April 21, 2021
SUBJECT:
BYRON STATION - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000454/2021501 AND 05000455/2021501
Dear Mr. Rhoades:
On March 26, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station and discussed the results of this inspection with Mr. H. Welt and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Patricia J. Pelke
Digitally signed by Patricia J. Pelke Date: 2021.04.21 10:12:44 -05'00'
Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety
Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000454 and 05000455
License Numbers:
Report Numbers:
05000454/2021501 and 05000455/2021501
Enterprise Identifier: I-2021-501-0010
Licensee:
Exelon Generation Company, LLC
Facility:
Byron Station
Location:
Byron, IL
Inspection Dates:
March 22, 2021 to March 26, 2021
Inspectors:
J. Dalzell, Reactor Inspector
M. Garza, Emergency Preparedness Inspector
G. Hansen, Senior Emergency Preparedness Inspector
P. Smagacz, Resident Inspector
Approved By:
Patricia J. Pelke, Chief
Operations Branch
Division of Reactor Safety
Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness biennial exercise inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
- (1) The inspectors evaluated the biennial emergency plan exercise on March 23, 2021. The exercise scenario simulated an event at Byron Station that initiated with the declaration and notification of an Alert in response to the failure of an automatic trip to shut down the reactor, and subsequent manual actions taken at the reactor control consoles were not successful in shutting down the reactor. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
71114.08 - Exercise Evaluation Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
- (1) The inspectors reviewed and evaluated the proposed scenario for the biennial emergency plan exercise on February 18,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (IP Section 03.12)===
- (1) July 01, 2020 through December 31, 2020
EP02: ERO Drill Participation (IP Section 03.13) (1 Sample)
- (1) July 01, 2020 through December 31, 2020
EP03: Alert & Notification System Reliability (IP Section 03.14) (1 Sample)
- (1) July 01, 2020 through December 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On March 26, 2021, the inspectors presented the emergency preparedness biennial exercise inspection results to Mr. H. Welt and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Byron 2019 EP NRC Graded Exercise - Facilities/Equip
Issues
10/29/2019
Byron ERO Duty Team Member Qualification Lapse
01/01/2020
MET Tower 250 Ft Wind Speed Instrument Failure
01/10/2020
EP-Ogle County Sheriff / EOC did not Respond on NARS
Rollcall
04/06/2020
RSH seismic monitor has improper indication
06/04/2020
Byron 2020 HP Drill - Lessons Learned
06/12/2020
NRC (ENS) Red Phone Not Working in MCR
07/30/2020
Ogle County failed to respond to NARS roll call test
08/03/2020
250FT wind direction Y4005 computer point failed
08/15/2020
Byron EP 2020 Off-Year Exercise - SCR Performance
08/25/2020
Byron EP 2020 Off-Year Exercise - TSC Performance
08/25/2020
Byron EP 2020 Off-Year Exercise - OSC Performance
08/25/2020
EP Communicator Qualification
09/25/2020
NRC RED phone in the MCR
10/09/2020
ERO Members Miss Annual EP Training Sessions
2/03/2020
ERO Vacancies Identified - New Members Needed
2/14/2020
Miscellaneous
Two Years of Drill and Exercise Evaluation Results
03/01/2019 -
03/26/2021
PowerPoint Presentation; Byron Biennial Exercise - Exercise
Evaluation Results
03/26/2021
Byron 2019 NRC Graded Exercise Evaluation Report
11/19/2019
Byron 2021 Emergency Preparedness Biennial Exercise
Scenario
01/21/2020
Procedures
Exelon Nuclear Standardized Radiological Emergency Plan
Exelon Nuclear Radiological Emergency Plan Annex for
Byron Station
Addendum 3
Exelon Nuclear Emergency Action Levels for Byron Station
Dose Assessment
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Core Damage Assessment
Emergency Classification and Protective Action
Recommendations
Emergency Response Organization (ERO) / Emergency
Response Facility (ERF) Activation and Operation
Control Room Operations
TSC Activation and Operation
OSC Activation and Operation
EOF Activation and Operation
Personnel Protective Actions
Notifications
Miscellaneous
Byron Station 2021 Emergency Preparedness Biennial
Exercise Scenario
01/21/2020
71151
Miscellaneous
NRC PI Data Sheets; NRC Indicator Alert Notification System
(ANS) Reliability
07/01/2020 -
2/31/2020
NRC PI Data Sheets; NRC Indicator Drill and Exercise
Performance (DEP)
07/01/2020 -
2/31/2020
NRC PI Data Sheets; Emergency Response Organization
(ERO) Readiness
07/01/2020 -
2/31/2020
Regulatory Assessment Performance Indicator Guideline