SUBJECT:

BYRON STATION - PHASE 2 POST-APPROVAL LICENSE RENEWAL REPORT 05000454/2024011

Dear David Rhoades:

On June 28, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station and discussed the results of this inspection with Shane Harvey, and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Byron Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Byron Station.

August 8, 2024 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Néstor J. Féliz Adorno, Chief Engineering and Reactor Projects Branch Division of Operating Reactor Safety Docket No. 05000454 License No. NPF-37

Enclosure:

As stated

Inspection Report

Docket Number:

05000454

License Number:

NPF-37

Report Number:

05000454/2024011

Enterprise Identifier:

I-2024-011-0027

Licensee:

Constellation Energy Generation, LLC

Facility:

Byron Station

Location:

Byron, IL

Inspection Dates:

June 10, 2024 to June 28, 2024

Inspectors:

M. Abuhamdan, Reactor Inspector

J. Corujo-Sandin, Senior Reactor Inspector

M. Domke, Senior Reactor Inspector

A. Hobbs, Reactor Inspector

J. Park, Reactor Inspector

Approved By:

Néstor J. Féliz Adorno, Chief

Engineering and Reactor Projects Branch

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Phase 2 Post-Approval License Renewal at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Implement External Surfaces License Renewal Commitments as Described in the UFSAR.

Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000454/2024011-01 Open/Closed

[H.3] - Change Management 71003 The inspectors identified a Green finding and associated Non-cited Violation (NCV) of the Byron Station Unit 1 Operating License Condition 2.C.(23)(b)1. Specifically, the licensee failed to revise the procedures for planning insulation repairs prior to April 30,2024, to ensure that the repairs are performed in accordance with specification requirements to prevent water intrusion into the insulation, as described in the License Renewal UFSAR Supplement.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===71003 - Post-Approval Site Inspection for License Renewal The NRC conducted a Phase 2 Post-Approval Site Inspection for License Renewal in accordance with the License Renewal Inspection Program (LRIP). Per Inspection Manual Chapter 2516, the LRIP is the process used by the NRC staff to verify adequacy of aging management programs (AMPs), Time-Limited Aging Analyses (TLAAs), and other activities associated with an applicants request to renew an operating license of a commercial nuclear power plant for an additional 20 years beyond the original operating license period, as stipulated in Title 10 of the Code of Federal Regulations (CFR), Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants. This Phase 2 inspection was performed before the period of extended operation (PEO), which begins after midnight on October 31, 2024, for Unit 1, and on November 6, 2026, for Unit 2.

The inspectors assessed the licensees implementation and completion of the programs and activities described in regulatory commitments, Updated Final Safety Analysis Report (UFSAR)supplement program descriptions, TLAAs, and license conditions. They reviewed at least 70 percent of the available samples, with this percentage derived from considering the total samples available from both units. However, although most samples apply to both units, the review focused solely on the licensees implementation of license renewal activities in Unit 1 and did not include samples specific to Unit 2. A subsequent Phase 2 inspection may be conducted in accordance with the LRIP, which may review the licensees implementation of license renewal activities in Unit 2, as deemed necessary by regional management.

Post-Approval Site Inspection for License Renewal===

(1) A.2.1.1 ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD (XI.M1) and Commitment 1
(2) A.2.1.2 Water Chemistry (XI.M2) and Commitment 2
(3) A.2.1.3 Reactor Head Closure Stud Bolting (XI.M3) and Commitment 3
(4) A.2.1.4 Boric Acid Program (XI.M10) and Commitment 4
(5) A.2.1.5 Cracking of Nickel-Alloy and Loss of Material Due to Boric Acid-Induced Corrosion in Reactor Coolant Pressure Boundary Components (XI.M11B) and Commitment 5
(6) A.2.1.6 Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS)

(XI.M12) and Commitment 6

(7) A.2.1.7 PWR Vessel Internals (XI.M16A) and Commitment 7
(8) A.2.1.8 Flow-Accelerated Corrosion (XI.M17) and Commitment 8
(9) A.2.1.9 Bolting Integrity (XI.M18) and Commitment 9
(10) A.2.1.11 Open-Cycle Cooling Water System (XI.M20) and Commitment 11
(11) A.2.1.12 Closed Treated Water Systems (XI.M21A) and Commitment 12
(12) A.2.1.13 Inspection of Overhead Heavy Load and Light Load Handling Systems (XI.M23) and Commitment 13
(13) A.2.1.14 Compressed Air Monitoring (XI.M24) and Commitment 14
(14) A.2.1.16 Fire Water System (XI.M27) and Commitment 16
(15) A.2.1.17 Aboveground Metallic Tanks (XI.M29) and Commitment 17
(16) A.2.1.18 Fuel Oil Chemistry (XI.M30) and Commitment 18
(17) A.2.1.20 One-Time Inspection (XI.M32) and Commitment 20
(18) A.2.1.21 Selective Leaching (XI.M33) and Commitment 21
(19) A.2.1.23 External Surfaces Monitoring of Mechanical Components (XI.M36) and Commitment 23
(20) A.2.1.24 Flux Thimble Tube Inspection (XI.M37) and Commitment 24
(21) A.2.1.25 Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components (XI.M38) and Commitment 25
(22) A.2.1.28 Buried and Underground Piping (XI.M41) and Commitment 28
(23) A.2.1.29 ASME Section XI, Subsection IWE (XI.S1) and Commitment 29
(24) A.2.1.32 10 CFR Part 50, Appendix J (XI.S4) and Commitment 32
(25) A.2.1.34 Structures Monitoring (XI.S6) and Commitment 34
(26) A.2.1.36 Protective Coating Monitoring and Maintenance Program (XI.S8) and Commitment 36
(27) A.2.1.37 Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification (EQ) Requirements Program (XI.E1) and Commitment 37
(28) A.2.1.38 Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 EQ Requirements Used in Instrumentation Circuits (XI.E2) and Commitment 38
(29) A.2.1.39 Inaccessible Power Cables Not Subject to 10 CFR 50.49 EQ Requirements (XI.E3) and Commitment 39
(30) A.2.1.40 Metal-Enclosed Bus (XI.E4) and Commitment 40
(31) A.2.1.41 Fuse Holders (XI.E5) and commitment 41
(32) A.2.1.42 Electrical Cable Connections Not Subject To 10 CFR 50.49 EQ Requirements Inspection Program (XI.E6) and Commitment 42
(33) A.3.1.2 Concrete Containment Tendon Prestress (XI.S1) and Commitment 44
(34) A.2.1.45 EQ of Electrical Components (X.E1) and Commitment

INSPECTION RESULTS

Failure to Implement External Surfaces License Renewal Commitments as Described in the UFSAR.

Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000454/2024011-01 Open/Closed

[H.3] - Change Management 71003 The inspectors identified a Green finding and associated Non-cited Violation (NCV) of the Byron Station Unit 1 Operating License Condition 2.C.(23)(b)1. Specifically, the licensee failed to revise the procedures for planning insulation repairs prior to April 30,2024, to ensure that the repairs are performed in accordance with specification requirements to prevent water intrusion into the insulation, as described in the License Renewal UFSAR Supplement.

Description:

Condition 2.C.(23)(b)1 of the Byron Unit 1 Renewed Facility Operating License requires the licensee to implement AMPs by April 30, 2024. One of these AMPs is the External Surface Monitoring of Mechanical Components, a new program intended to manage the aging effects of metallic and elastomeric materials through periodic visual inspection of external surfaces for evidence of loss of material and cracking. This AMP is described in License Renewal UFSAR Supplement Appendix F, Section A.2.1.23. This section states:

The procedures for planning insulation repairs will be revised to document that insulation repairs are performed in accordance with specification requirements (e.g., seams on the bottom, overlapping seams) so as to prevent water intrusion into the insulation.

A similar statement is included in Commitment 23 of UFSAR Appendix F, Section A.5.0, Table A.5-1, License Renewal Commitment List.

Water intrusion into the insulation is undesirable as it can lead to undetected corrosion and degradation of SSCs in systems such as Auxiliary Feedwater, Safety Injection, and Service Water, potentially resulting in the failure of the SSC to perform intended functions.

The inspectors identified the specifications requirements to prevent water intrusion into insulation were not included on any active procedure for planning insulation repairs. A preliminary review by the licensee noted the specifications requirements were initially incorporated into Revision 10 of procedure MA-AA-716-010-1010, Maintenance Planning, Work Package Enhancement (MMC) Maintenance Modification Contractor. However, the specification requirements were removed in 2018 with Revision 11 and are not included in the current Revision 12, which became effective in 2020.

Corrective Actions: The licensee entered the deficiency into the corrective action program and is evaluating the actions required to restore compliance.

Corrective Action References: AR 04782957, NRC ID Ext Surf Monitoring AMP Action not Addressed

Performance Assessment:

Performance Deficiency: The licensees failure to revise, prior to April 30, 2024, the procedures for planning insulation repairs to document that insulation repairs are performed in accordance with specification requirements so as to prevent water intrusion into the insulation was contrary to Section A.2.1.23 of UFSAR Appendix F, and License Renewal Commitment Number 23 described in UFSAR Appendix F, Section A.5.0, Table A.5-1, and was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because if left uncorrected, it would have the potential to lead to a more significant safety concern. Specifically, the licenses failure to revise procedures for planning insulation repairs to prevent water intrusion into insulation would have the potential to result in deterioration of SSCs beneath the insulation which can subsequently lead to their failure to perform their safety functions.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors answered NO to all the screening question of the Mitigating Systems Exhibit 2. Specifically, the inspectors determined that this finding is of very low safety significance (Green) because the inspectors did not find any example of degraded conditions associated with this performance deficiency.

Cross-Cutting Aspect: H.3 - Change Management: Leaders use a systematic process for evaluating and implementing change so that nuclear safety remains the overriding priority.

Specifically, during a procedure revision, the licensee inadvertently deleted the required commitment language because a systematic process for ensuring the retention of such language was not utilized.

Enforcement:

Violation: License Condition 2.C.(23)(b)1 of Byron Station Unit 1 Renewed Facility Operating License No. NPF-37 states, The License Renewal UFSAR Supplement describes certain programs to be implemented and activities to be completed prior to the PEO. Additionally, it states, The licensee shall implement those new programs and enhancements to existing programs no later than April 30, 2024.

Appendix F of the UFSAR (aka, the License Renewal UFSAR Supplement), Section A.2.1.23, External Surface Monitoring of Mechanical Components AMP, and Commitment Number 23 from UFSAR Appendix F, Section A.5.0, Table A.5-1, License Renewal Commitment List, both state The procedures for planning insulation repairs will be revised to document that insulation repairs are performed in accordance with specification requirements (e.g., seams on the bottom, overlapping seams) so as to prevent water intrusion into the insulation.

Contrary to the above, the licensee failed to implement the new External Surfaces Monitoring of Mechanical Components program prior to April 30, 2024. Specifically, the licensee failed to revise procedures for planning insulation repairs to document that insulation repairs are performed in accordance with specification requirements so as to prevent water intrusion into the insulation as described in Section A.2.1.23 and Table A.5-1 of UFSAR Appendix F.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Minor Violation 71003 Failure to Implement License Renewal Commitment to Monitor Water Chemistry as Described in the UFSAR.

Minor Violation: The licensee failed to implement a program enhancement and commitment to perform periodic sampling, analysis, and trending of water chemistry for the essential service water makeup pumps engines glycol-based jacket water system. These activities were intended to verify the effectiveness of water chemistry control in mitigating aging effects.

This failure was contrary to UFSAR Appendix F, Section A.2.1.12, Closed Treated Water Systems AMP, and License Renewal Commitment Number 12 from UFSAR Appendix F, Section A.5.0, Table A.5-1, License Renewal Commitment List. Consequently, it was a performance deficiency.

Screening: The inspectors determined the performance deficiency was minor. Specifically, the licensee provided information regarding additional preventative maintenance activities scheduled during the PEO. These activities included periodic visual inspections of the jacket water heat exchangers and non-destructive examinations of the jacket water expansion tanks. These measures would enable the licensee to monitor the aging of the essential service water make up pumps engines.

Enforcement:

This failure to comply with the Byron Station Unit 1 Renewed Facility Operating License No. NPF-37, License Condition 2.C.(23)(b)1 constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.

Minor Violation 71003 License Renewal Commitment Not Implemented for Lubricants in All Pressure Retaining Bolted Joints Minor Violation: The licensee failed to implement a license renewal commitment to prohibit the application of lubricants that contain molybdenum disulfide (MoS2) on pressure retaining bolted joints. This was contrary to UFSAR Appendix F, Section A.2.1.9, Bolting Integrity AMP, and License Renewal Commitment Number 1 from UFSAR Appendix F, Section A.5.0, Table A.5-1, License Renewal Commitment List. The commitment stated, Prohibit the use of lubricants containing molybdenum disulfide on pressure retaining bolted joints. The licensee revised Procedure MA-AA-736-600, Torquing and Tightening of Bolted Connections, to incorporate this commitment in Step 3.2.15, which stated that lubricants containing MoS2 may result in stress corrosion cracking of bolted joints and therefore shall not be applied on structural bolts. The procedure scope addressed structural bolting but did not also include the committed pressure retaining bolted joints as described in the License Renewal UFSAR Supplement. The inspectors noted that maintenance procedures for the reactor head studs and containment air locks included the committed prohibition, but these procedures did not extend to all pressure-retaining bolted joints within the scope of license renewal. Consequently, the failure to implement the committed prohibition to all pressure retaining bolted joints within the scope of license renewal was a performance deficiency.

Screening: The inspectors determined the performance deficiency was minor. While the licensee did not prohibit the use of MoS2 lubricant to all pressure-retaining applications, they had some controls in place. Additionally, the inspectors did not find any instances of the prohibited lubricant being used in pressure-retaining bolting applications within the scope of license renewal.

Enforcement:

This failure to comply with the Byron Station Unit 1 Renewed Facility Operating License No. NPF-37, License Condition 2.C.(23)(b)1 constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.

Minor Violation 71003 License Renewal Commitment Not Adequately Implemented for Spent Fuel Pool (SFP)

Bridge Crane Periodic Inspection Minor Violation: The licensee failed to implement a license renewal commitment to perform periodic inspection of SFP Bridge Crane rails for wear and corrosion and the associated rail clip bolts for evidence of loss of preload. This was contrary to UFSAR Appendix F, Section A.2.1.13, Overhead Heavy Load and Light Load Handling Systems AMP, and License Renewal commitment number 1 from UFSAR Appendix F, Section A.5.0, Table A.5-1, License Renewal Commitment List. The commitment stated, in part, Consistently include

[] rails for loss of material due to wear and corrosion, and bolted connections for evidence of loss of preload. The licensee intended to implement this commitment in procedure 0BMSR FH-5, Spent Fuel Pool Bridge Crane Monthly/Yearly Inspection. However, the inspectors identified that the procedure did not incorporate these inspections; instead, it only required inspecting the bridge for visual cracks in wheels and tracks and checking bolts and nuts for looseness. Consequently, it was a performance deficiency.

Screening: The inspectors determined the performance deficiency was minor. Although the procedure did not include instructions to inspect for the specific aging mechanisms mentioned in the commitment, it did outline routine inspections that could reasonably identify these mechanisms. Additionally, the inspectors performed a walkdown of the SFP area and did not identify any concerns.

Enforcement:

This failure to comply with the Byron Station Unit 1 Renewed Facility Operating License No. NPF-37, License Condition 2.C.(23)(b)1 constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.

Observation: Unclear Procedures and Specifications for High-Strength Bolts 71003 The inspectors identified a process vulnerability in multiple AMPs related to controlling high-strength bolts (i.e., bolts with an actual measured yield strength of 150 ksi or greater).

The License Renewal UFSAR Supplement notes that several AMPs were enhanced to prohibit the use of high strength bolting for various applications. Examples of these AMPs include Reactor Head Closure Stud Bolting, Bolting Integrity, and the AMPs associated with ASME Section XI, Subsections IWF and IWE. The Byron aging management basis documents explain that this prohibition is intended to prevent stress corrosion cracking and bolting failures.

However, the inspectors found that the procedures for controlling high-strength bolting materials were unclear. For example, procedure SM-AA-300-1001 describes procurement engineering roles and, states consider the impact on License Renewal and Aging Management Programs during procurement. Other procedures provide generic guidance, such as consider license renewal requirements or contact the aging management coordinator. In contrast, industry guidance recommends processes like destructive testing or non-destructive testing to determine yield strengths beyond 150 ksi, or alternatively, enhanced monitoring or inspection for installations with high-strength bolts. Interviews with work order planners, procurement, strategic, and design engineers revealed lack of understanding of this guidance and its basis.

Additionally, the inspectors observed that Byron warehouses several high-strength bolt materials that must exceed 130 ksi yield strength to meet their material specifications.

However, these specifications do not prohibit exceeding 150 ksi. The difference between these specification minimums and the aging management limits for controlling stress corrosion cracking is relatively small.

The inspectors did not identify any high-strength bolt installations within the scope of license renewal at Byron. Consequently, this is an inspection observation.

Observation: Lack of Age Tracking for Fire Sprinkler Heads 71003 The inspectors noted that the licensee was not tracking the ages of fire sprinkler heads, despite a commitment to replace or test those older than 50 years. License Renewal Commitment 16.1 specifies that sprinkler heads older than 50 years would be replaced or tested according to the National Fire Protection Association (NFPA) Code 25 at the 50-year in-service date and every 10 years thereafter. Since Byron Station is less than 50 years old, no sprinkler heads are currently beyond this age. This observation was documented the licensees corrective action program as IR 04782644, NRC ID: 50 Year Fire Protection Sprinkler Testing Due Date Error.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 28, 2024, the inspectors presented the Phase 2 Post-Approval License Renewal results to Shane Harvey, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

01417251

Liner Plate Metal Loss More Than 10%

09/23/2012

04029125

Fire Protection System Leakage Greater Than Maximum

Allowed

07/06/2017

284197

Acceptance Criteria Not Met -0BOSR FP-9

10/02/2019

04345230

LR - Containment Tendon Tunnel Concrete Investigation

05/22/2020

04379761

1FP250B Inlet Pressure Gauge Showing Low

10/27/2020

04418734

Fire Protection Sprinkler Inlet Pressure Gauge Reading High

04/24/2021

04427315

Corrosion on 0SX138A

06/03/2021

04446029

UAT 141-1 FP Nozzles Clogged

09/13/2021

04463282

2PI-FP8001B Showing Incorrect Indication

11/27/2021

04493807

B2R23 BACC Mode 3 Walkdown Minor, Inactive Leaks

04/18/2022

04495845

New WO Required per OTI AMP

04/27/2022

04500830

1FP248A Leaking

05/19/2022

04515818

Update Needed for LRR #7 - PWR Vessel Internals

08/09/2022

04519699

Corrosion Found During Unit 2 Instrument Air Dryer Tower

Internal Inspection

08/30/2022

04535345

LR Inspection for Corrosion Under Insulation - 2DO12MB

11/07/2022

04553263

0PR34J Indicates Monitor Loss of RM23 Communication

2/07/2023

04559036

Unit 1 Tendon Tunnel Structures Monitoring Observations

03/03/2023

04559721

B1R25 BACC Mode 3 Walkdown Results

03/06/2023

04559759

UAT 141-2 Deluge Solenoid Sticking Closed

03/06/2023

04559776

1E MPT 1BOSR FP-R1 Partially Clogged Nozzles

03/06/2023

04559783

1W MPT 1BOSR FP-R1 Issues

03/06/2023

04559785

UAT 141-1 1BOSR FP-R1 Issues

03/06/2023

04559786

UAT 141-2 1BOSR FP-R1

03/06/2023

04699483

1A Diesel Oil Storage Tank Coating Degradation

08/30/2023

04709385

B2R24 - Degraded Concrete Identified During Containment

Inspection

10/13/2023

04709596

FP Drain Valve 2FP5028 Leak-by Intensified

10/14/2023

04712981

Acceptance Criteria Not Met -0BOSR FP-9

10/27/2023

71003

Corrective Action

Documents

04715184

Unit 1 CAF FP Connection Degraded

11/03/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

04725659

Spurious Actuation of Fire Suppression Zone 1S-23

2/27/2023

04754367

LR Selective Leaching Results to WO 1870582

Valve 1FP120A

2/29/2024

04754373

LR Selective Leaching Results to WO 01871199

Valve 1FP120F

2/29/2024

04759353

LR Selective Leaching Results to WO 01874620

HX 1DG01KA-X2

03/19/2024

04767040

LR Documentation of Clarification for Above Ground Tanks

AMP

04/17/2024

04775495

Acceptance Criteria Not Met -0BOSR FP-9

05/21/2024

04780446

NRC ID Procedure Updates Needed for Byron Bolting Integrity

AMP 09

06/13/2024

04780447

NRC ID: Procedure Updates Needed for Byron Bolting Integrity

AMP 09

06/13/2024

04780458

NRC LR - Procedure Change Required per NSAC-202L Rev

06/13/2024

04780739

NRC ID - Moisture Found at Base of Condensate Storage

Tanks

06/14/2024

04781277

Water in Cable Vault 1M1V

06/17/2024

04781684

NRC ID: Work Order Closure Documentation for Crane

Surveillance

06/19/2024

04782644

NRC Identified - 50 Year Fire Protection Sprinkler Testing Due

Date Error

06/24/2024

04782646

No Record for Superseded AMP Implementing Procedure

06/24/2024

04782957

NRC ID External Surfaces Monitoring AMP Action Not

Addressed

06/25/2024

04782995

NRC ID: Process Enhancement for 0BMSR FH-5 Inspection

06/25/2024

04783252

Hole by SXCT Basin - NRC Walkdown

06/26/2024

04783253

NRC ID External Surfaces Monitoring AMP Actions Completed

Early

06/26/2024

04783265

0SX03CA Manway Bolt Loose - NRC Walkdown

06/26/2024

04783273

0SX10BA Needs Paint/Coating - NRC Walkdown

06/26/2024

04783403

0B WS Pump Safety Guard - NRC Walkdown

06/27/2024

Corrective Action

Documents

Resulting from

Inspection

04783408

NRC ID: Process Enhancements Needed for Bolting Integrity

AMP 09

06/27/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

04783496

Saran Wrap with Paint Removal Left on SX Pipes for 9MO

06/27/2024

04783520

NRC ID Sampling/Trending Needed of SX Makeup Pump

Jacket Water

06/27/2024

6E-0-1003

Duct Runs Outdoor Plan Southeast Area

AC

6E-0-1096

Duct Runs Manhole Details

07/20/1999

6E-0-3597

Electrical Installation Manholes 1V, IW, 1X, 2V, & 2W Racks

Plans & Sections

W

6E-0-3681

Duct Run Routing Outdoor-East of Station

AM

6E-1-3478

Electrical Installation Turbine Building

03/29/1999

6E-1-3653

Cable Pan Routing Turbine Building

AB

Drawings

LR-BYR-M-42

License Renewal Boundary Drawing Diagram of Essential

Service Water Units 1 & 2

16-085

Revise UFSAR APPENDIX F to incorporate NSAC 202L-R4 for

the Flow Accelerated Corrosion (FAC) Program

07/28/2020

17-041

Revise UFSAR Appendix F, Section A,2, 1,3 to Reflect the

Implementation of the Updated EPRI Pressurized Water

Reactor Secondary Guidelines, Revision 8, at Byron and

Braidwood

04/13/2020

367510

Abandon Acid/Caustic Feeds to SRST and CHT

380775

MSIP Alloy 600 U2 HL/CL Nozzle Mitigation

401438

Unit 2 Steam Generator Bowl Drain Weld Repair Alternate

Detail

Engineering

Changes

639394

Byron 2: LR Commitment #10-SG Divider Plate PWSCC

1367641-68

Engineering Technical Evaluation to Determine the Potential

Susceptibility of Cast Austenitic Stainless Steel at Byron and

Braidwood, Units 1 and 2

11/12/2015

630473

B1R23 SG Pre-Mode 4/Final Condition

Monitoring & Operational Assessment

BYR-06220

Selective Leaching Examination of Gray Cast Iron Valves

1FP120D, 1FP120E, 1FP120F, 1FP120A, 1FP120B

2/28/2024

Engineering

Evaluations

BYR-99310

Selective Leaching Evaluation of Heat Exchanger Tubes and

End Plates

03/14/2024

Miscellaneous

Test Plan: CompWorks: FACWorks Setup System Test

(8.8 R 1.7) (V&V)

06/13/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

246735

Receipt Inspection Package for Catalog ID 1425371-1

05/09/2018

254906

Receipt Inspection Package for Catalog ID 1425352-1

2/27/2019

256269

Receipt Inspection Package for Catalog ID 1425371-1

04/03/2019

298707, 299856,

and 301054

Receipt Inspection Packages for Material Catalog

ID 1834076-1

BB-PBD-AMP-

XI.M17

Program Basis Document - Flow-Accelerated Corrosion

BB-PBD-AMP-

XI.M2

Program Basis Document - Water Chemistry

BB-PBD-AMP-

XI.M29

Program Basis Document - Aboveground Metallic Tanks

BB-PBD-AMP-

XI.M36

Program Basis Document - External Surface Monitoring of

Mechanical Components

BB-PBD-AMP-

XI.S4

Program Basis Document - 10 CFR Part 50, Appendix J

BY-SSBD-OTI

One-Time Inspection Sample Basis Document

Diesel Fuel Oil

Storage Tanks:

Tank (1DO01TB);

Tank (1DO02TB);

Tank (1DO01TD)

SAFETY

RELATED,

SERVICE LEVEL

III Interior

Protective

Coatings (Lining)

NUC2300035-L-CAR-001

05/24/2023

EQ-BB-010

Environmental Qualification of Anchor Darling Gate Isolation

Valves

6B

EQ-BB-ESE-48A

Environmental Qualification of ITT Barton High Volume

Pressure Sensor Model 353

EQ-BB-ESE-48A

Environmental Qualification of ITT Barton High Volume

Pressure Sensor Model 353

5A

EQDP-MECH

Pumps and Valves

11B

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NE-12-22-17

Cable and Connection Inspection Summary Report

21-MT-005

Unit 1 Reactor Cavity Hoist Hook

09/13/2021

21-MT-006

Unit 1 Containment Jib Crane - Jib 24

09/13/2021

21-MT-007

Unit 1 Manipulator Crane Hook

09/13/2021

21-MT-011

Unit 1 Polar Crane Main Hook and Auxiliary Hook

09/13/2021

22-031

MT Exam Report for Unit 1 Turbine Building Main and Auxiliary

Crane Hooks

05/23/2022

22-069

MT Exam Report for Unit 0 Spent Fuel Pool Bridge Crane

Hooks

09/30/2022

22-090

MT Exam Report for Unit 0 Fuel Handling Building Main and

Auxiliary Hooks

2/06/2022

23-039

MT Exam Report for Unit 1 Turbine Building Main and Auxiliary

Crane Hooks

05/15/2023

23-092

MT Exam Report for Unit 0 Spent Fuel Pool Bridge Crane

Hooks

09/21/2023

23-124

MT Exam Report for Unit 0 Fuel Handling Building Main and

Auxiliary Hooks

11/21/2023

23-MT-001

Unit 1 Containment Jib Crane Hook

03/07/2023

23-MT-005

Unit 1 Reactor Cavity Hoist Hook

03/06/2023

NDE Reports

23-MT-007

Unit 1 Polar Crane Hook and Auxiliary Hook

03/06/2023

Operability

Evaluations

2-001

Reactor Head Penetration Number 75

0BMSR FH-5

Spent Fuel Pool Bridge Crane Monthly/Yearly Inspection

0BMSR HC-3

Fuel Handling Building Overhead Traveling Bridge Crane

Monthly/Yearly Inspection

0BMSR HC-83

Containment Jib Crane (JIB 24 or 25) Inspection

0BOSR FP-12

Unit Zero Fire System Leakage Trace

0BOSR FP-9

Unit Zero Fire Protection System Leakage

1/2BMSR XII-11

Unit 1/2 Containment Building Interior Surface Coating

Inspection

1BMSR HC-22

Reactor Cavity Hoist Monthly/Annual Inspection

1BMSR HC-42

RHR Heat Exchanger Hoist Monthly/Annual Inspection

Procedures

1BVSR 4.f.2-7

Unit One Visual Examination of the Reactor Pressure Vessel

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Interior

1BVSR XII-7

Non-Technical Specification Eddy Current Testing of Incore

Thimble Tubes

BIP 2500-119

Calibration of General Atomics Radiation Monitoring

Assemblies and RD-8 Ionization Chamber Detector (AR)

BIP 2500-135

Calibration of Particular Iodine and Gas (PIG) Process

Radiation Monitor (PR)

BISR 3.7.3-200

Surveillance Calibration of Particular Iodine and Gas (PIG)

Process Radiation Monitor

BISR 3.8.3-200

Surveillance Calibration of Fuel Building Fuel Handling Incident

Radiation Monitor

BISR 3.i.2-200

Surveillance Calibration of Auxiliary Building Vent Stack Wide

Range Gas Radiation Monitor (PR)

BMP 3118-1

Reactor Vessel Closure Head Removal

BMP 3118-30

Maintenance Containment Personnel Airlock Surveillance

BMP 3118-31

Containment Airlock Maintenance, Repair and Adjustment

BMP 3118-7

Reactor Vessel Closure Head Installation

BMP 3122-4

Essential Service Water Make-Up Repair

BMSR HC-2

Turbine Building Overhead Traveling Bridge Crane

Monthly/Yearly Inspection

BOP DO-300-3

Sampling U-1/2 Standby Diesel Generators Day Tanks

(DO02TA, B)

BOP DO-300-7

Sampling A/B Essential Service Water Diesel Fuel Oil Tank

(0DO08TA, B)

BVP 700-301

Byron One-Time Inspection Requirements and Guidelines

CC-AA-102

Design Input and Configuration Change Impact Screening

CC-AA-203

Environmental Qualification Program

CC-AA-205

Control of Undocumented/Unqualified Coatings Inside the

Containment

CY-AA-120-400

Closed Cooling Water Chemistry

CY-AA-120-4000

Closed Cooling Water Chemistry Strategic Plan

CY-AP-120-1000

Primary Strategic Water Chemistry Plan

CY-AP-120-1000-

F-02

Byron Primary Strategic Water Chemistry Plan

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CY-AP-120-200

Recirculating Steam Generator Chemistry for Braidwood,

Byron, and Ginna

CY-AP-120-2000

PWR Secondary Strategic Water Chemistry Plan

CY-AP-120-2000-

F-02

Byron Secondary Strategic Water Chemistry Plan

ER-AA-2030

Conduct of Equipment Reliability Manual

ER-AA-300-120

Electrical Cable Connections Not Subject to 10 CFR 50.49

Environmental Qualification Requirements Program

ER-AA-300-130

License Renewal Fuse Holders Program

ER-AA-300-140

License Renewal Metal Enclosed Bus Program

ER-AA-300-150

Cable Condition Monitoring Program

ER-AA-330

Conduct of Inservice Inspection Activities

ER-AA-330-002

Inservice Inspection of Section XI Welds and Components

ER-AA-330-006

Inservice Inspection and Testing of The Pre-Stressed Concrete

Containment Post Tensioning Systems

013

ER-AA-330-008

Safety-Related (Service Level I) Protective Coatings

ER-AA-330-009

ASME Section XI Repair/Replacement Program

ER-AA-330-013

Thermal Aging Embrittlement of CASS Aging Management

Program

ER-AA-330-014

Safety-Related (Service Level III) Coatings

ER-AA-380

Primary Containment Leakrate Testing Program

ER-AA-430

Conduct of Flow Accelerated Corrosion Activities

ER-AA-430-1001

Guidelines For Flow Accelerated Corrosion Activities

ER-AA-450

Structures Monitoring

ER-AA-5400

Buried Piping and Raw Water Integrity Management Programs

Guide

ER-AA-5400-

1002

Underground Piping and Tank Examination Guide

ER-AA-5400-

1004

Cathodic Protection System Management Guide

ER-AA-700-1002

CFR 54.37(b) Review Process

ER-AA-700-1004

License Renewal Requirements Management

ER-AA-700-301

License Renewal One-Time Inspection Program

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ER-AA-700-401

Selective Leaching Aging Management

ER-AA-700-402

External Surfaces Monitoring of Mechanical Components

Aging Management Program

ER-AA-700-403

Inspection of Internal Surfaces In

Miscellaneous Piping and Ducting Components

Aging Management Program

ER-AA-700-404

Aging Management Program for Aboveground Metallic Tanks

ER-AP-330-1001

Alloy 600 Management Plan

ER-AP-331

Boric Acid Corrosion Control (BACC) Program

ER-AP-331-1001

Boric Acid Corrosion Control (BACC) Inspection Locations,

Implementation and Inspection Guidelines

ER-AP-331-1002

Boric Acid Corrosion Control (BACC) Program Identification,

Screening, and Evaluation

ER-AP-331-1003

RCS Leakage Monitoring and Action Plan

ER-AP-331-1005

Boric Acid Corrosion Control (BACC) Program Performance

Indicators

ER-AP-333

Pressurized Water Reactor Internals Management Program

ER-AP-333-1001

Pressurized Water Reactor (PWR) Internals Program

ER-AP-420

Steam Generator Management Guidelines

ER-AP-420-001

Byron/Braidwood/Ginna Unit 1 and Calvert Cliffs Units 1 & 2:

Steam Generator Eddy Current Activities

ER-BY-450

Byron Structures Monitoring Program

MA-AA-410

Bolting Integrity Aging Management Program

MA-AA-716-010

Maintenance Planning

MA-AA-716-010-

1010

Maintenance Planning, Work Package Enhancement (MMC)

Maintenance Modification Contractor

MA-AA-716-010-

1010

Maintenance Planning, Work Package Enhancement (MMC)

Maintenance Modification Contractor

MA-AA-716-230-

1003

Thermography Program Guide

MA-AA-723-500

Inspection of Non EQ Cables and Connections for Managing

Adverse Localized Environments

MA-AA-736-600

Torquing and Tightening of Bolted Connections

MA-AP-733-381

Polar Crane Monthly/Yearly Inspection

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

MA-BY-725-515

Preventive Maintenance of Non-Segregated Bus Duct

NF-AP-100-7000

Westinghouse NSSS Reload Design Control Implementation

PES-S-010

Fasteners

SM-AA-300-1001

Procurement Engineering Process and Responsibilities

01576914-01

B1R19 Partially Remove Moisture Barrier

03/20/2014

01576914-02

EPP Perform Visual Inspections

07/10/2014

01817943

Non-Tech Spec Eddy Current Testing of Incore Thimble Tubes

10/13/2017

01830163

LR WW Pump 10 Year Rebuild & Submerged Bolting

Inspection

11/07/2022

01837207

LR-OTI AUX Feedwater SYS INSP

10/31/2018

01837674

LR-OTI AUX Feedwater SYS INSP

10/31/2018

01838563

LR-OTI 1B AUX Feedwater Pump SYS INSP

10/31/2018

01838964

LR-OTI AUX Feedwater SYS INSP

10/31/2018

01840997

LR-OTI AUX Feedwater SYS INSP

09/20/2018

01840997

LR-OTI AUX Feedwater SYS INSP

09/20/2018

01842114

LR-OTI Emergency DG & AUX. System

10/11/2023

01846094

LR-OTI Residual Heat Removal System

2/21/2018

01846095

LR-OTI Residual Heat Removal System

04/27/2022

01852643

LR-OTI Fuel Oil System Inspections

10/18/2023

01852682

LR-OTI Fuel Oil System Inspections

08/31/2023

01852684

LR Clean/Inspect DO Storage Tank

08/31/2023

01860631

00104334-01, PMNS, Clean, Inspect And-Tighten Connections

In Switcchgear C, E:1AP72E,N/A, T10

11/24/2020

01864128

LR Coating Underground SX Pipe in Vacuum Breaker Vaults

09/07/2017

01864233

LR Coat Underground SX Pipe in Vacuum Breaker Vaults

09/09/2017

01864240

LR Coat Underground SX Pipe in Vacuum Breaker Vaults:

EWP MM-LR Remove Corrosion and Apply Coating 0SX169E

(A Train): 0SX169E: V25

09/17/2017

01872705-01

EP LR Evaluate Structures Monitoring Enhancement 16 U1

Tendon Tunnel

10/25/2022

01874339

LR-4.1 KV Non-Seg Bus/Duct Inspection and Testing of Bus

09/20/2021

Work Orders

01882431-1

  • MODEL WO Instructions* EP LR Perform Internal Surface

Inspection (0TWXXX)

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

01897100

LR Underground Stainless Steel Pipe Inspections

04/02/2024

01939322

LR-FP System Leakage

07/06/2017

01965482

Replace Starter/Contactor and Thermal Overload Relay

03/08/2023

04580462

00175130-06, COM, LR Perform 6 YR Major Overhaul

(1A SAC), E: 1SA10CA, CMPA

06/05/2019

04686229-01

EWP-MM Drill Core Holes for LR Inspection

10/18/2019

04735911

LR-Containment Vessel Tendon Test (FREQ 1 YR, 3 YR, 5)

1/10/2020

04765929-01

LR Flush and Inspect 0DO05T

2/16/2023

04830934

Replace Diaphragm

03/16/2020

04831589

LR-Non-Tech Spec Eddy Current Testing Incore Thimble

Tubes

3/10/2020

04847270

LR-Piping Penetration Radiation Monitor LOOP 1AR-025

11/11/2020

04870549

00099793-01, PMSR, LR-Control Room Turbine Building Air

Intake B Rad Mon LOOP 0P, E: 0PR-038,ILRD

2/15/2021

04870549-01

LR-Control Room Turbine Building Air Intake B

Rad Mon LOOP 0P

06/09/2023

04932698-01

EP LR IWL Visual Inspection of Containment Concrete

Surfaces

04/06/2022

04940957-01

LR-Diesel Generator Non-Seg Bus Duct Inspection

Inspection/Test

2/09/2020

04960099-01

LR-Inspect Vault 1ME

11/04/2020

04967725-02

LR-2AP02E Clean & Inspect 4KV Non Seg Bus Duct (Outside)

SAT 242-1

05/04/2021

05020336-01

EWP LR-MM Perform Surveillance for U1 Reactor Cavity Hoist

09/13/2021

05020539

00098431-01, PMNS, Clean, Inspect and Tighten Connections

in Transformer, E: 0AP02E, N/A, T10

09/17/2021

05020763

1B PORV Accumulator 1RY32MB Air Inlet 2nd Check Valve

09/16/2021

05023025-01

EWP LR-MM Perform Surveillance for U1 Polar Crane

09/14/2021

05025522

00122361-01, COM, LR-Unit 1 Transformer Deluge Flush

(MPTs -UATs), W: 1BOSR FP-R1

09/13/2021

05062666

LR - Class 2 and 3 Bolted Connection Inspections - Auxiliary

Building

04/04/2022

05086249-01

EWP LR-MM 1HC83G - Unsecure & Inspect Hoist/Jib Crane

09/13/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

05091558

LR -General Class 1 Bolted Connection Inspection

04/19/2022

05091780

LR-Containment Building Interior Surface Coating Inspection

04/27/2022

05092437

LR-Non-Tech Spec Eddy Current Testing Incore Thimble

Tubes

8/18/2022

05093599-01

LR-Inspect Vault 0B1

10/05/2021

05095465-01

LR-Inspect Vault 1ME

10/18/2021

05099450-01

LR-Inspect Vault 0A2

10/12/2021

05099451-01

LR-Inspect Vault 0A1

10/12/2021

05104273-01

LR-Inspect Vault 1MC

2/23/2021

05108289-01

LR-Inspect Vault 1J2

10/14/2021

05108290-01

LR-Inspect Vault 1G1

10/14/2021

05111607

LR Perform 18M PM on the Instrument Air Dryer

2/15/2022

05119368

LR-Perform UT Test for Wall Thickness of Line 0SX79AB-6

04/05/2024

05121410-01

18M Battery Surveillance

08/29/2022

05123499-01

DEM LR Diver Inspection at CWPH 2A CW Pump Bay

per ER-AA-450

03/20/2024

05123500-01

DEM LR Diver Inspection at CWPH 1A CW Pump Bay

per ER-AA-450

04/06/2023

05123500-01

LR Diver Inspection at CWPH 1A CW Pump Bay

per ER-AA-450

04/06/2023

05130494-01

LR-Inspect Vault 1MC

06/02/2021

05134793-01

LR-Inspect Vault 0B2

09/08/2021

05135933-01

LR-Control Room Turbine Building Air Intake A

Rad Mon LOOP 0P

2/02/2022

05136977

00104333-06, PMNS, (NEIL)- Perform Preventive Maintenance

Inspections and TE STI, E: 1AP71E, N/A, T10

09/16/2022

05139358

LR Support Instrument Air Receiver Internal Inspection

01/09/2023

05139673

Clean, Inspect and Tighten Connections in Transformer

06/06/2023

05151009

LR E2 Program 10 Year Report

2/21/2023

05154845-01

LR-Inspect Vault 1H2

10/14/2021

05158207-01

LR-Inspect Vault 1MC

08/31/2021

05162419-01

LR-Inspect Vault 1MP

08/25/2021

05164417-01

LR-Inspect Vault 1MD

06/29/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

05166254-01

LR-Inspect Vault 1MD

07/07/2021

05170425-01

LR-Inspect Vault 1MD

01/04/2022

05183651-01

LR-Inspect Vault 1MC

11/29/2021

05185057-01

EWP LR-MM Perform Surveillance and Lubrication for

U1 Turbine Crane Annual Inspection

05/25/2022

05187017-01

LR-Inspect Vault 1MP

11/23/2021

05188132

00104317-01, PMNS, Clean, Inspect and Tighten Connections

in Switchgear, E: 1AP19E, N/A, T10

03/11/2023

05188340

00098440-01, PMNS, Clean, Inspect and Tighten Connections

in Transformer, E: 0AP0SE, N/A, T10

03/10/2023

05188532-01

DEM LR Perform Flume Diver Rel. Structural Monitoring

Inspection

04/06/2023

05188533-01

DEM LR Perform U1 NDCT CW Basin Structural Monitoring

Inspection

04/17/2023

05193635-01

LR-Inspect Vault 1MF

2/16/2022

05196537

LR-Containment Building Interior Surface Coating Inspection

03/17/2023

201505-01

LR-Inspect Vault 0B1

10/03/2022

203206-01

EWP MM - 0FH05G Spent Fuel Pool Bridge Crane Inspection

09/30/2022

203984-01

LR-Inspect Vault 0A1

10/11/2022

203985-01

LR-Inspect Vault 1J2

10/17/2022

203986-01

LR-Inspect Vault 1G1

10/17/2022

203987-01

LR-Inspect Vault 0A2

10/11/2022

206522-01

LR-Inspect Vault 1H2

05/24/2022

209556-01

LR-Inspect Vault 1MC

03/01/2022

214013-01

LR-Inspect Vault 1MP

03/15/2022

220652

00108310-01, PMNS, (NEIL)- EM Inspections and Support for

Main Generator Work, E: 1MP06E, N/A, G15

03/21/2023

225118

LR -U1 (RC-1-1) Post Outage Mode 3 Walkdown

03/23/2023

225119

00122361-01, COM, NEIL - LR Unit 1 Transformer Deluge

Flush (MPTs-UATs), W: 1BOSR FP-R1

03/06/2023

226967-01

LR-Cal of Aux Bldg Vent Stack Wide Range Gas

Rad Monitor PR

10/09/2023

230892

00120616-01, COM, NEIL - LR Deluge System Visual

01/29/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Inspection and Main Drain Test Surveillance

231357-01

LR-Inspect Vault 1ME

08/16/2022

231369-01

LR-Inspect Vault 1MD

07/13/2022

236851-01

EWP LR-MM Perform Surveillance for U1 Polar Crane

03/06/2023

239088-01

LR-Inspect Vault 1MC

06/01/2022

242790-01

LR-Inspect Vault 1MP

06/15/2022

24340

00120596-01, COM, LR-FP System Leakage, W: 0BOSR FP-9

10/18/2022

243931-01

EWP LR-MM Perform Surveillance for U1 Reactor Cavity Hoist

03/06/2023

244307-01

EWP LR-MM 1HC83G - Inspect Hoist/Jib Crane

03/05/2023

252494-01

LR-Inspect Vault 0B2

09/07/2022

252984-01

LR-Cal of Aux Bldg Vent Stack Wide Range Gas

Rad Monitor PR

2/21/2023

263956-01

EWP LR-MM Perform Surveillance and Lubrication for

U1 Turbine Crane Annual Inspection

07/24/2023

263971-01

LR-Inspect Vault 1H2

10/17/2022

267956-01

LR-Inspect Vault 1MC

08/28/2022

269138-01

LR-Control Room Turbine Building Air Intake B

Rad Mon LOOP

11/21/2023

269745-01

LR-Inspect Vault 1MP

09/14/2022

278651-01

LR-Inspect Vault 1MD

01/04/2023

29571-01

EWP LR MM - Perform Annual Surveillance and Lube Sample

for FHB Overhead Bridge Crane

2/08/2022

298820-01

EWP LR MM - 0FH05G Spent Fuel Pool Bridge Crane

Inspection

09/27/2023

05301875-01

LR-Inspect Vault 1MK

08/15/2023

05301876-01

LR-Inspect Vault 1ME

08/15/2023

05303568-01

LR-Inspect Vault 0A1

10/03/2023

05303569-01

LR-Inspect Vault 0B1

10/03/2023

05303570-01

LR-Inspect Vault 0A2

10/03/2023

05304101

00120596-01, COM, LR-FP System Leakage, W: 0BOSR FP-9

10/27/2023

05315756-01

EP LR Review Tendon Tunnel Results to Identify Containment

Liner Implications

03/28/2023

05319749-01

EWP LR MM - Perform Annual Surveillance and Lube Sample

11/23/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

for FHB Overhead Bridge Crane

05326479

LR Perform 18M PM on the Instrument Air Dryer

07/21/2023

05332323

NEIL-LR-Deluge System Visual Inspection and Main Drain

Test Surveillance

01/28/2024

05337883

LR Electric Cable and Connection Inspection U1

03/22/2024

05339789

LR Perform 18M PM on the Instrument Air Dryer

03/06/2024

05360533

NEIL-LR-Sprinkler System Visual Inspection and Main Drain

Test

07/16/2023

05378812-01

LR-Control Room Turbine Building Air Intake B

Rad Mon LOOP 0P

04/11/2024

05386577

NEIL-LR-Sprinkler System Visual Inspection and Main Drain

Test

10/14/2023

05396587-01

LR-Inspect Vault 1MC

2/04/2023

05400365-01

LR-Inspect Vault 1MP

11/22/2023

05415301

NEIL-LR-Sprinkler System Visual and Main Drain Test

01/03/2024

05419825

00120596-01, COM, LR-FP System Leakage, W: 0BOSR FP-9

05/21/2024

05433505

LR WO Needed for Coating Lines in 0SX161A Pit

04/05/2024

05443188

LR-0A SX M/U PP Battery Charger #1 Thermography

03/05/2024

05443189

LR-0B SX M/U PP Battery Charger #1 Thermography

03/08/2024

05443190

LR-0B SX M/U PP Battery Charger #2 Thermography

03/08/2024

05443192

LR-0A SX M/U PP Battery Charger #2 Thermography

03/05/2024

05519689

Create WR to Perform LR BP Inspection on 0WW01AB-8

04/19/2024

05519692

Create WR to Perform LR BP Inspection on 0WW07AB-8

04/19/2024

99142916-19

  • MODEL WO* LR-U1 - Containment Vessel

Tendon Test

6/12/2024