Category:INSPECTION REPORT
MONTHYEARIR 05000219/19980121999-03-0404 March 1999 Insp Rept 50-219/98-12 During Periods 981214-18,990106-07 & 20-22.No Violations Identified.Major Areas Inspected: Review of Licensee self-assessment of Plant Environ Qualification Program & Corrective Actions for Open Items IR 05000219/19980091998-11-25025 November 1998 Insp Rept 50-219/98-09 on 980914-1025.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000219/19980081998-10-20020 October 1998 Insp Rept 50-219/98-08 on 980727-0913.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19980051998-08-26026 August 1998 Insp Rept 50-219/98-05 on 980614-0726.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000219/19980071998-07-0202 July 1998 Insp Rept 50-219/98-07 on 980615-19.No Violations Noted. Major Areas Inspected:Status of Plant motor-operated Valve Program to Determine Acceptability for Closure of NRC Review Under GL 89-10 ML20217F6641998-04-22022 April 1998 Insp Rept 50-219/98-80 on 980223-0313 & 0330-0402.Violations Noted.Major Areas Inspected:Engineering ML20216H1911998-04-15015 April 1998 Insp Rept 50-219/98-04 on 980226-0318.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000219/19970081997-12-0404 December 1997 Insp Rept 50-219/97-08 on 971020-24.No Violations Noted. Major Areas Inspected:Onsite Emergency Plan IR 05000219/19970041997-07-29029 July 1997 Insp Rept 50-219/97-04 on 970526-0706.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000219/19970051997-07-17017 July 1997 Insp Rept 50-219/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Engineering ML20141G9431997-07-0303 July 1997 Insp Rept 50-219/97-03 on 970414-0525.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000219/19970021997-05-19019 May 1997 Insp Rept 50-219/97-02 on 970224-0413.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20137E9491997-03-21021 March 1997 Insp Rept 50-219/97-01 on 970113-0223.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19960101996-09-27027 September 1996 Insp Rept 50-219/96-10 on 960923-27.No Violations Noted. Major Areas Inspected:Radiological Source Term Assessment, Results of Exposure Reduction Initiatives & Evidence of Station ALARA Program IR 05000219/19960111996-01-0202 January 1996 Insp Rept 50-219/96-11 on 961021-1201.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19930811993-12-22022 December 1993 Insp Rept 50-219/93-81 on 930927-1015.Violations Noted.Major Areas Inspected:Engineering,Maint,Surveillance & Mgt & Corrective Actions IR 05000219/19930261993-11-18018 November 1993 Insp Rept 50-219/93-26 on 931101-05.No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Access Control of Personnel & Packages & Vehicles IR 05000219/19930241993-11-18018 November 1993 Insp Rept 50-219/93-24 on 930921-1101.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering,Plant Support,Including Security & Emergency Preparedness & Safety Assessment/Quality Verification ML20058A3791993-11-12012 November 1993 Insp Rept 50-219/93-23 on 931018-20.Onsite Response to Exercise Scenario Was Good.Major Areas inspected:full- Participation Ingestion Pathway Emergency Preparedness Exercise IR 05000219/19930251993-11-0909 November 1993 Insp Rept 50-219/93-25 on 931018-22.No Violations Noted. Major Areas Inspected:Design Mods & Engineering Support ML20059F6251993-10-28028 October 1993 Insp Rept 50-219/93-22 on 930920-24.No Violations Noted. Major Areas Inspected:Addressed Open Items Associated W/Eop & Reviewed Licensee Actions in Response to Violations Associated W/Recirculation Loop Isolation Event IR 05000219/19930181993-10-28028 October 1993 Insp Rept 50-219/93-18 on 930823-1020.No Violations Noted. Major Areas Inspected:Alara,Rirs,Qa Audits,Air & Swipe Sample Counting Facilities & Radiological Controls Organization Professional Staffing IR 05000219/19930201993-10-19019 October 1993 Insp Rept 50-219/93-20 on 930816-930917.No Violations Noted. Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs Including Mgt Controls & QA Audits IR 05000219/19930211993-10-15015 October 1993 Insp Rept 50-219/93-21 on 930810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000219/19930111993-09-10010 September 1993 Insp Rept 50-219/93-11 on 930629-0809.No Violations Noted. Major Areas Inspected:Day Shift & Back Shift Hours of Station Activities IR 05000219/19930191993-09-0909 September 1993 Insp Rept 50-219/93-19 on 930816-20.Violations Noted.Major Areas Inspected:Radiological Environ Monitoring Program & Meteorological Monitoring Program IR 05000219/19930141993-09-0202 September 1993 EP Insp Rept 50-219/93-14 on 930802-05.Concerns Noted. Major Areas Inspected:Epip,Equipment,Instrumentation & Supplies IR 05000219/19930161993-08-27027 August 1993 Insp Rept 50-219/93-16 on 930726-30.Major Areas Inspected: Erosion/Corrosion Insp Program,Per GL 89-08.Program & Program Implementation Generally Good.Staff Responsible for Program Development & Implementation Qualified IR 05000219/19930121993-08-26026 August 1993 Insp Rept 50-219/93-12 on 930706-09.No Violations Noted. Major Areas Inspected:Licensee Progress in Incorporating EQ Component Info Into GMS2 Computer Database IR 05000219/19920221993-03-19019 March 1993 Mobile NDE Lab Insp 50-219/92-22 on 921207-11 & 930111-15. No Violations Noted.Major Areas Inspected:Cs,Css,Sdc,Ms & FW Sys IR 05000219/19920251993-02-10010 February 1993 Insp Rept 50-219/92-25 on 921215-930118.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Maint & Surveillance,Engneering & Technical Support, Emergency Preparedness & Security IR 05000219/19930011993-01-29029 January 1993 Insp Rept 50-219/93-01 on 930104-08.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Postings & Other in Plant Radiological Controls,Work in Progress, Housekeeping & Self Reading Dosimeter Use IR 05000219/19920231992-12-24024 December 1992 Insp Rept 50-219/92-23 on 921103-1214.No Violations Noted. Major Areas Inspected:Plant Operations,Security & Safety Assessment/Quality Verification IR 05000219/19910041991-03-0101 March 1991 Partially Withheld Insp Rept 50-219/91-04 on 910204-07.No Violations Noted.Major Areas Inspected:Protected Area Physical Barriers,Isolation Zones & Lighting,Protected Area Access Control of Personnel & Security Training IR 05000219/19900191990-11-16016 November 1990 Insp Rept 50-219/90-19 on 900923-1020.Violations Noted. Areas Inspected:Radiological Protection,Surveillance & Maintenance,Emergency Preparedness,Security,Engineering & Technical Support & Safety Assessment/Quality Verification IR 05000219/19900201990-11-0202 November 1990 Insp Rept 50-219/90-20 on 901022-26.No Violations Noted. Major Areas Inspected:Internal Exposure Control & Review of Procedures for Drywell Occupancy During Fuel Movement IR 05000219/19900161990-10-18018 October 1990 Insp Rept 50-219/90-16 on 900823-0922.Violations Noted.Major Areas Inspected:Observation of Plant Activities,Review of Operational Events,Operation of Turbine Bldg Ventilation Sys & Walkdown of Emergency Diesel Fuel Oil Transfer Sys ML20058F3241990-10-0202 October 1990 Insp Rept 50-219/90-17 on 900918-21.No Violations Noted. Major Areas Inspected:Transportation & Solid Radwaste Programs IR 05000219/19900151990-09-20020 September 1990 Partially Withheld Safeguards Insp Rept 50-219/90-15 on 900820-24 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Support,Security Program Plans,Audits,Protected & Vital Areas Physical Barriers,Power Supply & Testing IR 05000219/19900111990-08-15015 August 1990 Insp Rept 50-219/90-11 on 900610-0711.Noncited Violation Noted.Major Areas Inspected:Observation & Review of Plant Operations,Review of Radiological Controls & Routine Observations of Maint Activities & Surveillance Tests ML20056A6191990-07-19019 July 1990 Insp Rept 50-219/90-09 on 900422-0609.Violations Noted. Major Areas Inspected:Observation & Review of Routine Plant Activities & Operational Events,Site Radiological Controls & Events & Observations of Corrective Maint Activities IR 05000219/19890291990-02-16016 February 1990 Insp Rept 50-219/89-29 on 891203-900106.Major Areas Inspected:Observation & Review of Plant Operational Events, Condenser Vacuum Transient,Unusual Events Due to Low Intake Water Level & Simultaneous Movement of Two Control Rods IR 05000219/19890181989-09-13013 September 1989 Insp Rept 50-219/89-18 on 890724-28.No Violations Noted. Major Areas Inspected:Review of Licensee Actions on Previous NRC Concerns,Atws Rule Implementation,Procurement Control & non-licensed Operators Training IR 05000219/19890201989-09-0707 September 1989 Insp Rept 50-219/89-20 on 890829-30.No Exercise Weaknesses Noted.Major Areas Inspected:Licensee Emergency Preparedness Exercise Conducted on 890829-30 ML20246J6261989-08-18018 August 1989 Insp Rept 50-219/89-16 on 890702-29.Violations Noted.Major Areas Inspected:Plant Operational Events,Control of High Radiation Areas,Evaluation of Plant Operation W/High Canal Water Temps & Security Response to Vital Area Door Problem IR 05000219/19890191989-08-15015 August 1989 Insp Rept 50-219/89-19 on 890802-04.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys & Transportation Programs,Including Mgt Controls,Audits,Qa & Implementation of Subj Programs IR 05000219/19890151989-08-0909 August 1989 Insp Rept 50-219/89-15 on 890627-30.No Violations Noted. Major Areas Inspected:Organization & Qualifications of Radiological Controls Personnel in Site Organization IR 05000219/19890141989-08-0303 August 1989 Insp Rept 50-219/89-14 on 890604-0701.No Violations Noted. Major Areas Inspected:Core Spray Booster Pump Trips,Under Voltage Relay Failure,Monthly Surveillance Observations, Emergency Svc Water Pump Operability & Oyster Creek Drawing IR 05000219/19890111989-07-25025 July 1989 Insp Rept 50-219/89-11 on 890606-08.Major Areas Inspected: Emergency Preparedness Insp of full-participation Exercise of Licensee Emergency Plan Conducted on 890607.Exercise Did Not Meet Requirements for Annual Test of Emergency Plan IR 05000219/19890121989-07-21021 July 1989 Insp Rept 50-219/89-12 on 890430-0603.Violations Noted.Major Areas Inspected:Plant Operational Events Including Three Reactor Startups & Licensee Corrective Actions Re Reactor Coolant Pressure Boundary Hangers Being Pinned 1999-03-04
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000219/19980121999-03-0404 March 1999 Insp Rept 50-219/98-12 During Periods 981214-18,990106-07 & 20-22.No Violations Identified.Major Areas Inspected: Review of Licensee self-assessment of Plant Environ Qualification Program & Corrective Actions for Open Items IR 05000219/19980091998-11-25025 November 1998 Insp Rept 50-219/98-09 on 980914-1025.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000219/19980081998-10-20020 October 1998 Insp Rept 50-219/98-08 on 980727-0913.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19980051998-08-26026 August 1998 Insp Rept 50-219/98-05 on 980614-0726.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000219/19980071998-07-0202 July 1998 Insp Rept 50-219/98-07 on 980615-19.No Violations Noted. Major Areas Inspected:Status of Plant motor-operated Valve Program to Determine Acceptability for Closure of NRC Review Under GL 89-10 ML20217F6641998-04-22022 April 1998 Insp Rept 50-219/98-80 on 980223-0313 & 0330-0402.Violations Noted.Major Areas Inspected:Engineering ML20216H1911998-04-15015 April 1998 Insp Rept 50-219/98-04 on 980226-0318.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000219/19970081997-12-0404 December 1997 Insp Rept 50-219/97-08 on 971020-24.No Violations Noted. Major Areas Inspected:Onsite Emergency Plan IR 05000219/19970041997-07-29029 July 1997 Insp Rept 50-219/97-04 on 970526-0706.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000219/19970051997-07-17017 July 1997 Insp Rept 50-219/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Engineering ML20141G9431997-07-0303 July 1997 Insp Rept 50-219/97-03 on 970414-0525.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000219/19970021997-05-19019 May 1997 Insp Rept 50-219/97-02 on 970224-0413.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20137E9491997-03-21021 March 1997 Insp Rept 50-219/97-01 on 970113-0223.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19960101996-09-27027 September 1996 Insp Rept 50-219/96-10 on 960923-27.No Violations Noted. Major Areas Inspected:Radiological Source Term Assessment, Results of Exposure Reduction Initiatives & Evidence of Station ALARA Program IR 05000219/19960111996-01-0202 January 1996 Insp Rept 50-219/96-11 on 961021-1201.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19930811993-12-22022 December 1993 Insp Rept 50-219/93-81 on 930927-1015.Violations Noted.Major Areas Inspected:Engineering,Maint,Surveillance & Mgt & Corrective Actions IR 05000219/19930261993-11-18018 November 1993 Insp Rept 50-219/93-26 on 931101-05.No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Access Control of Personnel & Packages & Vehicles IR 05000219/19930241993-11-18018 November 1993 Insp Rept 50-219/93-24 on 930921-1101.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering,Plant Support,Including Security & Emergency Preparedness & Safety Assessment/Quality Verification ML20058A3791993-11-12012 November 1993 Insp Rept 50-219/93-23 on 931018-20.Onsite Response to Exercise Scenario Was Good.Major Areas inspected:full- Participation Ingestion Pathway Emergency Preparedness Exercise IR 05000219/19930251993-11-0909 November 1993 Insp Rept 50-219/93-25 on 931018-22.No Violations Noted. Major Areas Inspected:Design Mods & Engineering Support ML20059F6251993-10-28028 October 1993 Insp Rept 50-219/93-22 on 930920-24.No Violations Noted. Major Areas Inspected:Addressed Open Items Associated W/Eop & Reviewed Licensee Actions in Response to Violations Associated W/Recirculation Loop Isolation Event IR 05000219/19930181993-10-28028 October 1993 Insp Rept 50-219/93-18 on 930823-1020.No Violations Noted. Major Areas Inspected:Alara,Rirs,Qa Audits,Air & Swipe Sample Counting Facilities & Radiological Controls Organization Professional Staffing IR 05000219/19930201993-10-19019 October 1993 Insp Rept 50-219/93-20 on 930816-930917.No Violations Noted. Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs Including Mgt Controls & QA Audits IR 05000219/19930211993-10-15015 October 1993 Insp Rept 50-219/93-21 on 930810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000219/19930111993-09-10010 September 1993 Insp Rept 50-219/93-11 on 930629-0809.No Violations Noted. Major Areas Inspected:Day Shift & Back Shift Hours of Station Activities IR 05000219/19930191993-09-0909 September 1993 Insp Rept 50-219/93-19 on 930816-20.Violations Noted.Major Areas Inspected:Radiological Environ Monitoring Program & Meteorological Monitoring Program IR 05000219/19930141993-09-0202 September 1993 EP Insp Rept 50-219/93-14 on 930802-05.Concerns Noted. Major Areas Inspected:Epip,Equipment,Instrumentation & Supplies IR 05000219/19930161993-08-27027 August 1993 Insp Rept 50-219/93-16 on 930726-30.Major Areas Inspected: Erosion/Corrosion Insp Program,Per GL 89-08.Program & Program Implementation Generally Good.Staff Responsible for Program Development & Implementation Qualified IR 05000219/19930121993-08-26026 August 1993 Insp Rept 50-219/93-12 on 930706-09.No Violations Noted. Major Areas Inspected:Licensee Progress in Incorporating EQ Component Info Into GMS2 Computer Database IR 05000219/19920221993-03-19019 March 1993 Mobile NDE Lab Insp 50-219/92-22 on 921207-11 & 930111-15. No Violations Noted.Major Areas Inspected:Cs,Css,Sdc,Ms & FW Sys IR 05000219/19920251993-02-10010 February 1993 Insp Rept 50-219/92-25 on 921215-930118.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Maint & Surveillance,Engneering & Technical Support, Emergency Preparedness & Security IR 05000219/19930011993-01-29029 January 1993 Insp Rept 50-219/93-01 on 930104-08.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Postings & Other in Plant Radiological Controls,Work in Progress, Housekeeping & Self Reading Dosimeter Use IR 05000219/19920231992-12-24024 December 1992 Insp Rept 50-219/92-23 on 921103-1214.No Violations Noted. Major Areas Inspected:Plant Operations,Security & Safety Assessment/Quality Verification IR 05000219/19910041991-03-0101 March 1991 Partially Withheld Insp Rept 50-219/91-04 on 910204-07.No Violations Noted.Major Areas Inspected:Protected Area Physical Barriers,Isolation Zones & Lighting,Protected Area Access Control of Personnel & Security Training IR 05000219/19900191990-11-16016 November 1990 Insp Rept 50-219/90-19 on 900923-1020.Violations Noted. Areas Inspected:Radiological Protection,Surveillance & Maintenance,Emergency Preparedness,Security,Engineering & Technical Support & Safety Assessment/Quality Verification IR 05000219/19900201990-11-0202 November 1990 Insp Rept 50-219/90-20 on 901022-26.No Violations Noted. Major Areas Inspected:Internal Exposure Control & Review of Procedures for Drywell Occupancy During Fuel Movement IR 05000219/19900161990-10-18018 October 1990 Insp Rept 50-219/90-16 on 900823-0922.Violations Noted.Major Areas Inspected:Observation of Plant Activities,Review of Operational Events,Operation of Turbine Bldg Ventilation Sys & Walkdown of Emergency Diesel Fuel Oil Transfer Sys ML20058F3241990-10-0202 October 1990 Insp Rept 50-219/90-17 on 900918-21.No Violations Noted. Major Areas Inspected:Transportation & Solid Radwaste Programs IR 05000219/19900151990-09-20020 September 1990 Partially Withheld Safeguards Insp Rept 50-219/90-15 on 900820-24 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Support,Security Program Plans,Audits,Protected & Vital Areas Physical Barriers,Power Supply & Testing IR 05000219/19900111990-08-15015 August 1990 Insp Rept 50-219/90-11 on 900610-0711.Noncited Violation Noted.Major Areas Inspected:Observation & Review of Plant Operations,Review of Radiological Controls & Routine Observations of Maint Activities & Surveillance Tests ML20056A6191990-07-19019 July 1990 Insp Rept 50-219/90-09 on 900422-0609.Violations Noted. Major Areas Inspected:Observation & Review of Routine Plant Activities & Operational Events,Site Radiological Controls & Events & Observations of Corrective Maint Activities IR 05000219/19890291990-02-16016 February 1990 Insp Rept 50-219/89-29 on 891203-900106.Major Areas Inspected:Observation & Review of Plant Operational Events, Condenser Vacuum Transient,Unusual Events Due to Low Intake Water Level & Simultaneous Movement of Two Control Rods IR 05000219/19890181989-09-13013 September 1989 Insp Rept 50-219/89-18 on 890724-28.No Violations Noted. Major Areas Inspected:Review of Licensee Actions on Previous NRC Concerns,Atws Rule Implementation,Procurement Control & non-licensed Operators Training IR 05000219/19890201989-09-0707 September 1989 Insp Rept 50-219/89-20 on 890829-30.No Exercise Weaknesses Noted.Major Areas Inspected:Licensee Emergency Preparedness Exercise Conducted on 890829-30 ML20246J6261989-08-18018 August 1989 Insp Rept 50-219/89-16 on 890702-29.Violations Noted.Major Areas Inspected:Plant Operational Events,Control of High Radiation Areas,Evaluation of Plant Operation W/High Canal Water Temps & Security Response to Vital Area Door Problem IR 05000219/19890191989-08-15015 August 1989 Insp Rept 50-219/89-19 on 890802-04.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys & Transportation Programs,Including Mgt Controls,Audits,Qa & Implementation of Subj Programs IR 05000219/19890151989-08-0909 August 1989 Insp Rept 50-219/89-15 on 890627-30.No Violations Noted. Major Areas Inspected:Organization & Qualifications of Radiological Controls Personnel in Site Organization IR 05000219/19890141989-08-0303 August 1989 Insp Rept 50-219/89-14 on 890604-0701.No Violations Noted. Major Areas Inspected:Core Spray Booster Pump Trips,Under Voltage Relay Failure,Monthly Surveillance Observations, Emergency Svc Water Pump Operability & Oyster Creek Drawing IR 05000219/19890111989-07-25025 July 1989 Insp Rept 50-219/89-11 on 890606-08.Major Areas Inspected: Emergency Preparedness Insp of full-participation Exercise of Licensee Emergency Plan Conducted on 890607.Exercise Did Not Meet Requirements for Annual Test of Emergency Plan IR 05000219/19890121989-07-21021 July 1989 Insp Rept 50-219/89-12 on 890430-0603.Violations Noted.Major Areas Inspected:Plant Operational Events Including Three Reactor Startups & Licensee Corrective Actions Re Reactor Coolant Pressure Boundary Hangers Being Pinned 1999-03-04
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000219/19980121999-03-0404 March 1999 Insp Rept 50-219/98-12 During Periods 981214-18,990106-07 & 20-22.No Violations Identified.Major Areas Inspected: Review of Licensee self-assessment of Plant Environ Qualification Program & Corrective Actions for Open Items IR 05000219/19980091998-11-25025 November 1998 Insp Rept 50-219/98-09 on 980914-1025.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000219/19980081998-10-20020 October 1998 Insp Rept 50-219/98-08 on 980727-0913.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19980051998-08-26026 August 1998 Insp Rept 50-219/98-05 on 980614-0726.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000219/19980071998-07-0202 July 1998 Insp Rept 50-219/98-07 on 980615-19.No Violations Noted. Major Areas Inspected:Status of Plant motor-operated Valve Program to Determine Acceptability for Closure of NRC Review Under GL 89-10 ML20217F6641998-04-22022 April 1998 Insp Rept 50-219/98-80 on 980223-0313 & 0330-0402.Violations Noted.Major Areas Inspected:Engineering ML20216H1911998-04-15015 April 1998 Insp Rept 50-219/98-04 on 980226-0318.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000219/19970081997-12-0404 December 1997 Insp Rept 50-219/97-08 on 971020-24.No Violations Noted. Major Areas Inspected:Onsite Emergency Plan IR 05000219/19970041997-07-29029 July 1997 Insp Rept 50-219/97-04 on 970526-0706.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000219/19970051997-07-17017 July 1997 Insp Rept 50-219/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Engineering ML20141G9431997-07-0303 July 1997 Insp Rept 50-219/97-03 on 970414-0525.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000219/19970021997-05-19019 May 1997 Insp Rept 50-219/97-02 on 970224-0413.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20137E9491997-03-21021 March 1997 Insp Rept 50-219/97-01 on 970113-0223.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19960101996-09-27027 September 1996 Insp Rept 50-219/96-10 on 960923-27.No Violations Noted. Major Areas Inspected:Radiological Source Term Assessment, Results of Exposure Reduction Initiatives & Evidence of Station ALARA Program IR 05000219/19960111996-01-0202 January 1996 Insp Rept 50-219/96-11 on 961021-1201.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19930811993-12-22022 December 1993 Insp Rept 50-219/93-81 on 930927-1015.Violations Noted.Major Areas Inspected:Engineering,Maint,Surveillance & Mgt & Corrective Actions IR 05000219/19930261993-11-18018 November 1993 Insp Rept 50-219/93-26 on 931101-05.No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Access Control of Personnel & Packages & Vehicles IR 05000219/19930241993-11-18018 November 1993 Insp Rept 50-219/93-24 on 930921-1101.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering,Plant Support,Including Security & Emergency Preparedness & Safety Assessment/Quality Verification ML20058A3791993-11-12012 November 1993 Insp Rept 50-219/93-23 on 931018-20.Onsite Response to Exercise Scenario Was Good.Major Areas inspected:full- Participation Ingestion Pathway Emergency Preparedness Exercise IR 05000219/19930251993-11-0909 November 1993 Insp Rept 50-219/93-25 on 931018-22.No Violations Noted. Major Areas Inspected:Design Mods & Engineering Support ML20059F6251993-10-28028 October 1993 Insp Rept 50-219/93-22 on 930920-24.No Violations Noted. Major Areas Inspected:Addressed Open Items Associated W/Eop & Reviewed Licensee Actions in Response to Violations Associated W/Recirculation Loop Isolation Event IR 05000219/19930181993-10-28028 October 1993 Insp Rept 50-219/93-18 on 930823-1020.No Violations Noted. Major Areas Inspected:Alara,Rirs,Qa Audits,Air & Swipe Sample Counting Facilities & Radiological Controls Organization Professional Staffing IR 05000219/19930201993-10-19019 October 1993 Insp Rept 50-219/93-20 on 930816-930917.No Violations Noted. Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs Including Mgt Controls & QA Audits IR 05000219/19930211993-10-15015 October 1993 Insp Rept 50-219/93-21 on 930810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000219/19930111993-09-10010 September 1993 Insp Rept 50-219/93-11 on 930629-0809.No Violations Noted. Major Areas Inspected:Day Shift & Back Shift Hours of Station Activities IR 05000219/19930191993-09-0909 September 1993 Insp Rept 50-219/93-19 on 930816-20.Violations Noted.Major Areas Inspected:Radiological Environ Monitoring Program & Meteorological Monitoring Program IR 05000219/19930141993-09-0202 September 1993 EP Insp Rept 50-219/93-14 on 930802-05.Concerns Noted. Major Areas Inspected:Epip,Equipment,Instrumentation & Supplies IR 05000219/19930161993-08-27027 August 1993 Insp Rept 50-219/93-16 on 930726-30.Major Areas Inspected: Erosion/Corrosion Insp Program,Per GL 89-08.Program & Program Implementation Generally Good.Staff Responsible for Program Development & Implementation Qualified IR 05000219/19930121993-08-26026 August 1993 Insp Rept 50-219/93-12 on 930706-09.No Violations Noted. Major Areas Inspected:Licensee Progress in Incorporating EQ Component Info Into GMS2 Computer Database IR 05000219/19920221993-03-19019 March 1993 Mobile NDE Lab Insp 50-219/92-22 on 921207-11 & 930111-15. No Violations Noted.Major Areas Inspected:Cs,Css,Sdc,Ms & FW Sys IR 05000219/19920251993-02-10010 February 1993 Insp Rept 50-219/92-25 on 921215-930118.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Maint & Surveillance,Engneering & Technical Support, Emergency Preparedness & Security IR 05000219/19930011993-01-29029 January 1993 Insp Rept 50-219/93-01 on 930104-08.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Postings & Other in Plant Radiological Controls,Work in Progress, Housekeeping & Self Reading Dosimeter Use IR 05000219/19920231992-12-24024 December 1992 Insp Rept 50-219/92-23 on 921103-1214.No Violations Noted. Major Areas Inspected:Plant Operations,Security & Safety Assessment/Quality Verification IR 05000219/19910041991-03-0101 March 1991 Partially Withheld Insp Rept 50-219/91-04 on 910204-07.No Violations Noted.Major Areas Inspected:Protected Area Physical Barriers,Isolation Zones & Lighting,Protected Area Access Control of Personnel & Security Training IR 05000219/19900191990-11-16016 November 1990 Insp Rept 50-219/90-19 on 900923-1020.Violations Noted. Areas Inspected:Radiological Protection,Surveillance & Maintenance,Emergency Preparedness,Security,Engineering & Technical Support & Safety Assessment/Quality Verification IR 05000219/19900201990-11-0202 November 1990 Insp Rept 50-219/90-20 on 901022-26.No Violations Noted. Major Areas Inspected:Internal Exposure Control & Review of Procedures for Drywell Occupancy During Fuel Movement IR 05000219/19900161990-10-18018 October 1990 Insp Rept 50-219/90-16 on 900823-0922.Violations Noted.Major Areas Inspected:Observation of Plant Activities,Review of Operational Events,Operation of Turbine Bldg Ventilation Sys & Walkdown of Emergency Diesel Fuel Oil Transfer Sys ML20058F3241990-10-0202 October 1990 Insp Rept 50-219/90-17 on 900918-21.No Violations Noted. Major Areas Inspected:Transportation & Solid Radwaste Programs IR 05000219/19900151990-09-20020 September 1990 Partially Withheld Safeguards Insp Rept 50-219/90-15 on 900820-24 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Support,Security Program Plans,Audits,Protected & Vital Areas Physical Barriers,Power Supply & Testing IR 05000219/19900111990-08-15015 August 1990 Insp Rept 50-219/90-11 on 900610-0711.Noncited Violation Noted.Major Areas Inspected:Observation & Review of Plant Operations,Review of Radiological Controls & Routine Observations of Maint Activities & Surveillance Tests ML20056A6191990-07-19019 July 1990 Insp Rept 50-219/90-09 on 900422-0609.Violations Noted. Major Areas Inspected:Observation & Review of Routine Plant Activities & Operational Events,Site Radiological Controls & Events & Observations of Corrective Maint Activities IR 05000219/19890291990-02-16016 February 1990 Insp Rept 50-219/89-29 on 891203-900106.Major Areas Inspected:Observation & Review of Plant Operational Events, Condenser Vacuum Transient,Unusual Events Due to Low Intake Water Level & Simultaneous Movement of Two Control Rods IR 05000219/19890181989-09-13013 September 1989 Insp Rept 50-219/89-18 on 890724-28.No Violations Noted. Major Areas Inspected:Review of Licensee Actions on Previous NRC Concerns,Atws Rule Implementation,Procurement Control & non-licensed Operators Training IR 05000219/19890201989-09-0707 September 1989 Insp Rept 50-219/89-20 on 890829-30.No Exercise Weaknesses Noted.Major Areas Inspected:Licensee Emergency Preparedness Exercise Conducted on 890829-30 ML20246J6261989-08-18018 August 1989 Insp Rept 50-219/89-16 on 890702-29.Violations Noted.Major Areas Inspected:Plant Operational Events,Control of High Radiation Areas,Evaluation of Plant Operation W/High Canal Water Temps & Security Response to Vital Area Door Problem IR 05000219/19890191989-08-15015 August 1989 Insp Rept 50-219/89-19 on 890802-04.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys & Transportation Programs,Including Mgt Controls,Audits,Qa & Implementation of Subj Programs IR 05000219/19890151989-08-0909 August 1989 Insp Rept 50-219/89-15 on 890627-30.No Violations Noted. Major Areas Inspected:Organization & Qualifications of Radiological Controls Personnel in Site Organization IR 05000219/19890141989-08-0303 August 1989 Insp Rept 50-219/89-14 on 890604-0701.No Violations Noted. Major Areas Inspected:Core Spray Booster Pump Trips,Under Voltage Relay Failure,Monthly Surveillance Observations, Emergency Svc Water Pump Operability & Oyster Creek Drawing IR 05000219/19890111989-07-25025 July 1989 Insp Rept 50-219/89-11 on 890606-08.Major Areas Inspected: Emergency Preparedness Insp of full-participation Exercise of Licensee Emergency Plan Conducted on 890607.Exercise Did Not Meet Requirements for Annual Test of Emergency Plan IR 05000219/19890121989-07-21021 July 1989 Insp Rept 50-219/89-12 on 890430-0603.Violations Noted.Major Areas Inspected:Plant Operational Events Including Three Reactor Startups & Licensee Corrective Actions Re Reactor Coolant Pressure Boundary Hangers Being Pinned 1999-03-04
[Table view] Category:UTILITY
MONTHYEARIR 05000219/19900201990-11-0202 November 1990 Insp Rept 50-219/90-20 on 901022-26.No Violations Noted. Major Areas Inspected:Internal Exposure Control & Review of Procedures for Drywell Occupancy During Fuel Movement IR 05000219/19900161990-10-18018 October 1990 Insp Rept 50-219/90-16 on 900823-0922.Violations Noted.Major Areas Inspected:Observation of Plant Activities,Review of Operational Events,Operation of Turbine Bldg Ventilation Sys & Walkdown of Emergency Diesel Fuel Oil Transfer Sys IR 05000219/19900111990-08-15015 August 1990 Insp Rept 50-219/90-11 on 900610-0711.Noncited Violation Noted.Major Areas Inspected:Observation & Review of Plant Operations,Review of Radiological Controls & Routine Observations of Maint Activities & Surveillance Tests ML20056A6191990-07-19019 July 1990 Insp Rept 50-219/90-09 on 900422-0609.Violations Noted. Major Areas Inspected:Observation & Review of Routine Plant Activities & Operational Events,Site Radiological Controls & Events & Observations of Corrective Maint Activities IR 05000219/19890291990-02-16016 February 1990 Insp Rept 50-219/89-29 on 891203-900106.Major Areas Inspected:Observation & Review of Plant Operational Events, Condenser Vacuum Transient,Unusual Events Due to Low Intake Water Level & Simultaneous Movement of Two Control Rods IR 05000219/19890181989-09-13013 September 1989 Insp Rept 50-219/89-18 on 890724-28.No Violations Noted. Major Areas Inspected:Review of Licensee Actions on Previous NRC Concerns,Atws Rule Implementation,Procurement Control & non-licensed Operators Training IR 05000219/19890201989-09-0707 September 1989 Insp Rept 50-219/89-20 on 890829-30.No Exercise Weaknesses Noted.Major Areas Inspected:Licensee Emergency Preparedness Exercise Conducted on 890829-30 ML20246J6261989-08-18018 August 1989 Insp Rept 50-219/89-16 on 890702-29.Violations Noted.Major Areas Inspected:Plant Operational Events,Control of High Radiation Areas,Evaluation of Plant Operation W/High Canal Water Temps & Security Response to Vital Area Door Problem IR 05000219/19890191989-08-15015 August 1989 Insp Rept 50-219/89-19 on 890802-04.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys & Transportation Programs,Including Mgt Controls,Audits,Qa & Implementation of Subj Programs IR 05000219/19890151989-08-0909 August 1989 Insp Rept 50-219/89-15 on 890627-30.No Violations Noted. Major Areas Inspected:Organization & Qualifications of Radiological Controls Personnel in Site Organization IR 05000219/19890141989-08-0303 August 1989 Insp Rept 50-219/89-14 on 890604-0701.No Violations Noted. Major Areas Inspected:Core Spray Booster Pump Trips,Under Voltage Relay Failure,Monthly Surveillance Observations, Emergency Svc Water Pump Operability & Oyster Creek Drawing IR 05000219/19890111989-07-25025 July 1989 Insp Rept 50-219/89-11 on 890606-08.Major Areas Inspected: Emergency Preparedness Insp of full-participation Exercise of Licensee Emergency Plan Conducted on 890607.Exercise Did Not Meet Requirements for Annual Test of Emergency Plan IR 05000219/19890131989-06-15015 June 1989 Insp Rept 50-219/89-13 on 890522-26.No Violations Noted. Major Areas Inspected:Licensee Liquid & Gaseous Radioactive Effluent Control Programs & Radiological Environ Monitoring Program IR 05000219/19890101989-05-24024 May 1989 Insp Rept 50-219/89-10 on 890402-29.No Violations Noted. Major Areas Inspected:Action of Plant Deficiencies Discovered During Startup,Instrument Air Sys Problems, Surveillance Testing & Control Rod Scram Timing Testing IR 05000219/19890071989-05-17017 May 1989 Insp Rept 50-219/89-07 on 890226-0401.No Violations Noted. Major Areas Inspected:Activities in Progress at Completion of Outage,In Preparation for Startup & Plant Startup Activities IR 05000219/19890061989-05-10010 May 1989 Insp Repts 50-219/89-06 on 890217-24.Violations Noted.Major Areas Inspected:Review of Preliminary Safety Concern Process Including Concerns Involving Standby Gas Treatment Sys, Automatic Depressurization Sys & Containment Spray Sys IR 05000219/19890081989-04-28028 April 1989 Insp Rept 50-219/89-08 on 890313-17.No Violations Noted. Major Areas Inspected:Implementation of Relief & Safety Valve Position Indication Sections of NUREG-0737 & Procedures Re Handling of Emergency Diesel Generator Fuel IR 05000219/19890041989-04-14014 April 1989 Insp Rept 50-219/89-04 on 890115-0225.Violations Noted.Major Areas Inspected:Activities in Progress,Including Air Accumulator Testing,Environ Qualification,Reactor Pressure Vessel Testing,Operations & Physical Security IR 05000219/19882031989-03-13013 March 1989 SSOMI Rept 50-219/88-203 on 881128-1216.Major Areas Inspected:Adequacy of Licensee Mgt & Control of Mods Performed During Major Plant Outage & to Identify Strengths & Weaknesses in Licensee Mod Programs ML20236A5571989-03-0303 March 1989 Safety Insp Rept 50-219/89-03 on 890117-20.No Violations, Deviations or Unresolved Items Noted.Major Areas Inspected: Licensee Emergency Preparedness Program ML20245H9681989-02-21021 February 1989 Insp Rept 50-219/88-38 on 881204-890114.No Violations Noted. Unresolved Items Observed.Major Areas Inspected:Maint & Surveillance Activities,Radiation Control & Physical Security,Including Security Events Re Unauthorized Entry ML20235H2681989-02-0303 February 1989 Insp Rept 50-219/89-02 on 890117-20.Violations Noted.Major Areas Inspected:Licensee Activity Re Info Notice 86-053 (Raychem Splices) IR 05000219/19880311988-11-29029 November 1988 Insp Rept 50-219/88-31 on 881003-07,20 & 1031-1104. Violations Noted.Major Areas Inspected:Status of Outstanding Items,Radiological Controls Re 12R Refueling Outage & Review of Circumstances Concerning Radioactive Spill Incident IR 05000219/19880321988-11-28028 November 1988 Insp Rept 50-219/88-32 on 881017-21.Violation Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits, Protected & Vital Area Physical Barriers,Access Control, Detection & Assessment Aids,Testing & Maint & Power Supply IR 05000219/19880281988-11-15015 November 1988 Insp Rept 50-219/88-28 on 880911-1004 & 1014-29.Apparent Violation Noted.Major Areas Inspected:Activities in Progress,Including Plant Operations,Radiation Control, Physical Security,Maint & Forced Shutdown Activities ML20206D0131988-11-0101 November 1988 Environ Qualification Enforcement Conference Rept 50-219/85-39 on 881020.Major Areas Discussed:Significance of Concerns Re Environ Qualification of PVC Tape Splices & Limit Switches Associated W/Msivs.Related Info Encl ML20205P6101988-10-31031 October 1988 Insp Rept 50-219/88-30 on 880929.Notice of Violation Withdrawn.Major Areas Inspected:Emergency Preparedness Activities Re Licensee Response to Notice of Violation & Inspector Followup Items IR 05000219/19880801988-10-28028 October 1988 Augmented Insp Team Rept 50-219/88-80 on 881005-13.Major Areas Inspected:Circumstances Surrounding Steaming Phenomenon on Both Isolation Condensers in Late Aug & Sept 1988 & Electrical Fault on Diesel Generator 2 on 881002 IR 05000219/19880291988-10-22022 October 1988 Insp Rept 50-219/88-29 on 880914-15.App R Violation Re High & Low Pressure Interface During Design Basis Fire Which Could Cause Loss of Reactor Coolant Noted.Major Areas Inspected:Interviews W/Personnel & Inspector Observations ML20205J7301988-10-11011 October 1988 Insp Rept 50-219/88-26 on 880909 & 0912-15.No Violations Noted.Major Areas Inspected:Licensee Inservice Insp Program to Ascertain That Program Complies W/Applicable ASME Code & Regulatory Requirements & Response to Generic Ltr 88-01 ML20207N2331988-10-0404 October 1988 Insp Rept 50-219/88-25 on 880829-0902.No Violations Noted. Major Areas Inspected:Licensee Actions in Response to NRC Bulletins 79-02 & 79-14,Deficiencies Noted in Some Pipe Support & Pipe Support Base Plates IR 05000219/19880231988-09-27027 September 1988 Insp Rept 50-219/88-23 on 880731-0910.Violation Noted. Major Areas Inspected:Plant Operations & Startup,Radiation Control,Physical Security,Maint & Forced Shutdown Work Activities & Isolation Condenser Sys Operability IR 05000219/19880241988-09-0909 September 1988 Insp Rept 50-219/88-24 on 880715 & 18-0812.No Violation Noted.Unresolved Item Identified.Major Areas Inspected: Failure of MSIV NS03A Stem,Including Sequence of Events, Maint & Surveillance Test History & Stem Matl ML20151Y3081988-08-15015 August 1988 Insp Rept 50-219/88-15 on 880523-0726.Violations Noted. Major Areas Inspected:Licensee Action in Response to Mark I Containment Mod Requirements of NUREG-0661,review of Design Analyses & Plant Unigue Analysis Rept IR 05000219/19880221988-08-12012 August 1988 Insp Rept 50-219/88-22 on 880718-22.No Violations Noted. Major Areas Inspected:Gaseous & Liquid Radioactive Effluent Control Programs,Licensee Action on Previous Insp Findings, Effluents,Instrumentation,Audits & Air Cleaning Sys IR 05000219/19880171988-07-26026 July 1988 Insp Rept 50-219/88-17 on 880613-17.No Violations Noted. Major Areas Inspected:Previously Identified Findings,Spds & Planned Mods to Institute Corrective Measures to Satisfy ATWS IR 05000219/19880181988-07-11011 July 1988 Mgt Meeting Rept 50-219/88-18 on 880609.Major Areas Discussed:Status of Licensee Action/Plans & Schedules for Work Per IE Bulletins 79-02 & 79-14 IR 05000219/19880121988-07-0808 July 1988 Insp Rept 50-219/88-12 on 880425-29.No Violations Noted. Major Areas Inspected:Review of Licensee Program Implementation of 10CFR21 Regulation & Review of Station Procurement Program IR 05000219/19880051988-06-30030 June 1988 Insp Rept 50-219/88-05 on 880511-12.No Violations Noted. Major Areas Inspected:Emergency Exercise Conducted on 880511-12 IR 05000219/19880141988-06-27027 June 1988 Insp Rept 50-219/88-14 on 880516-20.Violation Noted.Major Areas Inspected:Selected Areas of Fire Protection & Electric Power Sys,Including Reviews of Administrative Control, Surveillance & Fire Brigade Procedures IR 05000219/19880131988-06-14014 June 1988 Insp Rept 50-219/88-13 on 880424-0521.One Violation Noted. Major Areas Inspected:Plant Operations,Physical Security, Radiation Control,Housekeeping,Fire Protection & Emergency Preparedness & Annual Emergency Exercise Participation IR 05000219/19880091988-05-26026 May 1988 Insp Rept 50-219/88-09 on 880320-0423.No Violations Noted. Major Areas Inspected:Plant Operations,Radiation Control, Physical Security,Surveillance,Maint & Environ Qualification Files for Reactor Vessel Pressure Switches IR 05000219/19880111988-05-11011 May 1988 Safety Insp Rept 50-219/88-11 on 880411-15.Violations Noted. Major Areas Inspected:Status of Items Identified During 1987 Integrated Performance Assessment Team Insp & Status of Measures to Control Drywell Access IR 05000219/19880041988-05-0606 May 1988 Insp Rept 50-219/88-04 on 880207-0319.Violations Noted.Major Areas Inspected:Activities in Progress,Including Plant Operation,Physical Security,Radiation Control,Housekeeping, Fire Protection & Emergency Preparedness ML20153D8181988-04-29029 April 1988 Insp Rept 50-219/88-06 on 880222-26.Violation Noted.Major Areas Inspected:Emergency Implementing Procedures & Plans, Emergency Facilities,Equipment,Instrumentation & Supplies & Application of IE Info Notices 83-28 & 84-80 IR 05000219/19880081988-04-29029 April 1988 Mgt Meeting Rept 50-219/88-08 on 880308.Major Areas Discussed:Licensee Activities Re NRC Bulletins 79-02 & 79-14.Licensee Presentation Encl IR 05000219/19870421988-03-14014 March 1988 Insp Rept 50-219/87-42 on 871220-880206.No Violations Noted. Major Areas Inspected:Activities in Progress,Including Operations,Radiation Control,Physical Security,Surveillance & Maint IR 05000219/19880021988-02-29029 February 1988 Insp Rept 50-219/88-02 on 880125-29.Violations Noted.Major Areas Inspected:Safety Implications of Freezing Conditions Identified in Reactor Bldg on 880106 & Effectivness of Licensee Corrective Measures IR 05000219/19880011988-02-19019 February 1988 Insp Rept 50-219/88-01 on 880104-08.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previously Identified NRC Concerns,Util Offsite Review Committee & Organization & Administration & QA Audits IR 05000219/19870401988-01-21021 January 1988 Physical Security Insp Rept 50-219/87-40 on 871106.No Violations Noted.Major Areas Inspected:Three Allegations Re Deficiencies in Security Program.Allegations Were Not Substantiated 1990-08-15
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999 PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power IR 05000219/19980121999-03-0404 March 1999 Insp Rept 50-219/98-12 During Periods 981214-18,990106-07 & 20-22.No Violations Identified.Major Areas Inspected: Review of Licensee self-assessment of Plant Environ Qualification Program & Corrective Actions for Open Items IR 05000219/19980091998-11-25025 November 1998 Insp Rept 50-219/98-09 on 980914-1025.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20196C6071998-11-25025 November 1998 Notice of Violation from Insp on 980914-1025.Violation Noted:On 981014,security Force Vehicle Escort Left Non licensee-designated Vehicle Unattended in Protected Area & Failed to Ensure That Vehicle Ignition Locked & Key Removed IR 05000219/19980081998-10-20020 October 1998 Insp Rept 50-219/98-08 on 980727-0913.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19980051998-08-26026 August 1998 Insp Rept 50-219/98-05 on 980614-0726.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000219/19980991998-07-17017 July 1998 SALP Rept 50-219/98-99 for 961201-980613 IR 05000219/19980071998-07-0202 July 1998 Insp Rept 50-219/98-07 on 980615-19.No Violations Noted. Major Areas Inspected:Status of Plant motor-operated Valve Program to Determine Acceptability for Closure of NRC Review Under GL 89-10 ML20249B3661998-06-15015 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Prior to 980304, Licensee Failed to Establish Adequate Design Control Measures to Verify Adequacy of Design Voltage ML20237E4491998-06-10010 June 1998 EN-98-047:on 980615,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Involving Inoperability of Three of Five Automatic Depressurization Valves ML20217F6641998-04-22022 April 1998 Insp Rept 50-219/98-80 on 980223-0313 & 0330-0402.Violations Noted.Major Areas Inspected:Engineering ML20217F6491998-04-22022 April 1998 Notice of Violation from Insp on 980223-0313 & 0330-0402. Violations Noted:On 980226,seismic Deficiency W/Containment Spray Heat Exchanger,That Had Been Identified in Late 1996 by Licensee,Had Not Been Adequately Corrected ML20216H1911998-04-15015 April 1998 Insp Rept 50-219/98-04 on 980226-0318.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20216H1701998-04-15015 April 1998 Notice of Violation from Insp on 980226-0318.Violations Noted:Since Initial Plant Operation,Operators Implemented Procedure 307,isolation Condenser Sys,Permitting Fill & Make Up to Isolation Condensers During Normal Plant Operations ML20216J0181998-04-14014 April 1998 Notice of Violation from Insp on 971229-980208.Violation Noted:Written SE Was Not Performed to Provide Bases for Determination That Change in Facility as Described in SAR Did Not Involve USQ IR 05000219/19970081997-12-0404 December 1997 Insp Rept 50-219/97-08 on 971020-24.No Violations Noted. Major Areas Inspected:Onsite Emergency Plan ML20199G7881997-11-17017 November 1997 Notice of Violation from Insp on 970707-970824.Violation Noted:In Oct 1993,vendor Specification for Emergency Svc Water Pump Bowl Assemblies Was Changed from Cast Iron to Stainless Steel PNO-I-97-045, on 970801,electricians Restoring One Set of Main Generator Exciter Brushes,Following Routine Surveillance,When One of Brushes Sparked Excessively & Disintegrated.Electricians Exited Area & Notified CR1997-08-0404 August 1997 PNO-I-97-045:on 970801,electricians Restoring One Set of Main Generator Exciter Brushes,Following Routine Surveillance,When One of Brushes Sparked Excessively & Disintegrated.Electricians Exited Area & Notified CR IR 05000219/19970041997-07-29029 July 1997 Insp Rept 50-219/97-04 on 970526-0706.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000219/19970051997-07-17017 July 1997 Insp Rept 50-219/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Engineering ML20141G9431997-07-0303 July 1997 Insp Rept 50-219/97-03 on 970414-0525.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20141G9401997-07-0303 July 1997 Notice of Violation from Insp on 970414-0525.Violation Noted:On 970423,CROs Placed a & B Loops of Shutdown Cooling Sys in Svc W/O Placing Suction Pressure Interlocks in Svc for a & B Pumps by Opening Ps Isolation Valves IR 05000219/19970021997-05-19019 May 1997 Insp Rept 50-219/97-02 on 970224-0413.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20141J5221997-05-19019 May 1997 Notice of Violation from Insp on 970224-0413.Violation Noted:Permanent Change,Dec 95,made to Facility,As Described in SAR Involving Removal of Isolation Condenser Radiation Monitors W/O Considering All Relevant Portions of SAR PNO-I-97-024, on 970422,Oyster Creek Nuclear Generating Station Commenced Controlled Shutdown of Unit Due to Equipment Problems.Unit Expected to Be Shut Down for Six Days for Correction of Diaphram Problem1997-04-23023 April 1997 PNO-I-97-024:on 970422,Oyster Creek Nuclear Generating Station Commenced Controlled Shutdown of Unit Due to Equipment Problems.Unit Expected to Be Shut Down for Six Days for Correction of Diaphram Problem PNO-I-97-022, on 970410,GPU,Inc Announced,Addition to Continued Operation of Oyster Creek & Also Exploring Options of Sale.Util Will Begin Next Wk to Develop Plans to Support Sale of Plant,Decommissioning & Personnel Retention1997-04-10010 April 1997 PNO-I-97-022:on 970410,GPU,Inc Announced,Addition to Continued Operation of Oyster Creek & Also Exploring Options of Sale.Util Will Begin Next Wk to Develop Plans to Support Sale of Plant,Decommissioning & Personnel Retention ML20137E9411997-03-21021 March 1997 Notice of Violation from Insp on 970113-0223.Violation Noted:Procedure 108.7, Lockout/Tagout Procedure, Rev 4, Did Not Include Appropriate Quantitative or Qualitative Acceptance Criteria ML20137E9491997-03-21021 March 1997 Insp Rept 50-219/97-01 on 970113-0223.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19960991997-01-0909 January 1997 SALP Rept 50-219/96-99 for Oyster Creek Nuclear Generating Station for 950625-961130 ML20133D6781997-01-0202 January 1997 Notice of Violation from Insp on 961021-1201.Violation Noted:Written Safety Evaluation Was Not Performed to Provide Bases for Determination That Change to Station Procedure 336.3 Did Not Involve Unreviewed Safety Question PNO-I-96-078, on 961025,licensee Manually Scrammed Reactor Due to Turbine Runback,Resulted from Problem in Stator Cooling Sys.Resident Will Continue to Follow Event1996-10-29029 October 1996 PNO-I-96-078:on 961025,licensee Manually Scrammed Reactor Due to Turbine Runback,Resulted from Problem in Stator Cooling Sys.Resident Will Continue to Follow Event IR 05000219/19960101996-09-27027 September 1996 Insp Rept 50-219/96-10 on 960923-27.No Violations Noted. Major Areas Inspected:Radiological Source Term Assessment, Results of Exposure Reduction Initiatives & Evidence of Station ALARA Program IR 05000219/19960111996-01-0202 January 1996 Insp Rept 50-219/96-11 on 961021-1201.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19920991994-01-26026 January 1994 SALP Rept 50-219/92-99 for Period 920719-931211 ML20059B6331993-12-23023 December 1993 Notice of Violation from Insp on 930927-1015.Violation Noted:All NRC Violations & Ten Licensee Event Repts Issued in 1992 & 1993 Did Not Receive Required Independent Safety Reviews IR 05000219/19930811993-12-22022 December 1993 Insp Rept 50-219/93-81 on 930927-1015.Violations Noted.Major Areas Inspected:Engineering,Maint,Surveillance & Mgt & Corrective Actions IR 05000219/19930261993-11-18018 November 1993 Insp Rept 50-219/93-26 on 931101-05.No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Access Control of Personnel & Packages & Vehicles IR 05000219/19930241993-11-18018 November 1993 Insp Rept 50-219/93-24 on 930921-1101.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering,Plant Support,Including Security & Emergency Preparedness & Safety Assessment/Quality Verification ML20058A3791993-11-12012 November 1993 Insp Rept 50-219/93-23 on 931018-20.Onsite Response to Exercise Scenario Was Good.Major Areas inspected:full- Participation Ingestion Pathway Emergency Preparedness Exercise ML20059M3211993-11-0909 November 1993 EN-93-081A:on 930812,notice of Proposed Imposition of Civil Penalty in Amount of $75,000 Issued to Licensee.Action Based on Five Radiological Controls Violations IR 05000219/19930251993-11-0909 November 1993 Insp Rept 50-219/93-25 on 931018-22.No Violations Noted. Major Areas Inspected:Design Mods & Engineering Support ML20059F6251993-10-28028 October 1993 Insp Rept 50-219/93-22 on 930920-24.No Violations Noted. Major Areas Inspected:Addressed Open Items Associated W/Eop & Reviewed Licensee Actions in Response to Violations Associated W/Recirculation Loop Isolation Event IR 05000219/19930181993-10-28028 October 1993 Insp Rept 50-219/93-18 on 930823-1020.No Violations Noted. Major Areas Inspected:Alara,Rirs,Qa Audits,Air & Swipe Sample Counting Facilities & Radiological Controls Organization Professional Staffing IR 05000219/19930201993-10-19019 October 1993 Insp Rept 50-219/93-20 on 930816-930917.No Violations Noted. Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs Including Mgt Controls & QA Audits IR 05000219/19930211993-10-15015 October 1993 Insp Rept 50-219/93-21 on 930810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Safety Assessment/Quality Verification ML20059A2201993-10-15015 October 1993 Notice of Violation from Insp on 920719-0825.Violation Noted:Licensee Determined That Records Required to Be Maintained by Commission Regulations or License Conditions Not Complete & Accurate in All Matl Respects IR 05000219/19930171993-09-14014 September 1993 Exam Rept 50-219/93-17OL on 930810-12.Exam Results:All 16 Licensed Operators Passed All Portions of Exam That Was Administered & All Three Crews Performed Satisfactorily in Simulator ML20149D5021993-09-13013 September 1993 Notice of Violation from Insp on 930629-0809.Violation Noted:On 930709,NRC Identified Condition Adverse to Quality That Had Existed Since 920709 IR 05000219/19930111993-09-10010 September 1993 Insp Rept 50-219/93-11 on 930629-0809.No Violations Noted. Major Areas Inspected:Day Shift & Back Shift Hours of Station Activities ML20149D7051993-09-10010 September 1993 Notice of Violation from Insp on 930816-20.Violation Noted: as of 930820,appropriate Measures Were Not Established to Assure Adequate Quality Was Suitably Included in Documents for Procurement of Svcs 1999-09-16
[Table view] |
Text
.
.
. .
.
U. S. REGULATORY COMMISSION
REGION I
Report N /89-03 Docket N License N DPR-16 Priority -- Category C Licensee: GPU Nuclear Corporation P~ 0. Box 388 Forked River, New Jersey 08731-0388 Facility Name: Oyster Creek Nuclear Generating Station Inspection at: Berkeley Townshia Forked River, Harvey Cedars, Lacey lownship and Toms River, New Jersey Inspection Conducted: January 17-20, 1989 Inspectors: (7 M, M ~ #4,/7///f C. G. Amato, Amergency Preparedness Specialist, date '
Emergency Preparedness Section, FRSSB, DRSS C. Z. Gordon, Emergency Preparedness Specialist, Emergency Preparedness Section, FRSSB, DRSS Approved By: / , WW 4r yazartis) chier, tmergency Preparedness c5date 3 f7 Sect 4 n, FR558, DRSS Inspection Summary: Inspection on January 17-20, 1989 (Inspection Report N F-2T978923)
Areas Inspected: Routine, announced, safety inspection of the licensee's emergency preparedness program conducted on January 17-20, 198 Results: No violations, deviations or unresolved items were identifie ?03170431 sco3ag h'DR ADOO: 03< ico 219 PDC
- _ .
- - - . -- _ _
'
m
-
DETAILS 1.0 Persons Contacted The following GPU Nuclear Corporation personnel were contacte ** R. Barrett, Director, J. Barton, Plant Operations,k Deputy Director, DivisionOyster Creek Division Oyster Cree
- T. Blount, Lead Emergency Planner, Emergency Planning Section
- J. Bontempo, Lead Emergency Planner, Emergency Planning Section ( * K. Burkholder, Emergency Planner, Emerge:.cy Planning Section
- B. DeMerchant, Licensing Engineer, Plant and Nuclear Safety Department W. Duda, Project Engineer, OC Engineering Projects, Technical Functions Division
- R. Fenti, Manager, QA, Modifications and Operations Department E. Fitzpatrick, Vice President GPU Nuclear Corporation and Director OysterCreekDivision
- ' Kowalski, Manager, Plant Training Department, Training Division
- D. Mac Farlene, Oyster Creek Site Audit Manager, Quality Assurance Division S. Polon, Manager, Public Information Department, Communication Division
- D. Ranft M J. Sevilla,anager, Plant EngineeringSergeant, Oyster Creek Site Security Section M. Slobodien, Director, Radiation Controls Division R. Stintzcum, Site Security Manager, Oyster Creek D. Wiegle, Sr. Environmental Engineer, Environmental Controls Section l
- J. Williams, Maintenance / Support Training Section Manager Site TrainingSection,TrainingandEducationDivision
- K. Wolf, Radiological Engineering Section, Manager
- Denotes licensee personnel who attended the exit meetin The inspectors also observed the actions of, and interviewed other licensee personne .0 Licensee Action On Previously Identified Items The following items were identified during previous inspection Based upon observations, review of procedures and discussions with licensee personnel by the inspectors, the following inspector follow up items are close (CLOSED) (50-219/88-05-07) Radio communications capability and radio net control used by security should be reviewed. Channel avail ability and radio net control were reviewed and determined to be adequat (CLOSED A discrepancy may exist between the Emergenc)y(50-219/88-05-08) Plan, it's Implementing Procedures and the site Contingency Plan resulting in possible delayed updating of the NRC l i
i
!
- _ _ _ -_--____--___ - _ - _ _ _ _ _ _ _ . . :
_ __ - - _ _ . _ __ . _ _ _ ._
_ _ _____ _ _ __ __
.
.
. .
.
I i
as to the progress of security event Plans and Procedures as well 1 as coordination meetings between Security and the Emergency Preparedness Section staffs ensures procedures are in place and l understood ensuring timely NRC update l (CLOSED) (50-219/88-05-10 An inconsistency may exist within emergency classification p)rocedures with respect to the classification of security events. Revision 5 to classification
procedure 9473-IMP 1300.01 states the bases for classifying ;
security event (CLOSED) (50-219/88-06-01) Three areas in emergency preparedness training require improvement. A computerized data base for tracking i emergency training status is functional and in use, the number of rescheduled emergency preparedness training sessions has been significantly reduced. Emergency Directors and Emergency Director Assistants are trained in core damage mitigatio i 3.0 The Emergency Preparedness Organization To determine if the licensee has developed, maintains and implements an emergency preparedness program (EPP which meets the standards of 10 CFR 50).47(b) and Section IV ofrequired by Appendix E to 10 CFR 50, or personnel were interviewed,ganizational structure and EPP activities werewas studied, identified, j 3.1 The EPP was transferred to the Radiological and Environmental Controls (R&EC) Division during 1988 and the present Divisional Director-Vice President a) pointed October 1988. He devotes about 20% of his time to EPP activities and regularly briefs the GPUNC President about emergency preparedness. The President is a qualified OC Alternate Emergency Support Directo .2 EPP operations are assigned to a Department; The Department office is staffed by a manager and three emergency planners. OC EPP responsibilities are assigned to a section staffed by a i manager and four professionals with backgrounds in nuclear engineering, health physics and reactor operations. A senior off site emergency planner located at the OC EP Section office i reports to the Emergency Preparedness Department manage .3 Each OC EPP Section member is assigned lead responsibility for !
one of four on going activity areas which encompass over thirty l activities including 12 special project and 20 improvement activities. The EP Secti u Manager maintains close liaison with the Deputy Director of the OC Division and the OC Training Sectio Based on the above findings, this portion of the licensee's emergency plan is acceptabl _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ]
- _ _ ___ _ _
.
.
..
.
i 4.0 Emergency Preparedness Training (EPT)
.
In order to determine if emer !
compliance with 10 CFR 50.47(gency preparedrass training is inb)(15) and Sj to 10 CFR 50, the inspector reviewed EPT activities, trainin ;
records, lesson plans, Emergency Response Organization (ERO)g qualification roster, and the training matrix, and interviewed :
Training Section staf .1 The OC Section of GPUNC's Training and Education Department (TED is responsible for EPT. EP Table 23 correlates EPT scope with)emerc ency response organization (ERO) positions. EPT reflects ;ob task analysis and is performance based. Various training modalities are used including classroom instruction and drills. Attendance is checked and where feasible numerical grades are assigned. Three new a introduced. One is a programmed,pproaches have been self paced sequence and or will be another makes use of audio cassettes followed by an open book examination. These innovative approaches are currently limited and do not cover all of EPT. Weekly training drills will begin in the near futur i 1 on shift; 2 initial 4.2 The ERO is and response: divided into three groups: Training matr)icas have bee)n 3 suppor developed for eac)h group. Lessons plans are current and attendance is tracked using a computerized data base. About ;
300 Oyster Creek staff are currently qualified including alternates. At least three personnel are qualified for each ERO position. The need to reschedule EPT has been reduced to one rescheduling within a year as a result of an OC Director i
'
golicy requiring his office to be notified whenever there is a no show".
4.3 Accident Management Training (AMT) is given by another TED !
section and an OC unit including trainia l Assessment, and Core Damage Mitigation. g in Core DamagePlant Engi Department personnel are trained in Systems Engineering including systems classified as engineered safety feature Senior reactor operators now assigned to the TSC fill various positions. The licensee plans to classify currently or formerly licensed senior operators assigned to the TSC as Emergency Director Assistants, establish a fourth duty roster i and provide required training. Severe accident a..alysis training is not given to engineers assigned to the TS .5 Licensed operators receive four hours of EPT which includes classification, notification procedures and Protective Action Recommendations.OnsimulatortrainingIsnotyetprovided.The on site OC simulator will include, upon completion a complete and functional replica of Emergency Command Center communication system This will permit hands on training and conduct of drills and exercises from the simulato Based on the above findings, this portion of the licensee's emergen-cy preparedness / training program is acceptabl i i
--m___ _ _.____ ._ _
. _ _ _ _ -- _ _ .
,
-. '
'
'
I'
, , LR . ']
5 j
- . .
5 , >
' j 5.0- Audit / Review An inde)endent' audit / review is required at least every twelve months by 10 C:R 50.54Lt) including determination of adequacy of the
' licensee / Stater.ocal government interface and availability of the
.
results of this study to State / local government (s). To ascertain if-l these requirements are met, the Quality Assurance evaluation report -
i for the OC. Emergency Pre correspondence checked. paredness-Program (EPP) was reviewed and
,
5.1 The OC Site Audit Section undertook the required audit.from January to March 1988 using GPUNC Quality Assurance Procedures (QAP those). The audit noted above.encompassed ten-EPP
- The OC Director hasactivities including established a policy callin chair.g for weekly QA meetings whichand he recommendations or the Deputy Director Resolution of all QA findings is
. required before an audit report may be tabled at a weekly QA meetin Findings 5.2 Results of the EPP recommendations audit were were' satisfactory. interface adequacy was .and resolved evaluated, and report copies w,ere sent to the New Jersey State and Ocean County.0ffices of Emergency Managemen .3 The entrance meeting for the 1989 audit was hcid during the inspection period and was attended by the inspectors. Audit plan references were complete and a matrix was develope For the first time, two members of the audit' team, at the suggestion of the Oyster Creek EPP manager, were drawn from another nuclear utilit Based on the above findings, this portion of the licensee's emergency preparedness / audit program is acceptabl ,
6.0 Plans and Procedures Plans and Procedures' were reviewed to determine if they meet the requirements of 10 CFR 50.47(b)(16) and 50.54(q), and Section IV G of Appendix E to 10 CFR 5 .1 The EP was revised by GPUNC to reflect the altered status of THI Unit 2 and submitted to NRC for review. GPUNC res)onded to NRC concerns and the EP was reissued as Revision 1. Tie EP required changes to OC EPIP 9473-lMP-1300.02, Exhibit 2,
" Direction of Emergency Response". The revision wa; made and the EP and EPIP agree with respect to Protective Action Recom-mendation developmen .2 EPs and EPIPs in each Emergency Response Facility were surveye to find out if the current and correct PAR logic diagram was inserted. Results indicated current EPs and EPIPs were in place and contained the current PAR logic diagra !
_ _ _ _ _ _ - -_
l
,f . .,
1:
p: a . . g y 3 l
k' 6.3 Section 2.2.2 of the EP identifies related Plans and Procedures
,
and their coordination with the EPIPs. These plans and proce-for example, the Site Security Flan Emergency Operation Proce duresinclude,dures-(EOPs)fandtheEmergencyPub1I tion Plan.. E0Ps contain re errals to Emergency Action Level .
(EAL) classification A sampling check indicated the other procedures, procedures.as appropriate, were availabl Based on the above findings, this portion of the licensee's emergen-cy preparedness program is acceptabl . Emergency Response Facilities The inspector conducted an tour of the Emergency Response Facilities (ERFs 50.47)bto determine if they and-(b)(9), meetIV Section the of requirements Appendix E.toof10 10CFR CFR50,
' Supple (me)n(8)1 t to NUREG0737 and Regulatory Guide 1.97. Equipment, status boards, communications systems, plans, procedures and access ;
control provisions were checked for the Emerg ncy Command Center
'
(ECC), the Emergency Operations Facility (E0F , the Technical Support Center (TSC) and a support facility, he Remote Assembly Area (RAA).
7.1 The ECC is within the the Control Room area. The ECC is
.' equipped with meteorological, radiological and plant system parameter readouts in acdition to access to all plant communi-cation systems'. The ECC was maintained-in a state of readines .2 The Technical Support Center (TSC) is located within the protected area. Status boards, maps wall boards, plans,-
proceduresandequipmentweremaintaInedinastateofreadi-nes Provision has been made to project real time data from the plant com System (SPDS)puter' including the Safety Parameter DisplayThis capa
.
meteorological variables.specified in Regulatory Guide 1.97.
>
Plant records, drawings etc. are also available. Thirteen communication systems link the TSC with other ERFs and off site >
'
entities including NRC's Health Physics Network (HPN) phones which were functiona .3 The Emergency Operations Facility (EOF) is a non-dedicated facility located within the auditorium of a Jersey Central Power & Light business office 19 miles from the sit Provision has been made for the projection-of real time data from the plant computer system. Recent upgrades to.the
-
facility have been made - the Emergency Support Director's (ESD) Office has been enlarged and the Environmental Assessment Command Center where projected ' doses are calculated has been !
moved to a room providing more space. A communicator's room will also be provided. Provision has been made for an NRC office and conference room. Space is provided for personnel of the New Jersey Bureau of Nuclear Engineering. Fifteen communication systems tie the E0F to other ERFs and off site emergency response centers. Both HPN phones were operative. A
!
J
- _ _ _ _ _ _ _ _ _ - _ _ - _ _ - _ _ - _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ -. _ . _ _ _ _ _ _ _ _ - -
'
, ,
,.e .
. . .
.' l
'
i
'
. ;
Certificate of Occupancy has been issued for the building !
housing the E0 .j e 7.4 The' Remote Assembly Area (RAA) is equipped with monitoring.and !
decontamination equipment and a-security phone. Space is-adequatetoaccommodateslteevacuees. Signs directing evacuees to the RAA and the RAA assembly area are in plac Based on the above findings, this portion of the licensee's emergen-cy plan is acceptabl .0 Emergency Action Levels (EAls)
To determine if the EALs meet the standard of 10 CFR 50.47(b)(4),
the requirements of Section IV B of' Appendix E to 10 CFR 50, the
'
guidance of NRC Office of Inspection and Enforcement Information Notice No.' 28 of 1983 (I&E IN 83-28), and Planning Standard D and Appendix 1 to NUREG-0654, Rev. 1, EALs were reviewed and discussed with EPP personne " Classification of Revision Emer ency5 Conditions" of procedure 9473-IMP-1300.01,he was compared with t standard, requirements and uidance. Classification is based on events, defined. Guidancesymptoms, brea barr ers and projected doses. Barrier breech is of I&E IN 83-28 is applied. EALs were sent to the New Jersey Office of Emergency Management; the licensee plans to meet with representatives from the New Jersey Bureau of Nuclear Engineering to-discuss the EAL Based on the above findings, this portion of the licensee's emergen-cy plan is acceptabl .0 Protective Action Recommendations (PARS)
The standard and requirements for PARS are given in 10 CFR 5 b 10
'47(da)n(ce)is gui found in I&E IN 83-28 and. Planning Standard J ofand Section I NUREG-0654, Rev. To determine if the standard and requirement are met and PARS are consistent with federal guidance, PARS were !
r reviewed, and discussed with licensee's staff I PARS are based on Figure 24 of the GPUNC EP and Exhibit 2 of the OC classification procedure. The licensee advised the N.J. Office of !
Emergency Management of the revised PAR logic diagram during August 1988, i Based on the above findings, this portion of the licensee's emergen-cy plan is acceptabl I i
I I
_ : _- __ - ._._-_-. - _ _ _ - - - - .
. - _ _ _ _ _
. !
.
8 3
.
10.0 Notification an ' " communications
'
Communications . ,cems were checked to ascertain if the requirements of 10 CFR 50.47(b)(5 and (b Sections IV D.1 and IV E. 9 of AppendixEto10CFR)50,and){6),IN86-97wereme i&E 10.1 Sixteen communication systems were identified. These systems include independent, redundant and diverse capability. Ten phones are provided at the E0F for N.J's Bureau of Nuclear '
Engineering. Operability was checked on a sampling basis and found to be satisfactor I 10.2 Emergency duty roster personnel are called in using an automated system consisting of a commercial pager system and verification system. Site Security activates both system The verification system checks call backs and in the event an acknowledgement is not received automatic. ally goes down the roster until the position is filled or the list is exhauste The inspector observed a drill and concluded the system was !
rapid and effectiv I
\
Based on the above findings, this portion of the licensee's emergen-cy preparedness plan is satisfactor .0 Public Information The Public Information Department Manager was interviewed and printed material distributed to the public studied to determine if i the requirements of 10 CFR 50.47(b)(7) and Section IV D.2 Of '
Appendix E to 10 CFR 50 are me .1 One staff member is sent to the ECC when the initial EAL is declared. Three staffers report to the E0F at the ALERT. A senior OC station engineer is assigned to the Media Center . A duty roster has been established. Monthly training is given to writers, information gatherers and technical briefers. All Media Center charts are being simplifie .2 An annual media briefing is held one week before the annual exercise. Invitations are extended to radio, television and newspaper personne .3 The public is advised as to emergency proceduras by mailed brochures, phone book inserts and newsletters. Eighty thousand brochures are sent two weeks before the annual exercise to the residents living within the ten mile Emergency Planning Zone. To to hotels, provide motels information and camp site to transients, A single pagebrocnures insert are sent appears on the inside. of the last page of the Ocecn County phone book containing a summary of essential information. The brochure is l revised annuall .4 Two quarterly newsletters are mailed, one to residents within
! the EPZ and the other to off site, governmental emergency workers. The latter newsletter is always sent three weeks before the annual exercis L____-_______________ . _ _ . _ _ _ _ _ _ _ _ _ . _ _ . _ . _ . _ _ . ._ _ _ _ _ _ _
-- .
.
.
.
l Based on the above findings, this portion of the licensee's emergen-cy plan is acceptabl I 12.0 Off Site Activities To determine if the standards of 10 CFR 50.47(b)(5) and (b)(12) and the requirements of Sections IV D.3 and IV F of Appendix E to 10 CFR 50, are wt, the lead off site emergency planner was interviewed and appropriate records reviewe .1 Off site, governmental personnel are trained by the State of New Jersey which sends an annual training certification letter to U.S. FEMA-I j
12.2 Community fire comoanies and ambulance squads were offered >
training. Three fire companies sent personnel. Emergency medical training was given by a contractor to first aid squad members during October 198 ,
12.3 A medical training session and drill were held at the primary
'
and secondary hospitals. The primary hospital medical facili- '
ties were inspected. Procedures were current, supplies met inventory listings and equipment was functional and within l calibration. Hospital staff interviewed were well versed in the procedures for treating contaminated / injured person ;
12.4 A remote verification system is being installed at all sirens )
locations. Siren freezing has not recurred following heater 1 installation. Corroded carbon steel base plates are being l replaced at 19 locations. Siren availability during 1988 was l 99.8% A letter certifyin U.S. FEMA-II by the N. J.g availability will be sent toOffice of Emergency M
,
'
12.5 Evacuation Time Estimates are being updated; the revised values should be available by iate summer 198 Based on the above findings, this portion of the licensee's emergency plan is acceptabl .0 Security-Emergency Preparedness Interface To determine if the requirements of Section II.D.59 of Appendix B to 10 CFR 73 are met, NUREG/CR3251 was consulted and security personnel were interviewe .1 Security Officers are radiation worker qualified, respirator trained and fitted. Additional training is given in Emergency Preparedness, search and accountability, and activation of the call-in pager and verification syste .
13.2 An area monitor and a continuous air monitor are located within the Main Gate House. Twenty " chirpers" stored there are l are available fcr security officer use. A Guard House evacua-tion exposure rate has been established and fall back locations
_ _ - - -_. ._ _- --
-
identified. Radiation Control support will be provided upon request. The Guard House ventilation system is not filtered and may be sealed if necessary. Anti-contamination clothing is available at the Operations Support Center (OSC). .
13.3 Security-emergency preparedness interface meetings are held, i There are provisions for Security-EP drills and the 1988 l exercise was security driven. If a security event results in l
declaration of an eat., security information is transmitted to i the Emergency Command Center which will provide the NRC with '
update Based on the above findings, this portion of the licensee's emorgency plan is acceptabl .0 Dose Assessment The standard, requirements and guidance for dose assessment are
, Sections IV B and IV E.2 of Appendix E, given Section in 10 NUREG-0654, 1.23 andII.f.1(2)
1.97 and CFR 50.47(b)(9)0737(V of NUREG-RE , Appendix 1 Supplement To determine if 1)2.,
the licensee is in compliance with these standards and guidance, facilities were inspected, records were cbcked and personnel interviewe .1 Plant releases are monitored by the radioactive gaseous i emission monitoring system (RAGEMS) at the stack base and from multiple points in the Turbine Building. RAGEMS collects particulate samples and iodines and monitors noble gas exposure rate. Both these are being upgraded during an outage and their satisfactory completion is part of the Restart Certification
.
packag .2 RAGEMS upgrades include an improved cartridge retrieval system, ,
a heat traced stack sample line and a cartridge retrieval box o
'
external to the RAGEMS stack house. Rain water had collected in the retrieval box; the licensee was aware of this and will take corrective action. Before OC restart, the Restart Certification requirements must be completed including RAGEMS detail RAGEMS items include approval of revised operating procedures, training of Chemistry Technicians in these, '
calibration, and retrieval box correction. The resident i inspector will follow up on this matte .3 There are three meteorological towert including one primary tower and two supporting towers. All are enclosed within locked fences. Only the primary tower is equipped with a backup power supply. The other towers serve as backups and provide data used to determine the presence and magnitude of a sea breeze effect. Tower sensor and associated electronic calibration records were reviewed. Calibration was current and effected using approved procedures.
_
. _ _ - .
-. , - - _ - - _ -- - - _ -_ _ _ . - _ _ _ _ _ _ _ _ _ - -
L-
.o .>
,
q .. ,
+ -
,
,
,
11, e 1
,
f-
'i
'
< m 14.4'The licensee has re' viewed the methodology for collecting. iodine' '
P
'off site and concluded the system in use should be replace .
.
The licensee plans to use silver zeolite cartridges; th required sample volume will' be. collected in_ five minute '
.14.5 Projected thyroid dose commitments are calculated using;known
')
iodine release rates. If RAGEMS data are. not available, conservative default iodine to noble gas ratios will be used to estimate the iodine release rate. Projected dose calculational 'j
.r methods- are detailed in an Emergency Dose Calculations Manua (EDCM).-The licensee has reviewed the EDCM and removed many~
,
conservative values but has not changed the iodine to noble gas F
ratio. The ratios in use are being reviewed by tta license ,
15.0 Exit Meeting An exit meeting was. held'with the licensee personnel identified in Section 1 of this'reporttto discuss the exercise findings.' The-licensee was advised no violations were identified.- The inspector-also discussed some areas for improvement. Licensee managemen acknowledged these findings and indicated they would evaluate the o and take. appropriate corrective action regarding.the items identified.
, At-no time during the course of the inspection did the inspectors .,
provide,any written material"to the licensee,
' l
.'
>
l
). <-
.i
,
'fs'
..
.
s!'
..
,
.