ML20210H610

From kanterella
Revision as of 02:00, 4 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That Region III Received Rev 21 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Revision Was Submitted Under Provisions of 10CFR50.54(q) in Apr 1999
ML20210H610
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/30/1999
From: Shear G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Campbell G
CENTERIOR ENERGY
References
NUDOCS 9908040057
Download: ML20210H610 (2)


Text

I e.

July 30e 1999 l

Mr. Guy G. Campbell Vice President - Nuclear FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

REVIEW OF REVISION 21 TO VARIOUS PORTIONS OF THE DAVIS- BESSE NUCLEAR POWER STATION EMERGENCY PLAN

Dear Mr. Campbell:

In April 1999, Region ill received Revision 21 to various portions of the Davis-Besse Nuclear Power Station Emergency Plan. This revision was submitted under the provisions of

< 10 CFR 50.54(q).

Based on your determinations that the changes do not decrease the effectiveness of your Emergency Plan, and that the Plan continues to meet the standards of 10 CFR 50.47(b) and the j requirements of Appendix E to Part 50, NRC approvalis not required. Our initial review of these

, changes will be subject to inspection to confirm that they have not decreased the effectiveness l of your Emerge',cy Plan.

In accordanca with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.

l l Sincerely, l

l Original /s/ J. E. Foster for i

Gary L. Shear, Chief Plant Support Branch O Docket No. 50-346 License No. NPF-3 See Attached Distribution DOCUMENT NAME: G:\DRS\DAV07[ 9.WPD _

To receive e copy of thee clocument, Indicate in the hos 'C's Copy wIo attachtend *E's Copy weettech end "N's No copy OFFICE Rlli mlE Rlll 1 l NAME DFu_nk:tbk gf GShear (jf/Mr7 DATE 7@9 3'3 sg 79'9930/, # _

OFFICIAL RECORD COPY 9908040057 990730 ,

PDR ADOCK 05000346 F PDR

~

f &

I G. Campbell cc: J. Stetz, Senior Vice President - Nuclear J. Lash, Plant Manager J. Freels, Manager, Regulatory Affairs M. O'Reilly, FirstEnergy State Liaison Officer, State of Ohio R. Owen, Ohio Department of Health C. Glazer, Chairman, Ohio Public ,

Utilities Commission

)

Distribution- I RPC (E-Mail)

Project Mgr., NRR J. Caldwell, Rlli SRI Davis-Besse DRP DRS Rlli PRR PUBLIC IE-35 Docket File GREENS LEO (E-Mail)

DOCDESK (E-Mail)

D. Gonzalez, Rill I

W 030064  ;