ML20210C677 | |
Person / Time | |
---|---|
Site: | Diablo Canyon, South Texas, 05000000 |
Issue date: | 10/31/1975 |
From: | Katz D, Lipchak J, Marasco F WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
To: | |
Shared Package | |
ML20210C503 | List:
|
References | |
NUDOCS 8705060264 | |
Download: ML20210C677 (125) | |
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARNOC-AE-000661, Rev 4 to Severe Weather Plan, Including Summary of Changes.With1999-10-0404 October 1999
[Table view]Rev 4 to Severe Weather Plan, Including Summary of Changes.With ML20217A2421999-09-30030 September 1999 Proposed Tech Specs Removing Parameters No Longer Applicable & Adding Tdf Value for Model 94 SGs in Place of Reactor Coolant Sys Flow ML20211Q2361999-09-0808 September 1999 Proposed Tech Specs 3/4.8.1,revised by Relocating 18-month Surveillance to Subject Sdg to Insps IAW Procedures Prepared in Conjunction with Mfg Recommendations to Section 3.8.1.1.4.8 of UFSAR ML20211Q8071999-09-0808 September 1999 Proposed Tech Specs & Associated Bases for Specification 3/4.8.1, AC Sources, to Eliminate Requirement for Accelerated Testing of Standby DGs & Associated NRC Reporting Requirements ML20211G2281999-08-24024 August 1999 Proposed Tech Specs Pages,Relocating Cycle Specific Operating Parameters from TSs to Colr,Including Moving Location of Insert 6 from Page 6-21 to Page 6-22 of Administrative Control Section & Renumbering Methods List ML20211C0371999-08-18018 August 1999 Proposed Tech Specs 3.4.9.3 Re Cold Overpressure Mitigation Curve Associated with Replacement SGs ML20210J0481999-07-28028 July 1999 STP Unit 1,Cycle 9 Startup Testing Summary Rept ML20209G9351999-07-15015 July 1999 Proposed Tech Specs 3.7.1.6 Re Atmospheric Steam Relief Valves ML20209H3371999-07-13013 July 1999 Rev 0 to 0PGP02-ZA-0004, Station Performance Data Collection,Categorization & Reporting ML20209H2131999-07-13013 July 1999 Rev 4,revised Pages 29 & 30 of 102 to Procedure 0ERP01-ZV-IN01, Emergency Classification ML20209G4461999-07-13013 July 1999 Proposed Tech Specs,Modifying 3.6.3 Action B,Clarifyin Use of Check Valve with Flow Through Valve Secured as Means to Isolated Affected Containment Penetrations ML20209C1511999-07-0101 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-80, Changing TSs 3.3.2 & 3.7.8 Allowing All Fuel Handling Bldg Exhaust Air Sys Components to Be Inoperable for Period of 8 Hours to Facilitate Repair of Train B Exhaust Booster Fan ML20209B5341999-06-24024 June 1999 Proposed Tech Specs Section 6.9.1.6.a,adding Min Measured RCS Flow,Which Lists Parameters Included in COLR ML20209H3151999-06-23023 June 1999 Rev 4 to 0PGP02-ZA-0003, Comprehensive Risk Management ML20195E4701999-06-0707 June 1999 Proposed Tech Specs Pages Re Proposed Amend to Licenses NPF-76 & NPF-80,deleting Total Allowance,Sensor Error & Z Terms from ESFAS & RTS Instrumentation Trip Setpoint Tables of TS 2.2.1 & 3.3.2 ML20195E4211999-06-0707 June 1999 Proposed Tech Specs,Relocating cycle-specific RCS-related TS Parameter Limits to COLR ML20209H3081999-06-0101 June 1999 Rev 3 to 0PGP04-ZA-0604, Probabilistic Risk Assessment Program ML20205S3511999-04-19019 April 1999 Proposed Tech Specs Bases Page 3/4 8-3 Removing Reference to Fast Transfer Capability That Is Inconsistent with STP Design Bases as Described in UFSAR Chapters 8.2 & 8.3 ML20205G8081999-03-30030 March 1999 Proposed Tech Specs,Relocating Section 3/4.3.3.4, Meteorological Instrumentation & Associated Bases Description to STP Trm,Per NUREG-1431 ML20204J9681999-03-22022 March 1999 Proposed Tech Specs Incorporating New TS for Atmospheric Steam Relief Valve Instrumentation & Revising TS 3.7.1.6 Re Atmospheric Steam Relief Valves ML20204D1581999-03-15015 March 1999 Proposed Tech Specs 3/4.7.9 for Snubbers to TRM ML20207D9651999-03-0202 March 1999 Proposed Tech Specs Change Clarifies Use of Check Valve with Flow Through Valve Secured as Means to Isolate Containment Penetration in TS 3.6.3 Action B ML20207C4721999-02-24024 February 1999 Proposed Tech Specs Bases 3/4.2.5,clarifying That Averaging of Only Three Channels Is Min Expected When Verifying DNB Parameter Compliance ML20202G6871999-01-26026 January 1999 Proposed Tech Spec Page 3/4 4-39,revising TS 4.4.10 for Alternate ISI of RCP Flywheels ML20199K5681999-01-20020 January 1999 Proposed Tech Specs Surveillance Requirement 4.7.1.2.1.a Re AFW Pump Performance Testing ML20198A2181998-12-10010 December 1998 Revised TS Pages,Adding Ref to TS Figure 2.1-2 to Bases Section 2.1.1 as Figure Provides DNBR Curves Appropriate to Alternate DNB Operating Criteria ML20198A1951998-12-0909 December 1998 Corrected TS Bases Pages B 3/4 8-15,-16 & -17,as Discussed During 981103 Telcon ML20196B8121998-11-23023 November 1998 Proposed Tech Specs Pages for Proposed Amends to Licenses NPF-76 & NPF-80,relocating Descriptive Design Info from TS 3/4.7.1.1 (Table 3.7-2) Re Orifice Sizes for Main Steam Line Code Safety Valves,To Bases Section ML20155J9031998-11-0303 November 1998 Proposed Corrected Tech Specs Bases 3/4 9-3 Re Water level- Refueling Cavity & Storage Pools ML20155D5801998-10-29029 October 1998 Proposed Tech Specs Pages for Amends to Relocate Portion of TS Surveillance Requirement for DG Fuel Oil Storage Tank to TRM ML20155D5561998-10-29029 October 1998 Proposed Tech Specs Pages for Proposed Amends to Relocate Snubber TS 3/4.7.9 to TRM ML20155D5441998-10-29029 October 1998 Proposed Tech Specs Pages for Proposed Amend to Relocate Turbine Overspeed Protection TS 3/4.3.4 to TRM ML20155C0701998-10-23023 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Converting to ITS ML20154M1621998-10-12012 October 1998 Revised Tech Specs Bases Pages B3/4 8-14 Through -17 ML20154C0051998-09-30030 September 1998 Proposed Tech Specs Reflecting Replacement SG Tube Insp Surveillance Differences & Deleting Provision Allowing Use of F* Alternate Repair Criteria ML20154C5071998-09-30030 September 1998 Proposed Tech Specs Bases Page B 3/4 9-2,removing Wording Re 10% Value for Clad Gap Iodine Isotopics ML20154A4281998-09-28028 September 1998 Proposed Tech Specs Re Requirements Associated with Control Room & Fuel Handling Bldg Ventilation Sys ML20154A4001998-09-25025 September 1998 Proposed Tech Specs Pages Re Sections 3.4 & 5.0 on RCS & Administrative Controls ML20151T1621998-08-31031 August 1998 Proposed Tech Specs 3.4.9.3 Re Cold Overpressure Mitigation Curve Associated W/Replacement SGs ML20238F0841998-08-28028 August 1998 Proposed Tech Specs Section 4.0.5,excluding Specified Containment Isolation Valves from ISI & Testing Requirements as Stated in Section XI of ASME Boiler & Pressure Vessel Code ML20236T5141998-07-22022 July 1998 Proposed Tech Specs Re Replacement SG Water Level Setpoint Differences ML20236R1461998-07-15015 July 1998 Proposed Changes to Current Tech Specs Bases ML20236L6311998-07-0707 July 1998 Proposed Tech Specs,Reflecting Rev of Criticality Analyses & Rack Utilization Schemes for Regions 1 & 2 of Spent Fuel Racks as Described in STP UFSAR & TSs ML20236N0001998-07-0606 July 1998 Proposed Tech Specs,Relocating RCS Design Features from TS Section 5.4 to UFSAR ML20236M6381998-07-0606 July 1998 Proposed Tech Specs,Relocating 3/4.3.3.3 Requirements for Seismic Instrumentation to Technical Requirements Manual ML20236K3481998-07-0606 July 1998 Proposed Tech Specs,Relocating 3/4.7.13 Requirements for Area Temp Monitoring Sys to Technical Requirements Manual ML20249C4221998-06-25025 June 1998 Proposed Tech Specs Pages Re 980522 RAI on LAR 97-09 for Section 3.6 Conversion to Improved TS ML20247F3321998-05-0707 May 1998 Proposed Tech Specs Pages,Reflecting Replacement SG Reactor Coolant Flow Differences ML20217P5921998-05-0101 May 1998 Proposed Tech Specs,Eliminating Requirement for Operations Manager to Hold SRO License ML20216G5961998-04-15015 April 1998 Proposed Tech Specs,Changing Surveillance Frequency from at Least Once Every 18 Months to at Least Once Per Refueling Interval 1999-09-08 Category:TEST REPORT MONTHYEARML20210J0481999-07-28028 July 1999
[Table view]STP Unit 1,Cycle 9 Startup Testing Summary Rept ML20072G8031994-08-17017 August 1994 STP Unit 2 Cycle 4 Startup Testing Summary Rept ML20092G4491991-11-19019 November 1991 Reactor Containment Bldg Integrated Leakage Rate Test Rept ML20081G1271991-03-0404 March 1991 Reactor Containment Bldg Integrated Leakage Rate Test Rept ML20012C5981990-03-14014 March 1990 Cycle 4 Startup Rept. W/900314 Ltr ST-HL-AE-3229, Startup Rept1989-09-18018 September 1989 Startup Rept ML20196C0991988-11-15015 November 1988 Rev 1 to IE Bulletin 88-005 Investigation Rept,South Texas Project Electric Generating Station - Unit 2 ML20151Q1411988-08-0202 August 1988 Summary of Unit 1 Voltage Verification Test Results (PSB-1) South Texas Project Electric Generating Station ML20246H9871988-04-30030 April 1988 Environ Qualification of Continental Wire & Cable Corp Instrumentation Cable Installed in Beaver Valley Power Station Unit 1 ML20153G3481987-11-25025 November 1987 Rev 1 to Irradiation Study of Boraflex Neutron Absorber Interim Test Data, Interim Technical Rept ML20209D4231987-04-21021 April 1987 Actuation Train Relay Response Time Test Summary & Results ML20215L0791987-04-17017 April 1987 Rev 1 to Purge Containment Isolation Valve, Operability Analysis & Test Rept ML20215L0991987-04-13013 April 1987 Qualification Test Rept on Valve & Actuator for Valtek,Inc, Springsville,Ut ST-HL-AE-2198, Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept1987-03-31031 March 1987 Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept ML20206K6431987-03-20020 March 1987 Rept of Test Conducted to Determine Effects of Spraying Water on Anaconda Flex Conduit Wrapped in Siltemp WT-65. No Visible Damage or Siltemp Slippage Observed ML20212M4771987-02-19019 February 1987 Energy,Inc Test Rept on Eight-Channel Digital Isolator ML20215E4621986-11-30030 November 1986 Voltage Study for Split Group Bus Configuration ML20215A4511986-11-30030 November 1986 Nonproprietary Noise,Fault,Surge & Radio Frequency Interference Test Rept ML20212M4921986-09-16016 September 1986 Electrical Test Rept on Isolation Relays & Transmitter & Receiver for Bechtel. Related Documentation Encl ML20155B1031986-03-31031 March 1986 Nonproprietary Natural Circulation,Boron Mixing & Cooldown Test,Final Post-Test Rept ML20195C7791986-02-20020 February 1986 Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump) ML20195C7601986-02-20020 February 1986 Rev 1 to Seismic Instruments Channel Check ML20210T5271986-02-19019 February 1986 Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R140 (HPCS Pump Base Mat) ML20195C8521986-02-18018 February 1986 Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R130 (HPCS Piping in Reactor Bldg) ML20195C8941986-02-18018 February 1986 Rev 2 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R170 (Reactor Recirculation Piping Support) ML20195C7681986-02-18018 February 1986 Rev 1 to Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump) ML20195C8671986-02-17017 February 1986 Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R180 (HPCS Pump Base Mat) ML20195C8731986-02-17017 February 1986 Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R190 (RCIC Pump Base Mat). Related Documentation Encl ML20195C8601986-02-14014 February 1986 Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R160 (Reactor Bldg Foundation) ML20195C7521986-02-0707 February 1986 Rev 1 to Triaxial Seismic Switch Channel Calibr for D51-N150 ML20195C7391986-02-0707 February 1986 Rev 1 to Triaxial Time-History Accelerograph Channel Calibr ML20206M3581986-01-0303 January 1986 Rev 2 to Door Sealing Matls Qualification File for Watertight Doors Mfg by Mosler Safe Co for South Texas Project Electric Generating Station ML20213G1521985-09-26026 September 1985 Sanitized Version of Test Program on Isolation Relays & Analog Signal Isolators for Use in Hope Creek Generating Station. W/Three Oversize Drawings ML20133N0211985-08-27027 August 1985 Electrical Cable Separation Verification Testing DCL-85-174, Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 19851985-04-29029 April 1985 Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 1985 ML20099E6561985-02-18018 February 1985 Rev 1 to Reactor Vessel Cavity Seal Test Results,Catawba Nuclear Station,Units 1 & 2,McGuire Nuclear Station,Units 1 & 2 ML20112J7191985-02-0404 February 1985 Rev a to Qualification Rept for Model KDI-1000 High-Range Containment Area Radiation Detector & Mineral-Insulated Cable Sys ML20104A9601985-01-18018 January 1985 Reactor Vessel Cavity Seal Test Results ML20198E7441985-01-10010 January 1985 Test Rept for Full Flow Testing of 16,18 & 20-Inch Main Steam Safety Valve Vent Stacks for Yankee Atomic Electric Co ML20137Z8271984-11-30030 November 1984 Nuclear Component Qualification Test Rept Square D 9025-BCW-45 Thermal Switch DCL-85-031, Startup Rept, for 831115-8410311984-10-31031 October 1984 Startup Rept, for 831115-841031 ML20064N8551984-10-12012 October 1984 Damper Test Rept for South Texas Project Units 1 & 2 ML20206M5281984-10-0101 October 1984 Damper Test Rept for South Texas Project Units 1 & 2 ML20098F5441984-09-30030 September 1984 Rev 0 to Evaluation of Tests Performed on Energy Absorbing Matl for Pipe Whip Restraints ML20100N1091984-08-31031 August 1984 Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 8, Final Rept ML20094C1511984-07-12012 July 1984 Extension of Retainer Lifetime to 4 Cycles ML20094G7451984-04-30030 April 1984 Rev 1 to Evaluation of Energy Absorbing Matl for Pipe Whip Restraints ML20138P4551984-04-19019 April 1984 Elcometer Adhesion Tests Nutec Concrete Coating Repair Sys 11S/1201/11S/1201 11S/1201/11/1201. Related Documentation Encl ML20100N1151984-03-31031 March 1984 Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 18, Final Rept ML20090J5601984-03-23023 March 1984 Reactor Containment Bldg Integrated Leak Rate Test (Preoperational) 1999-07-28 |