PLA-2606, Monthly Operating Repts for Feb 1986

From kanterella
Revision as of 23:55, 8 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1986
ML20197D223
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/28/1986
From: Hirt J, Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2606, NUDOCS 8605140185
Download: ML20197D223 (9)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

g AVERAGE DAILY UNIT POWER LEVEL g/j $8; (%

g, 3 DOCKET NO. 50-387 L7 '"% nno UNIT

< s0 DATE 03/06/86

?g g COMPLETED BY J.A. Hirt TELEPHONE 542-3917 MONTH FEBRUARY ,1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-NetI

' 17 0 f 2 1041 l

3 1042 0 19 _

4 1017 20 0 3 982 0 21 6

1042 22 0 7 1034 23 0 _

3 1029 0 24 9

1024 0 25 10 1018 13 1013 0 27 12 inno 28 0 l3 1004 29 14 867 30 I$ n 31 16 0 INSTRUCTIONS On this format, list the averagt daily unit power level in MWe Net for each day in the reporting inonth. Compute to the nearest whole rnegawatt.

(9/77) 8605140105ggj(($g7 ADOCK PDR J ge')Y gDR YI

,.' h x g W

p 7

m - .= : = - a L ,~L- .

RJ -

OPERATING DATA REPORT l 50-387 bO 0 DOCKET NO.

M DATE 03/06/06 COMPLETED BY J.A. Hirt IC 3 TELEPHONE 542-3917 OPERATING STATUS Susquehanna Steam Electric Station Unitl Notes

2. Reporting Period: February 1986 g
3. Licensed Thermal Power (MWt p: nd inspection outage 5
4. Nameplate Rating (Gross MWe): on February 15, 1986.

1065

5. Design Electrical Rating (Net MWe): -
6. Maximum Dependable Capacity (Gross MWe): 106R
7. Maximum Dependable Capacity (Net MWe): 1032
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

No Chances

9. Power Level To Which Restricted. If Any (Net MWe): No Restrictions
10. Reasons For Restrictions. If Any: NA This Month Yr..to-Date Cumulatise
11. Hours in Reporting Period 672 1,416 23,929 33 .8 1,081.8 17,073
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0 0 710.6
14. Hours Generator On-Line 337 1,081 16,699.8
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,069,170 3,420,677 51,008,002
17. Gross Electrical Energy Generated (MWH) e49,286 1,118,896 16,617,888 l
18. Net Electrical Energy Generated (MWH) 311.50R 1 077 674 15.917.76?
19. Unit Service Factor 50.2 76.3 69.8
20. Unit Availability Factor 50.2 76.3 69.8 -
21. Unit Capacity Factor (Using MDC Net) 47.8 73.4 64.5
22. Unit Capacity Factor (Using DER Net) 46.3 71.1 62.5
23. Unit Forced Outage Rate 0 0 10.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each I:

Nona

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION (u/77)

%phNNA@

t

~

Mr ,! 'k! ,y

,y i (1) e 5 '

1 O b UNET Sitt6FDOWNS AND POWER REDUCTIONS DOCKET NO. 50-387

$ UNIT NAME One DATE 03/06/86

%hlC@5 C[

I REPOR T MONT11 February 1986 COMPLETED BY TELEPif0NE

.T A Ifi rt 542-3917 l

e c

, 5? }; } E5 Licensee [g {*. Cause & Corrective No. Date g 3g jg& Event g? a3 Action to

$5 5 j ;f3 y Repori # ui O Prevent Recurrence 5

3 860215 S 335 C 2 NA ZZ ZZZZZZ Manual scram to cminence second refueling outage.

i 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & ticense Examination from previous month F-Administrative -'

G-Operational Error (Explb) 5-Reduction Exhibit 1 - Same Source

('8/77) II-Other ( E xplain) 9-Other

Unit 1 SUSQUEHANNA STEAM ELECIRIC STATION Docket No. 50-387 Date 03/06/86 Cmpleted By J.A. Hirt Telephone (717)S42-3917 Challenges to Main Steam Safety Relief Valves None Ganges to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems

! None 1

l 3

I l

1

f m g>+

AVERAGE DAILY UNIT POWER LEVEL

$]

C/)

/ w Q]\Y 0

z 3 DOCKET NO. 50-388 k

UNIT h

< 0 DATE 03/06/86 gg 3Y COMPLETED BY J.A. Hirt TELEPHONE (717)542-3917 i

MONTH Febrim v, 1986 '

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 789 g7 1050 2 991 18 1049 3 1051 gg 1049 -

4 1051 20 1050 3 1049 23 1047 6 1052 22 948 7 1049 23 1047 _

g 889 24 1049 9 1006 23 1049 10 1051 26 1050 1g 1053 1050 27 12 1053 ,a 1051 13 1053 29 14 1052 30 15 1052 33 16 1051 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

D e

Z sw 3

L % -- RJ OPERATING DATA REPORT O DOCKET NO. 50-388 DATE 03/06/86 ODRIC s @4g COMPLETED BY J.A. Hirt l TELEPHONE (717)542-3917 l 1

OPERATING STATUS Unit 2 N"5 i

1. Unit Name: Suscnrhanna 9toam mctric st nt-inn
2. Reporting Period: Februarv. 1986
3. Licensed Thermal Power IMWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1069
7. Maximum Dependable Capacity (Net MWe): 1032
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

No Chances.

9. Power Level To which Restricted. if Any (Net MWe): No Restrictions
10. Reasons For Restrictions. If Any: NA This Month Yr..to.Date Cumulatise i1. Hours in Reporting Period 672 1.416 9,168
12. Number Of Hours Reactor Was Critical 672 1,322.6 8,443.8
13. Reactor Reserve Shutdown Hours 0 133.6 717.9 l
14. Hours Generator On.Line 672 1,257.6 8,252.7 l
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 2,161,190 3.951.679 25.992.447
17. Gross Electrical Energy Generated (MWH) 715.402 1.305.762 R . 51 R . 562
18. Net Electrical Energy Generated (MWH) 690.779 1.257.746 8.212.056
19. Unit Service Factor 100.0 88.8 90.0
20. Unit Availability Factor 100.0 88.8 90.0
21. Unit Capacity Factor (Using MDC Net) 99.6 86.1 86.R l
22. Unit Capacity Factor (Using DER Net) 4 6 5 . __ 8't a 84.1 l
23. Unit Forced Outage Rate 0.0 11 2 10.0
24. Shutdowns Scheduled Over Next 6 Months iType.Date,and Duration of Each1:

Refuelina Outage; August 2, 1986; 84 days.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION (4/77 )

a MgANN-'4 i l

m f l Yf5 w y

,s UNIT SIfDTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-388 Prat i UNIT NAME Two

$@ .O DATE 03/06/86 l NIC 5 REPORT MONTl1 February, 1986 COMPLETED BY J.A. Hirt TELEPHONE (717)542-3917 e

"i c- ce ~5 .a = 5

. Ee g 7sX Licensee E *t, c, Cause & Corrective No. Date g 3g  ; ,p g 5 Event s? 8."3 Action to

  • 5 Repynt # $0 0 c$ E j ;fi g Prevent Recurrenc-6 There were no unit shutdowns or power reductions for February, 1986.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Res riction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F Administrative -'

G-Operational Error (Explain) 5-Reduction Exhibit I - Same Source (9/77) Il-Other (Explain) 9-Other

o*

. +, ' , .

Unit 2 SUSQUEHAN!R STEAM ELECIRIC STATIN Docket No. 50-388 Date 03/06/86 Cmpleted By J.A. Hirt Telephone' (717)S42-3917 Challenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None l

1 I

l

V ./

N Q Pennsylvania Power & Light Company Two North Ninth Stitiet

  • Allentown, PA 18101 e 215 / 770-5151 i

Harold W. Keiser Vice President-Nuclear Operations 215/770-7502 MAR 111986 Director, Data Automation &

Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS

,, ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 l PLA-2606 50-388/NPF-22

Dear Mr. Beebe:

The February 1986 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, E

H. W. Keiser Vice President-Nuclear Operations Attachment cc: Dr. Thomas E. Murley Regional Administrator-Region I

. U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk (12 copies)

Mr. R. H. Jacobs - NRC Ms. M. J. Campagnone - NRC I P ,b k