Request for Information for NRC Commercial Grade Dedication Inspection Report 05000454/2025010 and 05000455/2025010
ML24281A150
Person / Time
Site: Byron  
(NPF–037, NPF–066)
Issue date: 10/07/2024
From: James Park
NRC/RGN-III/DORS/RPB3
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
Download: ML24281A150 (1)


See also: IR 05000454/2025010

Text

David Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

BYRON STATION - REQUEST FOR INFORMATION FOR NRC

COMMERCIAL-GRADE DEDICATION INSPECTION: INSPECTION REPORT

05000454/2025010; 05000455/2025010

Dear David Rhoades:

On January 27, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a

commercial-grade dedication (CGD) inspection at Byron Station. This inspection will be

performed in accordance with NRC Inspection Procedure 71111.21N.03, Commercial Grade

Dedication.

The inspection will evaluate the implementation of Byrons process for dedicating

commercial-grade items, as required in applicable portions of Title 10 of the Code of Federal

Regulations (10 CFR) Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power

Plants and Fuel Reprocessing Plants, to ensure reasonable assurance is provided that these

items will perform their intended safety function. Additionally, the inspection will evaluate

implementation of Byrons procurement process for safety-related components, as required in

Appendix B.

The inspection may include an onsite information gathering visit by the lead inspector. The

inspection will include 2weeks onsite and will consist of three NRC inspectors (including the

lead inspector) along with one observer. The current inspection schedule is as follows:

Information Gathering Visit:

January 8-10, 2025

Preparation week:

January 21-24, 2025

Onsite weeks:

January 27-31, 2025, and February 10-14, 2025

The purpose of the information gathering visit would be to meet with knowledgeable individuals

of your staff to become familiar with the process for dedicating commercial-grade items and the

process for procuring safety-related components at Byron. This visit would also allow the lead

inspector to meet with Procurement Engineering and other site individuals responsible for the

inspection to ensure a common understanding of expectations for the inspection. This visit may

include a tour of onsite commercial-grade item dedication facilities, receipt inspection facilities,

storage facilities, and installed plant components associated with potential inspection samples.

During the visit (if performed), the lead inspector will also review the information provided in the

initial information request and may request additional information needed to support the

inspection.

October 7, 2024

D. Rhoades

2

Experience with previous baseline inspections of similar depth and length has shown that this

type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee

staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into four groups:

The first group lists information necessary for our initial inspection scoping

activities. This information should be provided to the lead inspector no later than

November 13, 2024. The lead inspector will communicate the initial selected set of

samples no later than November 27, 2024.

The second group of documents requested are those items needed to support our

in-office preparation activities. This set of documents should be provided to the lead

inspector no later than December 20, 2024. During the in-office preparation activities,

the team may identify additional information needed to support the inspection.

The third group includes the additional information above, a schedule of plant

activities associated with the inspection during the onsite period, and any additional

requests resulting from the potential information gathering visit. This information

should be available to the team onsite on January 27, 2025.

The fourth group includes supporting information to be provided throughout the onsite

inspection. Specifically, corrective action documents and answers to questions

developed during the inspection are requested to be provided as the documents

are generated.

In addition, the enclosure includes information and requests addressing inspection logistics.

The lead inspector for this inspection is Joon S. Park. We understand that our licensing contact

for this inspection is Gerald Armstrong of your organization. If there are any questions about the

inspection or the material requested in the enclosure, please contact the lead inspector at

630-829-9715 or via email at Joon.Park@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required

to respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

D. Rhoades

3

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Joon S. Park, Reactor Inspector

Engineering Reactor and Projects Branch

Division of Operating Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Commercial-Grade Dedication Inspection

Request for Information

cc: Distribution via LISTSERV

Signed by Park, Joon

on 10/07/24

D. Rhoades

4

Letter to David P. Rhoades from Joon S. Park dated October 07, 2024.

SUBJECT:

BYRON STATION - REQUEST FOR INFORMATION FOR NRC

COMMERCIAL-GRADE DEDICATION INSPECTION: INSPECTION REPORT

05000454/2025010; 05000455/2025010

DISTRIBUTION:

Robert Ruiz

RidsNrrDorlLpl3

RidsNrrPMByron Resource

RidsNrrDroIrib Resource

Jack Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Allan Barker

David Curtis

Jonathan Feibus

R3-DORS

ADAMS Accession Number: ML24281A150

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

Jpark:anm

DATE

10/07/2024

OFFICIAL RECORD COPY

Enclosure

COMMERCIAL-GRADE DEDICATION INSPECTION REQUEST FOR INFORMATION

I.

ADMINISTRATIVE INSPECTION INFORMATION

Inspection Report Numbers:

05000454/2025010; 05000455/2025010

Onsite Inspection Dates:

January 27-31, 2025, and February 10-14, 2025

Inspection Procedure:

IP 71111.21N.03, Commercial Grade Dedication

Lead Inspector:

Joon S. Park, Reactor Inspector, RIII/DORS/ERPB

630-829-9715

Joon.Park@nrc.gov

Teammates:

Benny Jose, Senior Reactor Inspector, RIII/DORS/EB2

Muzammil Siddiqui, Reactor Inspector, RIII/DORS/EB1

II.

LOGISTICS

Email the following inspection logistics to the lead inspector by January 17, 2025, or

sooner:

1.

Inspection room name/number, directions from the main access facility, and phone

number.

2.

Interview room name/number.

3.

Response team contact information (names and phone numbers) and team

roles (e.g., management sponsor, lead, inspector counterpart).

4.

Any site access/badging actions needed for each inspector.

5.

Any dosimetry actions needed for each inspector.

6.

Entrance meeting time and location.

7.

Confirmation that the team will have access to a licensee computer with a

nearby printer.

8.

Confirmation that the team will have Wi-Fi access.

9.

Cafeteria location and hours.

10. Inspection response team normal working hours.

11. Any potential resource conflicts during the inspection (e.g., emergency drills

and all-staff meetings).

12. Current management and engineering organizational chart.

2

III. INFORMATION REQUEST

Contact the lead inspector as soon as possible if you have any questions regarding this

information request. Provide the information electronically in pdf files, Excel, or other

searchable formats, preferably via an electronic sharing service (CERTREC, ShareFile,

Box, etc.). Specific Excel formats for various enclosure items may be requested to assist in

inspection sample selection. If you do not have access to any of these services or similar,

we can provide you access to Box, which can be used to upload/download and share

documents. The files should contain descriptive names and be indexed and hyperlinked to

facilitate ease of use. Information in lists should contain enough information to be easily

understood by someone who has knowledge of light-water reactor technology.

1.

Information Requested for Selection of Samples

The following information is requested by November 13, 2024, or sooner, to facilitate

the initial sample selection.

Note: If you are unable to provide items 1.1. through 1.16., as requested, please

reach out to the lead inspector as soon as possible.

1.1.

Risk-Ranking of the top 500 components from your site-specific

probabilistic safety analysis (PSA) sorted by Birnbaum Worth. Include

values for Risk Achievement Worth, Risk-Reduction Worth, and

Fussell-Vesely. Please provide the ranking in an excel spreadsheet that

contains the importance measures and the description of the basic event

(e.g., not just the basic event designator);

1.2.

Risk-ranking of the top 500 components (i.e., Large Early Release

Frequency (LERF)) from your site-specific PSA similar to the request in

Item 1.1. (Provide in Excel format);

1.3.

Provide a list of the top 500 cut-sets from your PSA. Provide the

descriptions of the basic events in the list of cut-sets. (Provide in Excel

format);

1.4.

Provide a list of the top 100 cut-sets for each initiator modeled in the PSA

that contributes more than 5 percent to the baseline plant core damage

frequency. (Provide in Excel format);

1.5.

List of commercial-grade items, with a brief description of application, that

have been dedicated for safety-related applications. These items may be

dedicated by the site or dedicated by a vendor (or other licensee) and

procured by the site. Please note whether the item has been installed in

the plant. Please include the component equipment identification of the

proposed or installed item location which can be correlated to the lists

provided in Items 1.1 and 1.2. The list should encompass the past

six years of dedication activities;

1.6.

List of any commercial-grade-items that failed after completing the

dedication process. The list should encompass the past six years of

dedication activities;

3

1.7.

List of components procured as safety-related, with descriptions, if not

included above. Please note whether the component has been installed in

the plant. Please include the component equipment identification of the

proposed or installed location which can be correlated to the lists provided

in Items 1.1 and 1.2. The list should encompass the past six years of

procurement activities;

1.8.

List of corrective action program documents, with descriptions, related to

commercial-grade items, procurement, or storage, including any items that

failed after completing the dedication process. The list should encompass

the past six years of these activities;

1.9.

List components procured as safety-related or commercial-grade items

intended to be dedicated for safety-related applications that are on hold

because of concerns identified during receipt, dedication, or from

operating experience/corrective action program as applicable. If possible,

the list should identify the systems and equipment in which these items

were intended for use;

1.10. List of components procured as safety-related or commercial-grade items

dedicated for safety-related applications, in the past six years, where the

procurement/dedication process was expedited to support rapid

turnaround (less than 7 days). If possible, the list should identify the

systems and equipment in which these items were intended for use;

1.11. Procedures for dedicating commercial-grade items and for procurement of

safety-related components. Also include procedures controlling

counterfeit, fraudulent, and suspect items;

1.12. Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical

Requirements Manual;

1.13. Electronic copies of simplified plant drawings (if available). Note: these

may be uncontrolled documents such as big notes, training diagrams,

etc.;

1.14. List of systems, system numbers/designators, and corresponding names;

1.15. List of site contacts that will be associated with the inspection;

1.16. Copy of qualifications, as applicable, of personnel who performed

commercial-grade dedication, safety-related component procurement, and/or

receipt inspection/testing activities within the past six years.

4

2.

Information Requested to Support Inspection Preparation Activities

The following information is requested by December 20, 2024, or sooner, to facilitate

inspection preparation.

This document request is based on typical documents that a generic plant might have.

As such, this document request is not meant to imply that any specific plant is required

to have all of the listed documents. In addition, your plant-specific document titles may

vary from the document titles listed below.

This information should be separated for each selected sample, especially if provided

electronically (e.g., folder with sample name that includes specifications, inspection

reports, dedication information, etc.).

2.1.

Purchase requisitions and purchase orders;

2.2.

Other pertinent vendor/licensee correspondence;

2.3.

Original and updated design specifications;

2.4.

Catalog specifications;

2.5.

Procurement basis evaluation such as like-for-like, equivalency, plant

design change packages, drawing and specification updates;

2.6.

10 CFR 50.59 documentation, if applicable;

2.7.

Material receiving reports, packing lists/invoices, and other shipping

documents;

2.8.

Receipt inspection reports and any related test reports;

2.9.

Other documents to trace the item from the time it was dedicated to the

time it was installed, tested, and accepted;

2.10. Certificates of conformance/compliance/quality;

2.11. Vendor test and inspection reports;

2.12. Third-party or sub-vendor test and inspection reports;

2.13. Shelf-life information;

2.14. Vendor dedication/partial dedication information;

2.15. Design/material/process change history information;

2.16. Completed commercial-grade dedication documentation including:

2.16.1 safety classification;

2.16.2 identification of safety functions/application requirements;

5

2.16.3 identification of critical characteristics;

2.16.4 identification of verification methods and acceptance criteria for the

critical characteristics;

2.16.5 evaluation of credible failure modes, if applicable;

2.16.6 identification of the suppliers quality assurance program that meets

10 CFR Part 50, Appendix B;

2.17. Any deviation from design, material, and performance characteristics

relevant to the safety function (nonconformance dispositions);

2.18. Documents showing objective evidence:

2.18.1 special test and inspection procedures and results;

2.18.2 commercial-grade survey reports -item, design, material, and specific

performance characteristic (relevant to safety function);

2.18.3 source inspection reports;

2.19. Completed post-installation test procedure and results;

2.20. Completed stock or material issue forms and installation work orders or

reports;

2.21. Historical performance information, including corrective action

documents, maintenance rule performance, failure analysis or root cause

analysis for any failed components, and system health reports related to

the installed components.

3.

Additional Information to be Provided on January 27, 2025, Onsite

3.1. During the in-office preparation activities, the team will be making final

selections and may identify additional information needed to support

the inspection. The lead inspector will provide a list of the additional

information needed during the week of January 20, 2025.

3.2. Schedule of any activities to be conducted on the selected samples

during the two onsite inspection weeks (e.g. installation, testing,

inspection, etc.).

6

3.3. Schedule of separate interviews with knowledgeable plant personnel

for each of the components selected during the beginning of the first

onsite week. Interviews will discuss the dedication/procurement

process, selected critical characteristics of each sample, installation,

and performance of installed items. This can include, but is not limited

to, plant personnel from Procurement Engineering, other Engineering

disciplines, Operations, Maintenance, or any other departments that

are cognizant of the dedication/procurement, installation, and

acceptance criteria/methods of each component including

component/system health.

4.

Information Requested to be Provided Throughout the Inspection:

4.1. Any corrective action documents generated as a result of the

teams questions during this inspection as the documents are

generated.

4.2. List of questions and/or document requests submitted by the team and their

status (e.g., open, closed) sorted by inspector. Provide daily by 2:00 p.m. to

each inspector. It is recommended to provide the lead inspector with a

master list sorted by inspector and each inspector with a list containing only

the items originated by that inspector.

If you have questions regarding the information requested, please contact the lead inspector.