ,
I would appreciate it if you would look into this matter and provide me with the .
necessary information for reply.
Please return the enclosed correspondence with your response.
Sincerely,
/
f f ROBERT A. BORSK1 Member of Congress l
314 Cannon HOB Washington, DC 20515 Please reply to:
TTN: Bryan 8504290088 850416 PDR ADOCK 05000352 H PDR
e-g .. Enclosure 1 M. l. LEWIS 5504 BRADFORD TERR.
PHILA.. Pa Igy,a
. 3 . /c eg 7WS //ok.ca//845 HDBE /? T BORs><;./
PC//# C0NGf(OAfAv 8 0d.3)</,
C/N.=~ H A.s s zooc, ensro A ,< c./- /woi yszs.12,u r-w'irss J<# N N/ N & c voRTHY c2fu'.3 s s. J.s f/VE/T&f
[fd/RbfdN' OF C/7~/3!CEN '.5 _
A&77'os/ /5' fv6~ ??Y/z4,
/ HAnr / M rfR Vfw a' n fo .sr b .srsscfd< kraws s a rsitt rer wac w m - a e s c. /m VVf/7~/NG /f.6'd&7 Ct/R LJffS7~ Ac'/? oat Ecfos re
- 7Ar
~
l'c' /res> Swrr.s ///weaw? $ c-zs<A KcA,'Y csx<<gs.sxA/ .Pff< 76# # s'oc4641 .kd%&76A**
J SS&&L/ 7~ W, d'lSdds-?%,74~/V, cAs ! n~ p f~ x/s e r- 24 n a' i? Rsarx'7 p'//%Ay' of' K&rkO.s c.' 7/f'[ # 8 4' h~Cf) /E' .f?//f~ /by/.yp i
-rm xyu n, c:nu 77/.- xw ness m-av 4 f L t,f'g*,'/ C x . 7~/T &~'OPNp3 7 0A 77#.s .fe7nrA/
/A'E 7/f5 ht&ACf4).S 0 f* 4ia w7/EtiG , 4F'S' V /7 E~,M s ,
t"S/:tc /4s c/E.s x:vc' retx n nry Annso p ,c o s i g /;; s
%'/r 1:Rerp A s c rwei1 77W *</ user es r~ 7w/.s 7</or. -
A'f 4iatC//c/<. &fW f/fC6461/.S f/A VE cduSEa
- Ac ccs.'s!d->itMA 44:fo / rey rs c'est4&rix/ze
// . ps lbrl b) $$' /$ **
P4sy,1 >r uomer tw/ A4f2~ 4'A?Y SetM c c,s ct i w s, pcx .or sorriy er frM"*,vvdoMt/5, llf A,J/ ~M 4'./J' ,Yo o A S,
./'2'if//s /. L'eain 6 / J .r a .e . v .9 u
,y
,k g NUCLEAR REGULATORY COMMISSION UNITED STATES
- r. g..Qg :l WASHINGTON. D. C. 20555
- s. N* / '
FEB 13 1985 Docket Nos.: 50-352 50-353 (10CFR2.206)
Mr. Robert L. Anthony - '
Box 186 .
Moylan, Pennsylvania 19065
Dear Mr. Anthony:
This letter acknowledges receipt of the Petition filed by you on behalf of yourself and Friends of the Earth (Petitioners) on December 23, 1984. The Petition requests that the Director of the Office of Inspection and Enforce-ment institute proceedings pursuant to 10 CFR 2.202 by serving an order on the Philadelphia Electric Company (Licensee) to show cause why License No. NPF-27 issued for the Limerick Facility should not be revoked. The .
Petition argues that.certain exemptions granted to the Licensee when License No. NPF-27 was issued were improvidently granted and that the public health and safety is thereby endangered. Specific exemptions identified are concerned with control room habitability, the standby gas treatment system, compliance with 10 CFR Part 50 Appendix J and the adequacy of isolation valves for certain systems. Secondly, the Petition argues that Licensee Event Reports issued by the licensee since the comencement of operation under the low-power ~ license are further indication that activities under the license are being conducted in an unsafe fashion. Thirdly, the Petition makes reference to various Inspection Reports issued by the NRC and to correspondence between the Licensee and the NRC as identifying additional deficiencies warranting revocation of the license. Finally, the Petition suggests that the Independent Design Verification Program undertaken for the Limerick Facility was insufficient to support issuance of the low-power license.
Although your Petition was directed to the Office of Inspection and Enforce-ment my office will respond to your Petition in that it deals with activities authorized by the low-power license for the Limerick Facility which this office issued.
The Petition is being treated under 10 CFR 2.206 of the Comission's regulations. The Staff will review the Petition and I will issue a femal decision in regard to it within a reasonable time. The Petition does request the immediate issuance of a show cause order to the Licensee based on the concerns identified in the Petition. Preliminary review of the Petition indicates that the Petition provides no new information which would serve as a basis for such action.*
The exemptions referred to in the Petition, as indicated by Paragraph 2.0 of License No. NPF-27, were evaluated by the NRC staff and discussed in the Qyfn - wouea^ o/ M ~J %
'-2 Safety Evaluation Report related to the operation of the Limerick Generating Station, Units 1 and 2 (NUREG-0991) or in supplements thereto. These SER findings support issuance of the exemptions granted in License No. NPF-27.
Licensing Event Reports (LERs) are required to be filed with the NRC only after issuance of a facility operating license, and are promptly evaluated.
This has in fact occurred with the LERs that have been issued for the Limerick facility. The NRC review of those LERs does not justify any imediate actions with respect to the facility.
The NRC staff was aware of the issues addressed in the Inspection Reports and correspondence between the licensee and the staff, referenced by the Petition, at the time of issuance of License No. NPF-27 and considered those issues as appropriate to allow issuance of the License. The specific Inspection Reports referenced in your letter documented the results of inspections conducted prior to the issuance of License No. NPF-27 on October 26, 1984.
Although some of the reports were fonnally issued to the Licensee after October 26, the findings in these reports were well known to the NRC prior to issuance of the license. Each of the inspection findings was assessed by -
the NRC to detennine the potential safety impact. Those findings necessary to be resolved prior to license issuance were so resolved and documented in subsequent Inspection Reports. Similarly, those findings necessary to be resolved prior to initial reactor criticality were satisfactorily resolved prior to the start of this plant evolution on December 22, 1984. No new infonnation has been set forth in the Petition which would call into question those earlier decisions.
Finally, the status of the NRC staff's review of the Independent Design Verification Program at the time of issuance of License No. NPF-27 was reported in Supplement 3 of the Safety Evaluation Report. For the reasons stated there, the staff concluded that completion of the program was not necessary prior to issuance of License No. NPF-27.
As discussed above these are all matters of which the NRC staff is well aware.
None of these matters requires imediate action sought by the petition regarding continued operation of the facility. Consequently, I decline to take any imediate action on the basis of your Petition. A copy of the Notice that is being filed for publication with the Office of Federal Register is enclosed for your information.
l Sincerely,
/ n --
l Harold R. Denton, Director
' Office of Nuclear Reactor Regulation i
Enclosure:
As stated cc(w/ encl.): See next page
LIMERICK Mr. Edward G. Bauer, Jr Vice President & General Co.unsel Philadelphia Electric Company Philadelphia, Pennsylvania 19101 Troy B. Conner, Jr. , Esquire Mr. Marvin I. Lewis Conner and Wetterhahn 6504 Bradford Terrace 1747 Pennsylvania Ave, N.W. Philadelphia, Pennsylvania 19149 Washington, D..C. 20006 Zori G. Ferkin Frank R. Romano, Chaiman Assistant Counsel Air & Water Pollution Patrol Governor's Energy Council 61 Forest Avenue 1625 N. Front Street Ambler, Pennsylvania 19002 Harrisburg,' Pennsylvania 17105 Federic M. Wentz Charles W. Elliott, Esquire County Solicitor Brose & Poswistilo,1101 Bldg.
County of Montgomery 325 N. 10th Street -
Courthouse Easton, Pennsylvania 18402 Norristown, Pennsylvania 19404 Eugene J. Bradley Ms. M. Mulligan Philadelphia Electric Company Limerick. Ecology Action Associate General Counsel 762 Queen St.
2301 Market Street Pottstown, Pennsylvania 19464 Philadelphia, Pennsylvania 19101 Mr. Vincent Boyer Mr. Karl Abraham Senior Vice President Public Affairs Officer Nuclear Operations Region I Philadelphia Electric Company U.S. Nuclear Regulatory Comission 2301 Market Street 631 Park Avenue Philadelphia, Pennsylvania 19101 King of Prussia, PA 19806 Mr. Suresh Chaudhary Thomas Gerusky, Director Resident Inspector Bureau of Radiation Protection U.S. Nuclear Regulatory Comission Dept. of Enviromental Resources P. O. Box 47 Sth Floor, Fulton Bank Bldg.
Sanatoga, PA' 19464 Third and Locust Streets
- Harrisburg, Pennsylvania 17120 James Wiggins, SR. R.I.
U. S. Nuclear Regulatory Comission P. O. Box 47 Sanatoga, Pennsylvania 19464 ,
J
.~
l -
. 2-Sugaman, Denworth & Hellegers Director, Pennsylvania Emergency Management Agency 16th Floor Center Plaza Basement, Transportation &
101 North Broad Street Safety Building Philadelphia, Pennsylvania .19106 Harrisburg, Pennsylvania 17120 Robert L. Anthony Angus Love, Esq.
Friends of the Earth 107 East Main Street Delaware Valley Norristown, Pennsylvania 19402 103 Vernon Lane, Box 186 Moylan , Pennsylvania 19065 Martha W. Bush Helen F. Hoyt, Chaiman Deputy City Solicitor Administrative Judge Municipal Services Bldg. Atomic Safety & Licensing Board U.S. Nuclear Regulatory Comission 15th and JFK Blvd.
Phildelphia, Pennsylvania 19107 Washington, D. C. 20555 David Wersan, Esq. Dr. Jerry Harbour Administrative Judge Assistant Consumer Advocate Atomic Safety & Licensing Board '-
l Office of Consumer Advocate U.S. Nuclear Regulatory Comission 1425 Strawberry Square Harrisburg, Pennsylvania 17120 Washington, D. C. 20555
. Steven P. Hershey, Esq. Dr. Richard F. Cole Community Legal Services, Inc. Administrative Judge Law Center North Central - Bevry Bldg. Atomic Safety & Licensing Board U.S. Nuclear Regulatory Ccmission 3701 North Board Street Philadelphia, Pennsylvania 19140 Washington, D. C. 20555 Mr. J. T. Robb, NS-1 Mr. Spence W. Perry, Esq.
Philadelphia Electric Company Associate General Counsel Federal Emergency Management Agency 2301 Market Street Philadelphia, Pernylsvania 19101 Room 840 500 C St., S.W.
Washington, D. C. 20472 Timothy R. 5. Campbell, Director Department of Emergency Services 14 East Biddle Street West Chester, Pennsylvania 19380 e
e
O .*
s'.
f7590-01]
NUCLEAR REGULATORY COMMISSION IDocket Nos. 50-352,50-353]
PHILADELPHIA ELECTRIC COMPANY (Limerick Facility)
Request for Action Under 10 CFR 2.206 Regarding Continued Operation At The Limerick Facility Notice is hereby given that, by a Petition dated December 23, 1984, R. L. Anthony and Friends of the Earth (Petitioners) requested that the Nuclear Regulatory Comission institute proceedings by issuing an order to show cause to the Philadelphia Electric Company (Licensee) why License No. NPF-27 for its Limerick Facility'should not be revoked. The Petition ,
bases its request for ' license revocation upon four concerns, namely; that exemptions granted with the issuance of License No. NPF-27 were improperly granted and consequently continued operation raises public health and safety concerns; that Licensee Event Reports filed since the issuance of the License demonstrate that continued operation of the facility is unsafe; that NRC Inspection Reports and correspondence between the NRC and the Licensee further indicate deficiencies at the facility requiring license revocation; and that the Independent Design Verification Program conducted for the facility was insufficient to provide assurance of safe operation under License No. NPF-27.
O g
m l
i l
n- 1 The Petition is being , treated pursuant to 10 CFR 2.206 of the Comission's regulations and accordingly appropriate action will be taken on the request within a reasonable time. A copy of the Petition is available for inspection in the Comission's,Public Document Room,1717 H Street, N.W., Washington, DC 20555 and at the local document room for the Limerick facility located at the Pottstown Public Library, 500 High Street, Pottstown, Pennsylvania 19464.
Dated at Bethesda, Maryland, this 13th day of February 1985.
FOR THE NUCLEAR REGULATORY COMMISSION -
h
/
Harold R. Denton, Director Office of Nuclear Reactor Regulation O
e h
"% C, ,
UNITED STATES NUCLEAR REGULATORY COMMISSION 5*
s- g/ I W ASHING TO N, D. C. 20S55 f;
%..v 4...f VM 2 6 1985 Docket Nos. 50-352/353 (10 CFR 2.206) ;
Mr. Robert L. Anthony .
Box 186 Moylan, Pennsylvania 19065
Dear Mr. Anthony:
i i
This letter acknowledges receipt of your letter to me dated February 25, 1985 reiterating the request made in the Petition filed by you on December 23, 1984 that 1 institute proceedings pursuant to 10 CFR 2.202 by serving an order on the Philadelphia Electric Company to show cause why License No. NPF-27 issued i for the Limerick facility should not be revoked. Your letter will be treated as a supplement to the Petition and the information it contains will be taken For the same into consideration in the fonnal decision which I will issue.
reasons stated in my letter of February 13, 1985 to you, however, I decline to take any immediate action on the basis of the information contained in your letter. .
Sincerely,
/Y ~
Harold R. Denton, Director Office of Nuclear Reactor Regulation 4
^* A % A 30" IvNUus <
N
LIMERICK '
Mr. Edward G. Bauer, Jr Vice President & General Counsel Philadelphia Electric Company Philadelphia, Pennsylvania 19101 Troy B. Conner, Jr. , Esquire Mr. Marvin I. Lewis Conner and Wetterhahn 6504 Bradford Terrace l 1747 Pennsylvania Ave, N.W. Philadelphia, Pennsylvania 19149 Washington, D. C. 20006 7ori G. Ferkin Frank R. Romano, Chainaan Assistant Counsel Air & Water Pollution Patrol Governor's Energy Council 61 Forest Avenue 1625 N. Front Street Ambler, Pennsylvania 19002 Harrisburg, Pennsylvania 17105 Federic M. Wentz Charles W. Elliott, Esquire County Solicitor Brose & Poswistilo,1101 Bldg.
County of Montgomery 325 N.10th Street Courthouse Easton, Pennsylvania 18402 Norristown, Pennsylvania 19404 Eugene J. Bradley Ms. M. Nulligan Philadelphia Electric Company Limeritk Ecology Action Associate General Counsel 762 Queen St.
2301 Market Street Pottstown, Pennsylvania 19454 Philadelphia, Pennsylvania 19101 Mr. Vincent Boyer Mr. Karl Abraham Senior Vice President Public Affairs Officer Nuclear Operations Region I Philadelphia Electric Ccmpany U.S. Nuclear Regulatory Commission 2301 Market Street 631 Park Avenue Philadelphia, Pennsylvania 19101 King of Prussia, PA 19806 Mr. Suresh Chaudhary Thomas Gerusky, Director Resident Inspector Bureau of Radiation Protection U.S. Nuclear Regulatory Commission Dept. of Enviromental Resources P. O. Box 47 Sth Floor, Fulton Bank Bldg.
Sanatoga, PA 19464
- Third and Locust Streets Harrisburg, Pennsylvania 17120 James Wiggins, SR. R.I.
U. S. Nuclear Regulatory Commission P. O. Box 47 Sanatoga, Pennsylvania 19464
e .
'o m
Sugarman, Denworth & Hellegers Director, Pennsylvania Emergency 16th Floor Center Plaza Management Agency 101 North Broad Street Basement, Transportation &
Philadelphia, Pennsylvania 19106 Safety Building Harrisburg, Pennsylvania 17120 Robert L. Anthony Angus Love, Esq.
Friends of the Earth 107 East Main Street Delaware Valley Norristown, Pennsylvania 19402 103 Vernon Lane, Box 186 Moylan , Pennsylvania 19065 Martha W. Bush Helen F. Hoyt, Chairman Deputy City Solicitor Administrative Judge Municipal Services Bldg. Atomic Safety & Licensing Board 15th and JFK Blvd. U.S. Nuclear Regulatory Commission 1 Phildelphia, Pennsylvania 19107 Washington, D. C. 20555 David Wersan, Esq. Dr. Jerry Harbour Assistant Consumer Advocate Administrative Judge Office of Consumer Advocate Atomic Safety & Licensing Board 1425 Strawberry Square U.S. Nuclear Regulatory Commission Harrisburg, Pennsylvania 17120 Washington, D. C. 20555 1
Steven P. Hershey, Esq. .Dr. Richard F. Cole Community Legal Services, Inc. Administrative Judge Law Center North Central - Bevry Bldg. Atomic Safety & Licensing Board 3701 North Board Street U.S. Nuclear Regulatory Commission Philadelphia, Pennsylvania 19140 Washington, D. C. 20555 Mr. J. T. Robb, NS-1 Mr. Spence W. Perry, Esq.
Philadelphia Electric Company Associate General Counsel 2301 Market Street Federal Emergency Management Agency Philadelphia, Pennylsvania 19101 Room 840 500 C St., S.W.
Timothy R. S. Campbell, Director Washington, D. C. 20472 Department of Emergency Services 14 East Biddle Street West Chester, Pennsylvania 19380 i
9
'O eGug4'c
. ~
UNITED STATES (p . , 'i NUCLEAR REGULATORY COMMISSION
, cg %,- . WASHINGTON, D. C. 20555 e%, w .. ".** 5 A.t 2 6 1985 Occket tios. 50-352/353
?
(10 CFR 2.206)
Mr. Marvin I. Lewis 6504 Bradford Terrace Philadelphia. Pennsylvania 19149
Dear Mr. Lewis:
This letter acknowledges receipt of your letter to me of February 15, 1985, commenting on the Petition filed by Mr. Robert L. Anthony on December 23, 1984lon behalf of himself and Friends of the Earth. That Petition sought the institution of proceedings pursuant to 10 CFR 2.202 by serving ac order on thet Philadelphia Electric Company to show cause why License No. NPF-27 issued
)
for the Limerick facility should not be revoked. Your letter provides your comments on certain issues raised by Mr. Anthony in his Petition. You request.that Mr. Anthony's Petition be granted. Your comments will be considered in the formal decision I reach in respect to this matter pursuant to 10 CFR 2.206.
Sincerely,
/
Harold R. Denton, Director Office of Nuclear Reactor Regulation e
e wn p IIhv)- -
y>v n v a u I .3 ]
9 LIMERICK Mr. Edward G. Bauer, Jr Vice President & General Counsel Philadelphia Electric Company Philadelphia, Pennsylvania 19101 Troy B. Conner, Jr., Esquire Mr. Marvin I. Lewis Conner and Wetterhahn 6504 Bradford Terrace 1747 Pennsylvania Ave, N.W. Philadelphia, Pennsylvania 19149 Washington, D. C. 20006 7ori G. Ferkin Frank R. Romano, Chairman Assistant Counsel Air & Water Pollution Patrol Governor's Energy Council 61 Forest Avenue 1625 N. Front Street Ambler, Pennsylvania 19002 Harrisburg, Pennsylvania 17105 Charles W. Elliott, Esauire Federic M. Wentz County Solicitor Brose & Poswistilo,1101 Bldg.
County of Montgomery 325 N. 10th Street Courthouse Easton, Pennsylvania 18402 Norristown, Pennsylvania 19404 Eugene J. Bradley Ms. M. Mulligan Philadelphia Electric Company . Limerick Ecology Action Associate General Counsel 762 Queen St.
2301 Market Street Pottstown, Pennsylvania 19464 Philade,lphia, Pennsylvania 19101 Mr. Vincent Boyer Mr. Karl Abraham Senior Vice President Public Affairs Officer Nuclear Operations Region I Philadelphia Electric Company U.S. Nuclear Regulatory Commission 2301 Market Street 631 Park Avenue Philadelphia, Pennsylvania 19101 King of Prussia, PA 19806 Mr. Suresh Chaudhary Thomas Gerusky, Director Resident Inspector Bureau of Radiation Protection U.S. Nuclear Regulatory Commission Dept. of Enviromental Resources P. O. Box 47 5th Floor, Fulton Bank Bldg.
Sanatoga, PA 19464 Third and Locust Streets Harrisburg, Pennsylvania 17120 James Wiggins, SR. R.I.
U. S. Nuclear Regulatory Conmission P. O. Box 47 Sanatoga, Pennsylvania 19464 .
r-2-
Sugarman, Denworth & Hellegers Director, Pennsylvania Emergency 16th Floor Center Plazz Management Agency 101 North Broad Street Basement. Transportation &
Philadelphia, Pennsylvania 19106 Safety Building Harrisburg, Pennsylvania 17120 Robert L. Anthony Angus Love, Esq.
Friends of the Earth 107 East Main Street Delaware Valley Norristown, Pennsylvania 19402 103 Vernon Lane, Box 186 Moylan , Pennsylvania 19065 Martha W. Bush Helen F. Hoyt, Chairman Deputy City Solicitor Administrative Judge Municipal Services Bldg. Atomic Safety & Licensing Board 15th and JFK Blvd. U.S. Nuclear Regulatory Commission Phildelphia, Pennsylvania 19107 Washington, D. C. 20555 David Wersan, Esq. Dr. Jerry Harbour Assistant Consumer Advocate Administrative Judge Office of Consumer Advocate Atomic Safety & Licensing Board 1425 Strawberry Square -
U.S. Nuclear Regulatory Commission Harrisburg, Pennsylvania 17120 Washington, D. C. 20555 Steven P. Hershey, Esq. Dr. Richard F. Cole Conmunity Legal Services, Inc. Administrative Judge Law Center North Central - Bevry Bldg. Atomic Safety & Licensing Board 3701 North ~ Board Street U.S. Nuclear Regulatory Commission Philadelphia, Pennsylvania 19140 Washington, D. C. 20555 Mr. J. T. Robb, NS-1 Mr. Spence W. Perry, Esq.
Philadelphia Electric Company Associate General Counsel 2301 Market Street Federal Emergency Management Agency Philadelphia, Pennylsvania 19101 Room 840 500 C St., S.W.
Timothy R. S. Campbell, Director Washington, D. C. 20472 Department of Emergency Services 14 East Biddle Street West Chester, Pennsylvania 19380 e
0 l
l
- d#
- lo DISTRIBUTION DATED GREEN TICKET - EDO TICKET #000514 DocketFilsf(502352)1 NRC PDR*
Local PDR*
PRC System
EDO Control No. 000514 EDO Reading File WDircks RMartin EHylton LB#2 Reading (Darlene Hinton)
HThompson/MJambour DEisenhut/HDenton BVogler SBurns P0'Brien/TMNovak ASchwencer KBowman, P-428 #000514 TMurley GCunningham -
SECY (SECY Tkt. No.85-278)
OCA RHoefling, OELD
4 m