April 20, 2021
SUBJECT:
BYRON STATION - INTEGRATED INSPECTION REPORT 05000454/2021001 AND 05000455/2021001
Dear Mr. Rhoades:
On March 31, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station. On April 7, 2021, the NRC inspectors discussed the results of this inspection with Mr. H. Welt, Acting Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Hironori Peterson, Chief Branch 3 Division of Reactor Projects Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000454 and 05000455 License Numbers: NPF-37 and NPF-66 Report Numbers: 05000454/2021001 and 05000455/2021001 Enterprise Identifier: I-2021-001-0017 Licensee: Exelon Generation Company, LLC Facility: Byron Station Location: Byron, IL Inspection Dates: January 01, 2021 to March 31, 2021 Inspectors: D. Betancourt-Roldan, Senior Resident Inspector C. Thompson, Illinois Emergency Management Agency J. Weigandt, Resident Inspector Approved By: Hironori Peterson, Chief Branch 3 Division of Reactor Projects Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities or small load changes requested by the transmission dispatcher, the unit remained at or near full power for the entire inspection period.
Unit 2 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities or small load changes requested by the transmission dispatcher, the unit remained at or near full power for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Impending Severe Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from an impending winter storm on January 25 through January 26, 2021.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) 1A safety injection (SI) prior to B test on February 10, 2021
- (2) 2B emergency diesel generator (EDG) during 2A semi-annual test as set forth in Work Order (WO) 5081391 on March 10, 2021
- (3) 2A EDG prior to 2B EDG work on March 22, 2021 Complete Walkdown Sample (IP Section 03.02) (1 Partial)
(1) (Partial)
The inspectors evaluated system configurations during a complete walkdown of the Unit 2 auxiliary feedwater (AF) system on February 3 and March 26, 2021.
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 1 Division 12 Miscellaneous Electrical Equipment Room (MEER) and Battery Room, Fire Zones (FZs) 5.4-2, 5.5-2, and 5.6-2 on March 10, 2021
- (2) 1B EDG Room, FZ 18.1-1 on March 4, 2021
- (3) Unit 2 Division MEER, FZ 5.4-2 on March 17, 2021
Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the on-site fire brigade training and performance during an unannounced fire drill on January 30, 2021.
71111.07A - Heat Sink Performance
Annual Review (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness and performance of:
- (1) Component cooling heat exchanger tube plugging on February 16, 2021
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the Control Room during implementation of Engineering Change (EC) 632575, Unit 1 "Tref" adjustment on March 3, 2021. The inspectors also observed operator performance in the Control Room during 0BOSR MP-1 max VAR testing under Work Order 5029908 on March 11, 2021.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated a licensed operator training requalification scenario on February 15, 2021.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Issues with Unit 2 power oscillations as documented in Action Request (AR) 04396745 on January 25, 2021
- (2) Control Room heating ventilation and air conditioning (VC) system on February 10, 2021
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) 1B residual heat removal (RH) work window on February 10, 2021
- (2) 1A SI work window as set forth in WO 5067292 on March 3, 2021
- (3) Work risk during the week of March 15, 2021
- (4) Work risk during the week of March 29, 2021
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) The 2B diesel generator tripped during start for monthly run as documented in AR 4397062 on January 21, 2021
- (2) VC damper issue as documented in AR 4399739 on January 20, 2021
- (3) 0B essential service water (SX) cooling tower fan oil press alarm as documented in AR 4403121 on February 19, 2021
- (4) Unit 2 Power Distribution Monitoring System/Plant Process Computer problem as documented in AR 4407267 on March 13, 2021
- (5) 1FW009A, Main feedwater isolation valve hydraulic pump cycling as documented in AR 441170441170on March 26, 2021
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)
(2 Samples)
The inspectors evaluated the following temporary or permanent modifications:
- (2) Revise Unit 1 Reactor Coolant System (RCS) Program Reference Temperature from 587.0 deg F to 586.5 deg F in the Ovation' Digital Control System as documented in WO 5093368 and EC 632575 on March 3, 2021
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
- (1) 1A containment spray (CS) post-maintenance test (PMT) following maintenance as set forth in WO 04966365 on February 3, 2021
- (2) 2A CS PMT per 2BOSR 5.5.8.CS.5-1c as set forth in WO 5115336 on February 26, 2021
- (3) 1A SI pump bearing and seal work and test per 1BOSR 5.5.8.SI.5-1a as set forth in WO 5112994 on March 4, 2021
- (4) 0B Fire Pump PMT following maintenance as set forth in WO 5136033 on March 26, 2021
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
- (1) 1BOSR 7.5.4-2, 1B AF monthly test as set forth in WO 5118865 on February 19, 2021
- (2) Surveillance Frequency Change, (STI BY-20-004), Revise valve alignment verification from monthly to quarterly on March 3, 2021
- (3) 2BOSR 8.1.2-1, 2A Diesel Generator Test as set forth in WO 5115341, on
February 3, 2021 Inservice Testing (IP Section 03.01) (1 Sample)
- (1) Group A inservice test (IST) for 2RH01PB on January 23, 2021
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)
(1 Sample)
- (1) The inspectors observed and evaluated an emergency preparedness (EP) drill on
===February 9, 2021.
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)===
The inspectors evaluated:
- (1) The inspectors observed and evaluated a DEP scenario on February 19,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 03.01) ===
- (1) Unit 1 (January 1, 2020 - December 31, 2020)
- (2) Unit 2 (January 1, 2020 - December 31, 2020)
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 03.02)
(2 Samples)
- (1) Unit 1 (January 1, 2020 - December 31, 2020)
- (2) Unit 2 (January 1, 2020 - December 31, 2020)
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 03.03) (2 Samples)
- (1) Unit 1 (January 1, 2020 - December 31, 2020)
- (2) Unit 2 (January 1, 2020 - December 31, 2020)
71152 - Problem Identification and Resolution
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Use of plant barrier impairment (PBI) permits during maintenance activities on February 10,
INSPECTION RESULTS
Observation: Use of Plant Barrier Impairment Permits During Maintenance 71152 Activities On February 10, 2021, during the NRC performed a walkdown of protected equipment associated with a 1B RH cubicle cooler work window (WO 4952630). During this walkdown the NRC noted the Unit 1 containment spray (CS) pump area door, 0DSD245, was wide open and unattended. Upon identification the inspectors notified the shift of the condition. The inspectors proceeded to review the PBI program documents and noted that they only allowed the door to be open 1 inch or less due to ventilation requirements.
The inspectors reviewed the Corrective Action Program (CAP) causal evaluation performed by the licensee for the initial as found condition. The evaluation stated that two additional doors (0DSD847, and 0DSD253) had also been blocked open effectively linking the 1A CS room, 1B CS room and 1B RH room. Based on existing and expected pressures, the evaluation concluded that there was reasonable assurance that the auxiliary building ventilation was operable. Additionally, the evaluation on the human performance aspect concluded that the lack of briefing the specific PBI requirements to the assigned individuals prevented the identification and correction of the condition. Based on an inadequate brief or turnover, the responsible individuals did not understand that the door could not be propped full open due to ventilation requirements. The inspector identified that the failure to follow the plant barrier impairment program when blocking open doors 0DSD245, 0DSD847, and 0DSD253 was a performance deficiency, but that it was of minor significance since it did not affect the availability, capability or reliability of safety systems.
To further understand if there where general issues with PBIs the inspectors looked in the CAP system and found that over the course of a month, three instances of inadequate use of PBIs were entered in the CAP as listed below:
2/2/2021: AR 04399590, New PBI required for 1A CS pump work window 2/17/2021: AR 04403035, NRC identified item on PBI 3/9/2021: AR 04407661, Incorrect PBI permit generated for 2A RH work window Based on the information above the inspector saw that there was a potential that Byron staff may not be fully aware that there are more PBI requirements than just performing a fire watch. The observation was shared with the site who is addressing this item as part of their planned corrective actions.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On April 7, 2021, the inspectors presented the integrated inspection results to Mr. H. Welt, Acting Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.01 Corrective Action 04393161 Degraded Piping 12/31/2020
Documents
Procedures OP-AA-108-111- Severe Weather and Natural Disaster Guidelines 22
1001
71111.04 Procedures BOP AF-M2A Aux. Feedwater System Train "A" Valve Lineup 7
BOP DG-E2A Diesel Generator Train "A" Electrical Lineup 3
BOP DG-M2A Train "A" Diesel Generator System Valve Lineup 10
BOP DG-M2B Train "B" Diesel Generator System Valve Lineup 9
BOP SI-M1A Train "A" Safety Injection Valve Lineup 2
71111.05 Corrective Action 2392278 Battery in Use Light Did Not Illuminate 10/07/2014
Documents 2392279 Battery in Use Light Did Not Illuminate 10/07/2014
4102915 2PA39J Battery Trouble Light Lit 02/11/2018
Corrective Action 4398693 NRC Identified, Non TRM Fire Door Not Latching 01/28/2021
Documents 4406643 NRC ID- 0DSD606 (0B SX M/U PP DO Tank Room) Does 03/04/2021
Resulting from Not Lock
Inspection
Drawings 6E-2-4030FP43 Fire Detection Control Cabinets 2PA39J & 2PA49J D
6E-2-4171 Elevation Fire Detection Control Cabinet 2PA39J P
6E-2-4186 Elevation Fire Detection Control Cabinet 2PA49J S
Fire Plans FZ 18.1-1 1B DG & Switchgear Room Air Shaft 2
PFP #201 Fire Area/Zone: FZ 18.6-0, Service Bldg. 401'-0" ELEV. 3
Ground Floor
PFP #48 FZ 5.4-2, Aux. Bldg. 451' Div. 22 MEER 3
PFP #50 FZ 5.5-2, Aux. Bldg. 451' U2 AEER 4
Miscellaneous 21-04-MMD FLS Fire Drill Scenario No. 21-04 12/30/2020
Office
Procedures BAP 1100-10T Fire Drill Planning Checklist 0
OP-AA-201-003 Fire Drill Performance 18
Self-Assessments A-Shift-21-04 Fire Drill Record 02/01/2021
71111.07A Engineering BYR97-467 Component Cooling Heat Exchanger Tube Plugging 7
Evaluations Evaluation
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.11Q Miscellaneous LORT Scenario 02/25/2021
71111.12 Corrective Action 04396726 0VC Make Up Fan Trip 01/19/2021
Documents 04396745 Unit 2 RX Power Oscillating Since Last Outage 01/19/2021
71111.13 Corrective Action 4403035 NRC Identified Item on PBI 02/17/2021
Documents
Resulting from
Inspection
Miscellaneous UFSAR 9.4.5.1 Auxiliary Building HVAC 13
Procedures BAP 1100-3A3 Pre-Evaluated Plant Barrier Matrix 43
CC-AA-201 Plant Barrier Control Program 13
71111.15 Corrective Action 04397062 2B DG Tripped During Monthly Start 01/21/2021
Documents 4399739 Fire Damper oVC187Y Electro-Thermal Links Blown, 02/02/2021
Damper Open
4403121 0B SX CT Fan Oil Pressure Alarm 02/19/2021
4407267 U2 PDMS/PPC Problem Alarm 03/13/2021
Operability 441170 1FW009A, Main Feedwater Isolation Valve Hydraulic Pump 03/26/2021
Evaluations Was Cycling
Procedures OP-AA-108-115 Operability Determinations 24
71111.18 Engineering 632575 FCN-CAEO-40544: Decrease of Full Load Tref from 587 deg 03/03/2021
Changes F to 586.5 deg F
Work Orders 5093368 Revise Unit 1 RCS Program Reference Temperature in 03/03/2021
Ovation
71111.19 Corrective Action 4411158 0B Diesel Fire Pump Battery #2, Cell#1 Low Specific Gravity 03/24/2021
Documents
Corrective Action 4406587 NRC ID: Boric Acid Build up on 0PI-FC006 03/04/2021
Documents
Resulting from
Inspection
Procedures 2BOSR Comprehensive Inservice Testing (IST) Requirements for 10
5.5.8.CS.5-1c Containment Spray Pump 2CS01PA
Work Orders 4966365 1A CS PMT Following Maintenance 02/03/2021
5109618 0BOSR 10.B.2-1, Diesel Fire Pump Battery Monthly 03/26/2021
Surveillance
5115336 (NEIL) - 2CS01PA Comprehensive IST RQMTS for 02/19/2021
Inspection Type Designation Description or Title Revision or
Procedure Date
26616 0BOSR 10.B.6-1, Diesel Fire Pump Monthly Surveillance 03/26/2021
5136033 Unexpected Auto Start of 0B Fire Pump 03/25/2021
71111.22 Miscellaneous STI BY-20-004 Revise Valve Alignment Verification Monthly Surveillance 03/01/2021
from Monthly to Quarterly
Procedures 1BOSR 7.5.4-2 Diesel Driven Auxiliary Feedwater Pump Monthly 32
Surveillance
2BOSR Group A Inservice Testing (IST) Requirements for Residual 12
5.5.8.RH.5-2a Heat Removal Pump 2RH01PB
Work Orders 5098934 (NEIL) - 2RH01PB Group A IST Requirements for RH Pump 01/22/2021
5115341 LR-2BOSR 8.1.2-1, 2A D/G Monthly Surveillance 02/03/2021
5118865 1BOSR 7.5.4-2, 1B AF PP Run 02/18/2021
71151 Miscellaneous Unplanned Power Changes Data from Logs (01/01/2020 -
2/31/2020)
71152 Corrective Action 4234300 Specific Gravity is Low on the 0D Dsl Drv FP Batt #2 03/29/2019
Documents 4399590 New PBI Required for 1A CS Pump Work Window 02/02/2021
4407661 Incorrect PBI Permit Generated for 2A RH PP Work Window 03/09/2021
Miscellaneous 0BOL 10.g LCOAR Fire Assemblies TRM LCO # 3.10.g for PBI 20-295 02/11/2021
and 296
OP-AA-201-007, "Sample" Fire Watch Inspection Log for 0DSD245/0DSD847 02/11/2021
PBI 20-295 CC-AA-201-F-01, Plant Barrier Impairment Permit for 02/11/2021
0DSD245
11