Proposed Tech Specs,Eliminating Requirement for Operations Manager to Hold SRO License
ML20217P592
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/01/1998
From:
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20217P575 List:
References
NUDOCS 9805060357
Download: ML20217P592 (11)


Text

,

Attachm2nt A

. PG&E Letter DCL-98-066 l

l REPLACEMENT MARKED UP TECHNICAL SPECIFICATIONS

)

l i

l Remove Paae Insert Paae j i

0-5 6-5 l 6-6 6-6 I i

l I

l l

l l

l l

l l

9805060357 980501 li PDR ADOCK 05000275 P PDR

1 ADMINISTRATfVE CONTROLS PLANTSTAFF(Continued)  !

i d.

All CORE ALTERATIONS shall be observed and directly supervised by either a licensed Senior Operator or Senior Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation;

e. Deleted.

f.

Administrative procedures shall be developed and implemented to limit the i

working hours of plant staff who perform safety-related functions; e.g.,

, licensed Senior operators, and key Operators, maintenance licensed personnel.Operators, Health Physicists, auxiliary Adequate overtime. shift coverage shall be maintained without routine heavy use of I

l The objective shall be to have operating personnel work a nominal 40-hour week while the unit is operating. However, in the event that l unforeseen problems require substantial amounts of overtime to be used, or

during extended periods of shutdown for refueling, major maintenance or major plant modifications, on a temporary basis, the following guidelines shall be followed

1)

An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight, excluding shift turnover time; 2)

An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period, all excluding shift turnover time; 3)

A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods, including shift turnover time; and

4) Except during extended shutdown periods, the use of overtime should be considered shift. on an individual basis and not for the entire staff on a Any deviation from the above guidelines shall be authorized by the Plant Manager or his designee, or higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation. Controls shall be included in the procedures such that individual overtime shall be reviewed monthly by the Plant Manager or his designee to assure that excessive hours have not been assigned. Routine deviation from the above guidelines is not authorized; and 9'
  • "f"Y f f f Y f

I ruef-T A

/

/

l OIABLO CANYON - UNITS 1 & 2 6-5 32975100.4a TAB 34 Amendment _Nos.

5

)

ADMINISTRATIVE CONTROLS 6.2.3 DELETED' 6.2.4 SHIFT TECHNICAL ADVISOR 6.2.4 The Shift Technical Advisor shall provide advisory technical su Shift Foreman in the areas of thermal hydraulics, reactor engineering,pport and plantto the analysis with regard to the safe operation of the plant. '

6.3 PLANT STAFF OUALIFICATIONS 6.3 Each of ANSI /ANSmember 3.1-1978of the plant staff shall meet or exceed the minimum qualifications for comparable positions, except for the Radiation Protection Manager who shall meet or exceed the qualifications of Regulatory Guide 1.8, Revision 2, April 1987 for Radiation Protection Manager. The licensed Operators and Senior Operators shall also meet or exceed the mini the supplemental requirements specified in m qualifications of 10 CFR Part 55 and 1980 NRC letter to all licensees. ection A of Enclosure 1 of the March 28, t us cs.T 6 h j

.DIABLO CANYON - UNITS 1 & 2 6-6 32975100.4a TA0 34 6 Amendment Nos. id 90/

r ,

99,A /

I Insert A-TS Page 6-5 The Operations Director shall either hold a senior reactor operator license, have at one time held a senior reactor operator license for a pressurized water reactor, or be certified to a senior reactor operator equivalent level of knowledge. If the Operations Director does not hold a senior reactor operator license, the person assigned to the Operations middle manager position shall hold a senior reactor operator license.

Insert B - TS Page 6-6

, and the Operations Director as specified in Specification 6.2.2g.

l 1

I

. Attachmant B PG&E Letter DCL 98-066 )

{

)

REPLACEMENT PROPOSED TECHNICAL SPECIFICATION PAGES Remove Paae Insert Paae 6-5 6-5 64 64 l

l

l l ADMINISTRATIVE CONTROLS

' PLANT STAFF (Continued) i
d. ,All CORE ALTERATIONS shall be observed and directly supervised by either a licensed Senior Operator or Senior Operator Limited to Fuel Handling who has l

l no other concurrent responsibilities during this operation;

! e. Deleted.

l f.

Administrative procedurt.s shall be developed and implemented to limit the working hours of plant staff who perform safety-related functions; e.g.,

licensed Senior Operators, licensed Operators, Health Physicists, auxiliary j operators, and. key maintenance personnel.

Adequate shift coverage shall be maintained without routine heavy use of

overtime. The objective shall be to have operating personnel work a nominal l

40-hour week while the unit is operating. However, in the event that i

unforeseen problems require substantial amounts of overtime to be used, or during extended periods of shutdown for refueling, major maintenance or major plant modifications, on a temporary' basis, the fc,llowing guidelines shall be followed
1) An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight, excluding shift turnover time;
2) An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any

! 24-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour. period, nor more l

than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period, all excluding shift turnover time; l 3) A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods, l

including shift turnover time; and

4) Except during extended shutdown periods, the use of overtime should be considered shift. on an individual basis and not for the entire staff on a Any deviation from the above guidelines shall be authorized by the Plant Manager or his designee, or higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation. Controls shall be included in the procedures such that individual overtime shall be reviewed monthly by the Plant Manager or his designee to assure that excessive hours have not been assigned. Routine deviation from i

t

.the above guidelines is not authorized; and g.

The Operations Director shall either hold a senior reactor operator license, have at one time held a senior reactor operator license for a pressurized water reactor, or be certified to a senior reactor operator equivalent level of knowledge. If the Operations Director does not hold a senior reactor operator-license, the person assigned to the Operations middle manager position shall hold a senior reactor operator license.

DIABLO CANYON - UNITS 1 & 2 6-5 Amendment Nos.

32975100.4a TAB 34 5 l

ADMINISTRATIVE CONTROLS 6.2.3 DELETED 6.2.4 SHIFT TECHNICAL ADVISOR 6.2.4 The Shift Technical Advisor shall provide advisory technical su analysis with regard to the safe operation of the andplant.

plant Shift F 6.3 PLANT STAFF OUALIFICATIONS 6.3 of ANSIEach

/ANSmember 3.1-1978 of the plant staff shall meet or exceed the minimum qualifications for comparable positions, except for the Radiation Protection Manager who shall meet or exceed the qualifications of Regulatory Guide 1.8, 2, April 1987 specified for Radiation in Specification Protection 6.2.2 . Manager, and the Operations Director as 9

also meet or exceed the minimum qualifications of 10 CFR Part 5 requirements specified in Section A of Enclosure 1 of the March to all licensees. 28, 1980 NRC letter I

l l

l DIABLO CANYON - UNITS 1 & 2 6-6 32975100.4a TAB 34 6 Amendment Nos.

Attachment C PG&E Letter DCL 98-066 REPLACEMENT MARKED-UP IMPROVED TECHNICAL SPECIFICATION PAGES 1 1 Remove Paae insert Paae 5.0-4 5.0-4 5.0-5 5.0-5 l

l I

i

l Organization l

5.2 1

5.2 Organization l

5.2.2 Unit Staff (continued)

4. Except during extended shutdown periods, the use of overtime i should be considered on an individual basis and not for the entire staff on a shift. .

l Any deviation from the above guidelines shall be authorized in advance by the Plant Manager or his designee in accordance with approved administrative procedures, or by higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation.

Controls shall be included in the procedures such that individual overtime shall be reviewed monthly by the Plant Superintendent Plant Manager or his designee to ensure that excessive hours have not been assigned. Routine deviation from the above guidelines is not authorized.

ltJS E AT A~

e[k k

f. The Shift Technical Advisor (STA) shall provide advisory technical support to the SFM in the areas of thermal hydraulics. reactor engineering, and plant analysis with regard to the safe operation of the unit. The STA position shall be manned in MODES 1.2.3.

and 4 unless an individual with a SRO license meets the qualifications specified by the Commission Policy Statement on l

Engineering Expertise on Shift.

l

\

l I

1 l

l l

5.0 1 Unit 1 - Amendment No. XX DIABLO CANYON - UNITS 1 & 2 Unit 2 Amencment No. XX

Unit Staff Qualifications 5.3 5.0 ADMINISTRATIVE CONTROLS 5.3 dnit Staff Qualifications 19 s cG.T G

/

5.3.1 Each member of the plant staff shall meet or exceed the minimum qualifications of ANSI /ANS 3. -1978 for com] arable positions. except for the Radiation Protection qualifications of Regulatory Guide 1.8. Revision 2. April 1987 forir  !

Radiation Protection Managed The licensed R0s and SR0s shall also meet or exceed the minimum qualifications of 10 CFR Part 55 and the supplemental requirements specified in Section A of Enclosure 1 of the March 28. 1980 NRC letter to all licensees.

A retraining and replacement tiaining program for the plant staff shall '

be maintained under the direction of a designated member of the facility staff and shall meet or exceed the requirements and i reconrnendations of Section 5.5 of ANSI N18.1-1971 and 10 CFR Pa 1

l l

l OIABLO CANYON - UNITS 1 & 2 5.0-5 Unit 1 - Amendment No XX Unit 2 - Amendment No XX

I insert A-lTS Page 5.0-4 The Operations Director shall either hold a senior reactor operator license, have ;

at one time held a senior reactor operator license for a pree *ized water reactor, or be certified to a senior reactor operator equivalent level of knowledge. If the Operaticns Director does not hold a senior reactor operator license, the person assigned to the Operations middle manager position shall hold a senior reactor operator license.

Insert B -ITS Page 5.0-5

, and the Operations Director as specified in Specification 5.2.2e.