Responds to Re Agreements for Wiring Separation within Instrumentation & Control Protection Racks & Request for Meeting to Discuss Extension of Agreements.Contact W/ Ta Ippolito to Arrange Meeting Suggested.Related Ltr Encl
ML20210C626
Person / Time
Site: Diablo Canyon, South Texas, 05000000
Issue date: 10/14/1975
From: Heineman R
Office of Nuclear Reactor Regulation
To: Eicheldinger C
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20210C503 List:
References
NUDOCS 8705060253
Download: ML20210C626 (2)


Text

o ,

.c - -

' UNITED STATES NUCt. EAR RECULATERY COMMISSION 0

  • WASHINoToN, D. C. 20555

,, OCT141975 p ~ p" W ' m

- Mr. C. Eiche1dinger, Manager d Nuclear Safety Department M OCT 171975 Westinghouse Electric Corporation , , , _ D P. O. Box 355 C. ElCHELDINGER f Pittsburgh, Pennsylvania 15230 PWR NUCLEAR SAfEM Dear Mr. Eicheidingers Your letter to Mr. B. Rusche, dated August 19, 1975, was referred to me -

for response. In your letter, you reiterate the agreements reached at a generic meeting with the staff concerning wiring separation within the I & C protection racks. These agreements were specifically related to your 7100 Series Process Control System. Further, you request a meeting with the staff to discuss the extension of these agreements to the 7300 Series Process Control System since there exists an impasse with the staff in this regard.

As a result of the generic meeting, it was the staff's understanding that the additional verification testing was to assure that the "as built" 9 installation of the Diablo Canyon 7100 Series Process Control System which (V

did not conform to design criteria wiring separation would be i=mune to

[ postulated conditions. The staff also believed that Westinghouse understood that this test was only applicable to the Diablo Canyon design

( ') and subsequent plants would have to be reviewed individually. Further, the statement that the results and conclusions of the tests have been accepted by the staff appears in error. A letter to Pacific Gas and Electric Company from Olan D. Parr of NRR, dated September 4,1975, identified the areas that require resolution. ' A copy of this icteer is attached for your convenience.

We agree with you that this matter should be resolved in an expeditious manner. In this regard, I suggest that the appropriate members of your staff contact Mr. Thomas A. Ippolito, Chief. Electrical, Instrumentation

' and Control Systems Branch to establish a mutually agreeable meeting date.

Sincerely,

'j e Q **"= -

R. Heineman, Director I

Division of Technical Review Office of Nucicar Reactor Regulation

l

Attachment:

As Stated .

') 0705060253 B70430 PDR ADOCK 05000493 A pon

~

I

. [MM h.h -

ghouse Electric Corporation Power Systems pwn s,srems omsm Ba m Pittstug't Par 4Nni t'00

}

November 14, 1975 9 k 3_421 2 Mr. D. V. Kelly S.O. PGE-320 Chief Mechanical Engineer Y.2/ ' M PACIFIC GAS AND ELECTRIC COMPANY 77 Beale Street San Francisco, California 94106

\

PACIFIC GAS AND ELECTRIC COMPANY NUCLEAR PLANT, DIABLO CANYON SITE Amendment to W Pro.tection Systems Noise Test

Dear Mr. Kelly:

Attached are 30 copies of the subject report as agreed during the telecon e of October house, 2,1975 between Pacific Gas and Electric Co., NRC and Westing-s The attachment the subject report andincludes (1) an (2) background amendment information relative(indicated to electrical as Attachmen separation within I and C Protection Racks as installed at Diablo Canyon.

Attachment B is a revision to the original noise tests report (dated Occcmber,1974) as amended in February,1975. All recipients of the noise tests report in Attachment B.

should update their copies in accordance with instructions This (NIS), amendment the Solid State should resolve Systemall NRCand concerns the 7100 on theProcess Nuclear Instr i Protection (SSPS) Series Control System (RCS) equipment racks as installed at your site, i

Please advise if you have any further questions.

Very truly yours, WESTINGHOUSE NUCLEAR ENERGY SYSTEMS

-) fh'^^~- g l P. Blau Project Engineer l .

t

)

APPROVED:

jmh W. C. Gangloff. Hanager  !

Pacific Gas and Electric Project l' cc: D. V. Kelly 6L, 30 Encl.

R. L. Heller,s, IL [

(

..