PLA-2810, Monthly Operating Repts for Feb 1987

From kanterella
Revision as of 15:27, 5 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1987
ML20207S239
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/28/1987
From: Keiser H, Ryder T
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2810, NUDOCS 8703190177
Download: ML20207S239 (9)


Text

a .

pANN o 4

EA AVERAGE DAILY UNIT POWER LEVEL

.D j 7 m -... E DOCKET NO. 50-387 t- Tm 4 UNIT One O DATE 03/05/87

(+Op COMPLETED BY T.S. Ryder (717)S42-3235 TELEPHONE MONng Febnnry,1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net)

I 1nal 17 1042-1040 1042 2 ,,

3 1042 1041 19 4 1043 20 1036 5 1043 inn 21 6 918 1040 22 545 1043 7 23 548 s 24 1043 537 9 25 1044 to 540 1043 26 11 807 1044 27 773 1045 12 28 13 1039 29 14 1044 30 15 1042 38 1042 16 l

INSTRUCDONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

r 19/77 )

p I 8703190177 870228 l\

ADOCK 05000387 l

i hDR PDR

SANN 4

_:.. 3 u VMe h r ~ &

Q) ' -M  ?

M ...... 3 LN " ;F's J OPERATING DATA REPORT e 0 DoCxET No. 50-387 DATE 03/05/u/

OpNIC -- S i [s COMPLETED BY _T.S. Ryder TEllPHONE (717) 54Z-3235 OPERATING STATUS Unit One Susquehanna Sterrn Electric Station Notes

1. Unit Name:
2. Reporting Period: February 1987
3. Licensed Thermal Power (MWt):

3293

4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe):

10 %

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe): 1032
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

Nom

9. Power Level To Which Restricted,if Any (Net MWe): Nom
10. Reasons For Restrictions,If Any: N/A This Month Yr..to.Dat e Cumulative i1. Hours In Reporting Period 672 1,416 32,689
12. Number Of Hours Reactor Was Critical 672 1,416 23,603.5
13. Reactor Reserve Shutdown Hours 0 0 812.7
14. Hours Generator On-Line 672 1,416 23,030
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 2,029,678 4,466,452 70,749,590
17. Gross Electrical Energy Generated (MWH) 661,788 1,463,284 23,050,822
18. Net Electrical Energy Generated (MWH) 63 / , m 1,409,242 22,084,271
19. Unit Service Factor 100.0 100.0 70.5
20. Unit Availability Factor 100.0 100.0 70.5
21. Unit Capacity Factor (Using MDC Net) 91.9 96.4 65.5
22. Unit Capacity Factor (Using DER Net) 89.0 93.5 63.4
23. Unit Forced Outage Rate 0.0 0.0 ,,_

10.6

24. Shutdowns Scheduled Oser Next 6 Months (Type Date,and Duration of Each):

No shutdowns are scintuled

25. If Shut Down At End Of Report Period, Estimated Date of Startup: NM
26. Units in Test Status (Prior to Commercial Operation): Forecast Achwsed INITIA L CRITICALITY INITIAL ELECTRICITY CO\l%IERCIAL OPER ATION to/77i

[ 4, 3,

' 'f$)], [g.

x -.

v -

LN S UNIT SHUTDOWM AND POWER ltEDUC110NS DOCKET NO. 50-387 g R UNIT NAME SSES - Unit Ore f.g p DATE 03/05/87 4fC 5# REPORT MON 111 Felruary, 1987 COMP

) 3235 TE E n.

  • E c 5 "E -_*I5 Licensee E-t E*,, Cause & Corrective

%. jE 3s&

Date H

f:

k 5 jgg Event Report a

{$

mV h g

V Action to Prevent Recurrence 6

1 870206 S O B 5 N/A G ZZZZZZ Power redu d to approx. 55% to perform a rod sequence exchange and to make Reactor Water Cleanup Systen punp and valve repairs.

I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G - Instructions A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File INUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5 G-Operational Error IExplain) 5-Reduction Exhibit I- Same Source N/77) IIOther (Explain) 9-Other

I StBQUEHN@iA STEAM ELECTRIC STAPION Docket Number 50-387 Date 03/05/87 Canpleted by T.S. Ryder Telephone (717) 542-3235 6

Challenges to Main Steam Safety Relief Valves None

, Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None

[ AVERAGE DAILY UNIT POWER LET EL

@ i Q v Y - l

(#1. .... 5 DOCKET NO.50-38P Le. "h M UNIT (9 s0 DAir 03/05/87 T. S. ' R/ der IRIC cf COMPLETED BY TELEPHONE (717) 542-3235 gg Febntary 1987 ,

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER I.EVEL (MWe-Net) (MWe-Net t 992 1055 i 7 1053 2 18 1056 3 1054 1056 19 4 1054 1056 20 1055 105E 5 21 6 674 yy 1053 993 7 23 1056 _

10 % 1056 8 24 OM 1056 9 25 10 1056 26 1055 ,

il 1057 27 1055 12 1057 ,3 1055 1050 -

13 29 __ _

14 1057 15 1059 33 16 1056 INSTRUC110NS On this format, list the average daily unit power levelin MWe. Net for each day in the reporting moneh. Compute to the nearest whole rnegawatt.

(9/77)

I

/

FANN r- n

. e

- r- .,g hZ _

f*7 t "t- .U - - I..5. J i

OPERATING DATA REPORT DOCKET NO. 50-388 DATE _ nl/ns/R7 hkiC g@M COMPLETED BY _ T.S. Ryder TE11 PHONE t/1/) x z-3235 OPERATING STAT US Unit 'IWo I. Unit Name: Susepehan g Steam Electric Station Notes

2. Reporting Period: i:'ebruar/ 1987 3293
3. Licensed ThermalPower(MWtt:
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. IAaximum wpendable Capacity (Gross MWe): 1068 i 7. M sximum Dependable Capacity (Net MWe): 1032
8. l(Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None

9. Power Level To Which Restricted,If Any (Net MWe): Ne
10. Reaso.es For Restrictions,if Any: N/A This Month Yr..to.Date Cumulative i1. Houd in Reporting Period 672 1,416 17,928
12. Nu'nber Of Hours Reactor Wo. Critical 672 1,353 14,461 0 0 717.9
13. Reactor Reserve Einutdown Hours 14, ilours Generator Gn-Lia 672 1,317.3 14,046.6
15. Unit Resene S7.:.tdown Hours 0 0 0
16. Gross Therrral Energy Generated (MWH) 2,178,393 4,194,397 _43,587,282
37. Greu l>:e 91 cal Energy Generated (MWH) 720,962 1,385,468 T47289,762 1h Net Eleewal Energy Generated [MWH) 696,990 1,35/,013 ld ,73 9,542 f S. Un t Sersne Factor 100.0 93.0 78.4 2J. Urit Avalshiity Factor 100.0 93.0 78.4
21. Un!t Capaciiy Factor (Using Mr.C %t) 100.5 91.5 74.3
22. Unit Capacity Factor IUsinp 0ER Net) 7*4 08.7 72.0 U'U .#
  • U #*U
23. L'.dt Forced Outage Rate 24., St.utJowns Scheduled Ovry Nc. 6 Months IT)pe. Date.and Duration of Each):

, No shutdowns are sclnluled

'/*,'!! She Down At End Ofitepost Period, Estinsated Date of Startup: M/^

26. Units 1.s Test Sutus iI5or to Commercial Operation): Forecast Achiesed INITIAL CRillCALITY INITIAL ELEC TRICITY COMWIRCIAL OPER ATION (4/77 )

gANN4 .

j ,l y y .

Lb d UNIT SHUTDOWNS AND POWER REDUC 110NS DOCKETNO. 50-388 ef, g UNIT NAME SSES - Unit 'I%o DATE 03/05/87 f C'?gIC 5s REPORTMONTH February 1987 COMPLETED BY T.S. e/ der TELEPHONE II'ID42-32dD

  • -_E e

- EO "E

  • E5 Licensee E-r En Cause & Corrective No. Date E 3l $ 3jE Event 5i Action to H 5 mO h'3 f j di g Report a g Prevent Recurrence 5

2 870206 F 0 A 5 N/A TB FAN Power reduced to approx. 65% to replace failed bearings on the isophase bus duct cooling fan.

I 2 3 4 F: Forced Reason: M:; hod: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Esniain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5 G-Operational Error (Explain) 5-Reduction Exhibit I- Same Source 19/77) ll-Other(Explain) 9-Other

f SLBQUEHRIOR STEAM ELECTRIC STRrION Docket Ntznber 50-388. Date 03/05/87 Capleted by T.S. Ryder Telephone (717)S42-3235 Otallenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None

s- A.

PP&L Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101 = 215 / 770L5151 MAR 131987 Submitted Pursuant to Technical Specifications Harold W. Keiser Section 6.9.1.6 Vice President-Nuclear Operations 215/770-7502 Director, Data Automation &

Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 PLA-2810 FILE R41-2A 50-388/NPF-22

Dear Mr. Beebe:

The February 1987 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, s

'\

H. W. Keiser Vice President-Nuclear Operations Attachment cc: Document Control Desk (Original)

NRC Region I Mr. L. R. Plisco - NRC Resident Mr. M. C. Thadani - NRC Project Manager

}q