ML20155D580

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Pages for Amends to Relocate Portion of TS Surveillance Requirement for DG Fuel Oil Storage Tank to TRM
ML20155D580
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/29/1998
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20155D574 List:
References
NUDOCS 9811030251
Download: ML20155D580 (4)


Text

_ _

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

13) Demonstrating the OPERABILITY of the automatic load shed bypass and the manual load shed reinstatement features of the load sequencer.

f.

At least once per 10 years or after any modifications which could affect standby diesel generator interdependence by starting all standby diesel generators, simultaneously, during shutdown, and verifying that all standby diesel generators accelerate to at least 600 rpm in less than or equal to 10 seconds; and g.

At least once per 10 years b.)qf-

[cleaningthetankdusiraining each fuel tank, removing the accum 1) a sodium hypo crite solution, or e

alent, and 2)

Performing a essure test of ose portions of the esel fuel oil system signed to Sect III, subsection ND the ASME Code at j est pressure e al to 110% of the s em design pressyre. 7 4.8.1.1.3 Reports - All standby diesel generator failures, valid or nonvalid, shall be reported to the Commission in a Special Report pursuant to Specification 6.9.2 within 30 days. Reports of standby diesel generator failures shall include the information recommended in Regulatory Position C.3.b of Regulatory Guide 1.108, Revision 1, August 1977.

If the number of failures in the last 100 valid tests (on a per nuclear unit basis) is greater than or equal to 7, the report shall be supplemented to include the additional information recomended in Regulatory Position C.3.b of Regulatory Guide 1.108, Revision 1, August 1977.

SOUTH TEXAS - UNITS 1 & 2 3/4 8-6 Unit 1 - Amendment No. 68

[

Unit 2 - Amendment No. 57 9811030251 981029 PDR ADOCK 05000498 P

PDR

l ST-NOC-AE-000261 Page1 Technical Requirements Manual Page 4

J Technical Requirements Manual Pages Enclosed 3/4.8-1 B 3/4.8-1 e

l l

1 1

l ELECTRICAL POWER SYSTEMS l

NO TE THIS TRM REQUIREMENT DUPLICATES TIIE 3/4.8.1 A.C. SOURCES APPLICABLE REQUIREMENTS OF TECHNICAL SPECIHCATION 3/4.8.1. THE REQUIREMENTS AND ACTIONS OF Tile TECIINICAL OPERATING-SPECIFICATIONS GOVERN UNTIL TIIE NRC APPROVES TIIE RELOCATION AS REQUESTED IN NOC-AE-0002N, DATED 07/06/98.

LIMITING CONDITION FOR OPERATION Refer to Technical Specifications i

SURVEILLANCE REQUIREMENTS l

4.8.1.1.1 Each standby diesel generator shall be demonstrated OPERABLE:

a. At least once per 10 years by:

1)

Cleaning each fuel tank using a sodium hypochlorite solution, or equivalent, and 2)

Performing a pressure test of those portions of the diesel fuel oil system l

designed to Section III, subsection ND of the ASME Code at a test pressure equal to 110% of the system design pressure, i

l l

i South Texas - Units 1 & 2 3/4.8-1 TRM Amendment 10 L

i l

l

.- EECTRICAL POWER SYSTEMS

]

BASES 3/4.8.1 A.C. SOURCES - OPERATING i

Refer to Technical Specifications Bases.

3/4.8.4 ELECTRICAL EOUIPMENT PROTECTIVE DEVICES Containment electrical penetrations and penetration conductors are protected by either deenergizing circuits not required during reactor operation or by demonstrating the OPERABILITY of primary and backup overcurrent protection circuit breakers during periodic surveillance.

The Surveillance Requirements applicable to lower voltage circuits breakers provide assurance of breaker reliability by testing a representative sample of at least 10% of each manufacturer's brand of circuit breaker. Each manufacturer's molded case and metal case circuit breakers are grouped into representative samples which are then tested on a rotating basis to ensure that all breakers are tested.

j If a wide variety exists within any manufacturer's brand of circuit breakers it is necessary to divide that manufacturer's breakers into groups and treat each group as a separate type of breaker for surveillance purposes.

The molded case circuit breakers will be tested in accordance with NEMA Standard Publication No. AB-2-1980. For a frame size of 250 amperes or less, the field tolerance of the high and low setting of the injected current will be within + 40%, -25% of the setpoint (pickup) value. For a frame size of 400 amperes or greater, the field tolerance will be

  • 25% of the setpoint (pickup) value. The circuit breakers should not be affected when tested within their tolerance.

I I

South Texas - Units 1 & 2 B 3/4.8-1 TRM l

Amendment 10 l

!