MONTHYEARIR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements IR 05000454/20235012023-08-31031 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 IR 05000454/20234022023-07-18018 July 2023 Baseline Security Inspection Document; 05000454/2023402; 05000455/2023402 IR 05000454/20230012023-05-0505 May 2023 Integrated Inspection Report 05000454/2023001 and 05000455/2023001 IR 05000454/20230102023-04-19019 April 2023 License Phase 1 Report 05000454/2023010 IR 05000454/20234012023-03-30030 March 2023 Baseline Security Inspection 05000454/2023401; and 05000455/2023401 IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 IR 05000454/20220062023-03-0101 March 2023 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2022006 and 05000454/2022006) IR 05000454/20220042023-02-0101 February 2023 Integrated Inspection Report 05000454/2022004 and 05000455/2022004 IR 05000454/20220102023-01-17017 January 2023 Design Basis Assurance Inspection (Programs) Inspection Report Report 05000454/2022010 and 05000455/2022010 IR 05000454/20224032022-12-28028 December 2022 Cyber Security Inspection Report 05000454/2022403 and 05000455/2022403 IR 05000454/20224052022-12-0909 December 2022 Material Control and Accounting Program Inspection Report 05000454/2022405 and 05000455/2022405 IR 05000454/20220032022-11-0707 November 2022 Integrated Inspection Report 05000454/2022003 and 05000455/2022003 BYRON 2022-0072, Steam Generator Tube Inspection Report for Refueling Outage 232022-10-27027 October 2022 Steam Generator Tube Inspection Report for Refueling Outage 23 IR 05000454/20220052022-08-24024 August 2022 Updated Inspection Plan for Byron Station Units 1 and 2 (Report 05000454/2022005; 05000455/2022005) IR 05000454/20224022022-08-0909 August 2022 Security Baseline Inspection Report 05000454/2022402 and 05000455/2022402 IR 05000454/20220022022-08-0808 August 2022 Integrated Inspection Report 05000454/2022002 and 05000455/2022002 IR 05000454/20220012022-05-0303 May 2022 Integrated Inspection Report 05000454/2022001 and 05000455/2022001 IR 05000454/20224012022-04-0404 April 2022 Security Baseline Inspection Report 05000454/2022401 and 05000455/2022401 IR 05000454/20210062022-03-0202 March 2022 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2021006 and 05000455/2021006) IR 05000454/20210042022-02-11011 February 2022 Integrated Inspection Report 05000454/2021004 and 05000455/2021004 IR 05000454/20210122022-01-0606 January 2022 Biennial Problem Identification and Resolution Inpsection Report 05000454/2021012 and 05000455/2021012 IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 IR 05000454/20214032021-11-22022 November 2021 Security Baseline Inspection Report 05000454/2021403 and 05000455/2021403 IR 05000454/20210032021-10-29029 October 2021 Integrated Inspection Report 05000454/2021003 and 05000455/2021003 and Exercise of Enforcement Discretion IR 05000454/20214022021-09-28028 September 2021 Security Baseline Inspection Report 05000454/2021402 and 05000455/2021402 IR 05000454/20210052021-09-0101 September 2021 Updated Inspection Plan for Byron Station Units 1 and 2 (05000454/2021005 and 05000455/2021005) IR 05000454/20210022021-08-0404 August 2021 Integrated Inspection Report 05000454/2021002; 05000455/2021002; and 07200068/2021001 IR 05000454/20210112021-05-14014 May 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000454/2021011 and 05000455/2021011 IR 05000454/20215012021-04-21021 April 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2021501 and 05000455/2021501 IR 05000454/20210012021-04-20020 April 2021 Integrated Inspection Report 05000454/2021001 and 05000455/2021001 IR 05000454/20214012021-03-24024 March 2021 Security Baseline Inspection Report 05000454/2021401 and 05000455/2021401 IR 05000454/20180102021-03-19019 March 2021 Closure of Auxiliary Feedwater System Unresolved Item 05000454/2018010-04 and 05000455/2018010-04 IR 05000454/20200062021-03-0404 March 2021 Annual Assessment Letter for Byron Station (Report 05000454/2020006 and 05000455/2020006) IR 05000454/20210102021-02-0909 February 2021 Triennial Fire Protection Inspection Report 05000454/2021010 and 05000455/2021010 IR 05000454/20200042021-01-27027 January 2021 Integrated Inspection Report 05000454/2020004 and 05000455/2020004 IR 05000454/20204032020-12-16016 December 2020 Security Baseline Inspection Report 05000454/2020403 and 05000455/2020403 IR 05000454/20200032020-11-10010 November 2020 Integrated Inspection Report 05000454/2020003 and 05000455/2020003 IR 05000454/20200112020-09-29029 September 2020 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000454/2020011 and 05000455/2020011 IR 05000454/20204022020-09-18018 September 2020 Security Baseline Inspection Report 05000454/2020402 and 05000455/2020402 IR 05000454/20200052020-09-0101 September 2020 Updated Inspection Plan for Byron Station Units 1 and 2 (Report 05000454/2020005 and 05000455/2020005) IR 05000454/20200022020-07-27027 July 2020 Integrated Inspection Report 05000454/2020002 and 05000455/2020002 IR 05000454/20200012020-04-24024 April 2020 Integrated Inspection Report 05000454/2020001 and 05000455/2020001 IR 05000454/20204012020-03-30030 March 2020 Security Baseline Inspection Report 05000454/2020401 and 05000455/2020401 IR 05000454/20190062020-03-0303 March 2020 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2019006 and 05000455/2019006) 2024-02-02
[Table view] Category:Letter
MONTHYEARIR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23313A0852023-11-0909 November 2023 Submittal of 2023-301 Byron Initial License Examination Post-Examination Comments RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23242A3282023-09-0101 September 2023 Amendment No. 233 Correction IR 05000454/20235012023-08-31031 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 ML23209A7242023-07-31031 July 2023 Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 ML23192A0362023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23122A3022023-07-20020 July 2023 Issuance of Amendments Technical Specifications 2.1.1 and 4.2.1 to Allow a Previously Irradiated Accident Tolerant Fuel Lead Test Assembly to Be Further Irradiated in Unit No. 2 IR 05000454/20234022023-07-18018 July 2023 Baseline Security Inspection Document; 05000454/2023402; 05000455/2023402 ML23198A0372023-07-17017 July 2023 Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23172A1172023-06-22022 June 2023 Notification of NRC Fire Protection Team Inspection Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23159A1302023-06-0808 June 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B1R25) ML23159A1542023-06-0808 June 2023 2022 Regulatory Commitment Change Summary Report RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process ML23157A2832023-06-0606 June 2023 Notification of NRC Baseline Inspection and Request for Information BYRON 2023-0029, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements2023-06-0101 June 2023 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23003A7882023-05-11011 May 2023 Report for December 12-16, 2022, Regulatory Audit Regarding Reinsertion of a High Burnup Accident Tolerant Fuel Lead Test Assembly 2024-02-02
[Table view] |
Text
March 30, 2023
SUBJECT:
BYRON STATION - SECURITY BASELINE INSPECTION REPORT 05000454/2023401 AND 05000455/2023401
Dear David Rhoades:
On March 17, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station and discussed the results of this inspection with Curt Catencamp, security manager and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Orth, Steven on 03/30/23 Steven K. Orth, Chief Security, Emergency Preparedness & Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000454 and 05000455 License Numbers: NPF-37 and NPF-66 Report Numbers: 05000454/2023401 and 05000455/2023401 Enterprise Identifier: I-2023-401-0053 Licensee: Constellation Energy Generation, LLC Facility: Byron Station Location: Byron, IL Inspection Dates: January 23, 2023 to March 17, 2023 Inspectors: A. Anderson, Physical Security Inspector G. Bonano, Physical Security Inspector K. Maloney, Physical Security Inspector Approved By: Steven K. Orth, Chief Security, Emergency Preparedness & Incident Response Branch Division of Radiological Safety and Security Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
Main article: IP 71130.02
- (1) Tier I: All Requirements Tier II: 02.06 a - d, 02.07 a, 02.08 a, b, e Tier III: 02.09
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following procedure elements:
Security Training (1 Partial)
(1) (Partial)
Tier I: 02.01a; 02.02a - h; 02.03a - b Tier II: 02.05a - c; 02.06a - b; 02.07a; 02.08a Tier III: 02.10; 02.11a; 02.12a - b; 02.13a - c
The inspectors evaluated the fitness for duty program by completing the following inspection
Main article: IP 71130.08
- (1) Tier I: All Requirements Tier II: 02.05 a - l; 02.06a - g; 02.07 a - e; 02.08a, b; 02.09a, b Tier III: 02.10, 02.11a; 02.12a; 02.13 b, c; 02.14a - c
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements:
Security Plan Changes (1 Partial)
(1) (Partial)
The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change to the Byron Nuclear Power Station Security Plan, Training and Qualification Plan, Safeguard Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 18, in accordance with 10 CFR 50.54(p(2))
since the last performance of this IP.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) February 1, 2022 through February 1,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On March 17, 2023, the inspectors presented the security baseline inspection results to Curt Catencamp, Security Manager and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.02 Miscellaneous Key and Core Annual Inventory Document 08/08/2022
71130.02 Miscellaneous IR 4483389 Key and Core Changeout 03/08/2022
71130.02 Miscellaneous SY-AA-101-117- Visitor/Vehicle Registration Logs 03/01/2022
F-03 through
2/01/2022
71130.02 Miscellaneous SY-AA-101-117- Byron Visitor/Vehicle Logs 11/01/2022
F-03 through
2/01/2023
71130.02 Procedures LS-AA-119 Fatigue Management and Work Hour Limits 16
71130.02 Procedures SY-AA-101-112 Exelon Security Search Processes 38
71130.02 Procedures SY-AA-101-112- Protected Area Search Processes 5
1004
71130.02 Procedures SY-AA-101-112- Owner Controlled Area Inspection Processes 3
1005
71130.02 Procedures SY-AA-101-117 Processing and Escorting of Personnel and Vehicles 34
71130.02 Procedures SY-AA-101-120 Control of Security Access Control Devices 9
71130.02 Procedures SY-BY-101-112- Owner Controlled Area (OCA) Receiving Building Search 4
1001 Activities
71130.02 Procedures SY-BY-101-118- Vehicle Patrol Protected Area Barrier Patrol Checklist 03/01/2022
1002-F-01 through
01/01/2023
71130.02 Self-Assessments Byron 2021, Security NOS Audit 02/07/2022
71130.02 Self-Assessments AR 04523832 Self-Assessment, Security, NRC Modules 71130.02 Access 12/15/2022
Control
71130.07 Corrective Action ARs from 02/08/2023 through 03/06/2023
Documents
71130.07 Miscellaneous Byron Security 3-Year Training Plan 2023-2025
71130.07 Miscellaneous Instructor Trainer Qualification Certificates for PC 50 Mask;
OCAT Spray; NRA Firearms Instruction for Rifle
71130.07 Miscellaneous NRA Courses and Business Alliance Certificate for Rifle
(Daylight Fire, Night Fire and Thermal Fire)
71130.07 Procedures PI-AA-126-1001- Self-Assessment; 71130.07 Security Training, 12/08/2022
Inspection Type Designation Description or Title Revision or
Procedure Date
F-01 (AR 04523845-04); Rev 5
71130.07 Procedures SY-AA-150 Nuclear Security Training Program 5
71130.07 Procedures SY-AA-150-1007 Exelon Nuclear Security Adversary Force 2
71130.07 Procedures SY-AA-150-1008 Firearm Training Simulator (FATS) 1
71130.07 Procedures SY-AA-150-101 Exelon Nuclear Security Training 3
71130.07 Procedures SY-AA-150-104 Constellation Nuclear Security OJT Program 2
71130.07 Procedures SY-AA-150-105 Exelon Nuclear Security Physical Fitness Test Development, 1
Approval and Conduct,
71130.07 Self-Assessments NOSA-BYR-23- Security Programs Audit Report 01/17/2023
(AR 4546557) through
03/03/2023
71130.08 Corrective Action Assignment Report 01/01/2020
Documents through
01/11/2023
71130.08 Miscellaneous Fitness for Duty Tests 01/01/2020
through
2/31/2022
71130.08 Miscellaneous Active Random Pool Spreadsheets 01/13/2020
through
2/30/2022
71130.08 Miscellaneous MRO and SAE Certification Documents for Dr. Pohlman and 2020 - 2023
Dr. Bissonnette
71130.08 Miscellaneous NRC Fitness for Duty Reports 2020 - 2021
71130.08 Miscellaneous Illuminate Software - Random Number Generator
71130.08 Miscellaneous Active Random Pool Spreadsheet 01/13/2020
through
2/30/2022
71130.08 Procedures LS-AA-119 Fatigue Management and Work Hour Limits 16
71130.08 Procedures SY-AA-102-245- Operators Manual RBT IV 2
1001
71130.08 Procedures SY-AA-102-1001 Constellation Station Owner Controlled Area (OCA) Fitness 5
for Duty Program
71130.08 Procedures SY-AA-102-1001- Nuclear Station OCA Drug and Alcohol Program 0
F-01
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.08 Procedures SY-AA-102-201- Behavioral Observation 0
F-02
71130.08 Procedures SY-AA-102-202 Testing For Cause 21
71130.08 Procedures SY-AA-102-204 Random Selection and Notification Process 14
71130.08 Procedures SY-AA-102-204- Fitness for Duty Screening 0
F-01
71130.08 Procedures SY-AA-102-208 Notification of Fitness for Duty Test Results 10
71130.08 Procedures SY-AA-102-220 Fitness for Duty Events Reporting 8
71130.08 Procedures SY-AA-102-222 Handling and Storage of Fitness for Duty Records 13
71130.08 Procedures SY-AA-102-224 Work Performance Investigation 4
71130.08 Procedures SY-AA-102-225 Fitness for Duty Screening Process 7
71130.08 Procedures SY-AA-102-226 Test Results and MRO Response 11
71130.08 Procedures SY-AA-102-229 Acceptance of the Exelon Fitness for Duty and Unescorted 11
Access Program Requirements for Contractors and Vendors
71130.08 Procedures SY-AA-102-230 Designated Collection Facility 9
71130.08 Procedures SY-AA-102-240 Collection of Specimens for Testing in an Exelon Facility 16
71130.08 Procedures SY-AA-102-240- Training Instructions for Observation of an Observed 0
F-01 Collection
71130.08 Procedures SY-AA-102-242 Breath Alcohol Testing 12
71130.08 Procedures SY-AA-102-242- Alco Sensor Breath Alcohol Testing Process 0
F-01
71130.08 Procedures SY-AA-102-245- Alco Sensor Calibration Check/Calibration Log 10/2019
F-01 through
2/2022
71130.08 Procedures SY-AA-102-252 Fitness for Duty Training and Qualifications Requirements 5
71130.08 Self-Assessments NEI Audit for ElSohley 2020 11/02/2020
71130.08 Self-Assessments NEI Audit for Medtox 2021 05/17/2021
71130.08 Self-Assessments NE-2020-30 Medtox Final Audit Report 07/10/2020
71130.08 Self-Assessments NE-2021-17 NEI Audit of ElSohley Labs 2021 12/10/2021
71130.08 Self-Assessments NOSA-NCS-20- Fitness for Duty and Access Authorization Audit Report 08/05/2020
71130.08 Self-Assessments NOSA-NCS-21- Fitness for Duty and Access Authorization Audit Report 08/11/2021
71130.09 Miscellaneous Byron Nuclear Power Station Security Plan, Training and 18
Qualification Plan, Safeguard Contingency Plan and
Independent Spent Fuel Storage Installation Security
Program
71151 Miscellaneous LS-AA-2160, Monthly Data Elements for NRC ROP Indicator - Protected 02/01/2022
Revision 5 Area (PA) Security Equipment Performance Index through
2/01/2023
71151 Self-Assessments AR 04523838 Compliance With NRC Inspection Procedure 01/12/2023
71151 - Performance Indicator Verification
8