Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion
ML24206A152
Person / Time
Site: Byron  
Issue date: 07/26/2024
From: Richard Skokowski
NRC/RGN-III/DORS/RPB3
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
EA-24-053 IR 2024002
Download: ML24206A152 (1)


Text

SUBJECT:

BYRON STATION - INTEGRATED INSPECTION REPORT 05000454/2024002 AND 05000455/2024002 AND EXERCISE OF ENFORCEMENT DISCRETION

Dear David Rhoades:

On June 30, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station. On July 8, 2024, the NRC inspectors discussed the results of this inspection with H. Welt, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Byron Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Byron Station.

July 26, 2024 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Richard A. Skokowski, Chief Reactor Projects Branch 3 Division of Operating Reactor Safety Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000454 and 05000455

License Numbers:

NPF-37 and NPF-66

Report Numbers:

05000454/2024002 and 05000455/2024002

Enterprise Identifier:

I-2024-002-0055

Licensee:

Constellation Energy Generation, LLC

Facility:

Byron Station

Location:

Byron, IL

Inspection Dates:

April 01, 2024 to June 30, 2024

Inspectors:

N. Bolling, Project Engineer

A. Demeter, Senior Resident Inspector

T. Hooker, Health Physicist

R. Knutson, Illinois Emergency Management Agency

E. Magnuson, Reactor Inspector

J. Masse, Resident Inspector

J. Robbins, Senior Resident Inspector

Approved By:

Richard A. Skokowski, Chief

Reactor Projects Branch 3

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Establish Adequate Work Instructions During 2A Emergency Diesel Generator Maintenance Resulting in Additional Repairs and Unavailability Time Due to Rocker Arm Lifter Failure Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000454,05000455/2024002-01 Open/Closed

[H.5] - Work Management 71152A A self-revealed finding of very low safety significance (Green) and associated non-cited violation (NCV) of Technical Specification 5.4.1.a was identified for the licensees failure to establish adequate maintenance work instructions to replace the 7R cylinder rocker arm assembly on the 2A Emergency Diesel Generator (EDG). Specifically, maintenance planners failed to include appropriate instructions in safety-related work order (WO) 5282402, 2DG01KA 6 Year Mechanical Inspection, to install 1/4 plugs on the shaft of the rocker arm assembly during a 2A EDG work window. This condition caused a leak of lube oil from the rocker shaft resulting in improper lube oil flow to the rocker arm lifter and subsequent additional unavailability time to necessitate identification and repair of a collapsed lifter.

Additional Tracking Items

Type Issue Number Title Report Section Status EDG EA-24-053 Failure to Comply with 10 CFR Part 37 71124.08 Closed

PLANT STATUS

Unit 1 began the inspection period operating at full power and remained at or near full power for the remainder of the inspection period with the exception of brief power reductions to support scheduled testing activities.

Unit 2 began the inspection period operating at full power and remained at or near full power for the remainder of the inspection period with the exception of brief power reductions to support scheduled testing activities.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated station readiness prior to the onset of seasonal hot temperatures for various safety-related systems and pieces of equipment needed for reliable operation during the summer period through the week ending June 1, 2024.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)1B and 2B Auxiliary Feedwater System during a 2B Emergency Diesel Generator (EDG) work window on April 10, 2024

(2) Unit 1 and Unit 2 Essential Service Water System during a 2A EDG work window on April 24, 2024
(3) Unit 1 Chemical Volume Control System on May 24, 2024
(4) Instrument Air System on May 31, 2024 (5)1A EDG on June 13, 2024

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Zones 8.2-1 and 8.3-1, Unit 1 Turbine Building 369'-0" and 401'-0" Elevations, following actuation of suppression zone 1S-23, as documented in Issue Report (IR) 4755232 on April 11, 2024
(2) Review and verification of Mechanical Fire Barrier Penetration 18-month visual inspections per 0BHSR 10.G.8-1 on April 9, 2024
(3) Review and verification of Electrical Fire Barrier Penetration 18-month visual inspections per 0BHSR 10.G.6-1 on April 9, 2024
(4) Fire Zone 11.6-1, 426 Elevation, Unit 1, Division 12, Electrical Penetration Area on April 10, 2024
(5) Fire Zone 11.6-2, 426 Elevation, Unit 2, Division 22, Electrical Penetration Area on April 10, 2024
(6) Fire Zone 11.3-0, Auxiliary Building 364' Elevation Unit 1 and Unit 2 General Areas on May 29, 2024
(7) Fire Zone 9.1-2, 9.2-2, 9.3-2, and 9.4-2, Auxiliary Building 401' Elevation 2A and 2B Diesel Generator and Day Tank Rooms on June 13, 2024

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance involving on-watch operations crews in the control room during various activities on April 11 and 17, 2024.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated the performance of a complex casualty graded scenario by a crew of licensed plant operators in the facilitys simulator on May 14, 2024.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

(1) Maintenance effectiveness review of the 2A Motor Driven Auxiliary Feedwater Pump following oil contamination

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Review and evaluation of the risk associated with the 1B Essential Service Water pump following discovery of leakage in ASME code class 3 components, as documented in IR 4771025
(2) Review and evaluation of the risk associated with ultrasonic testing of 1A Auxiliary Feedwater (AF) piping following issues performing a flushing surveillance, as documented in IR 4770998
(3) Review and evaluation of the risk associated with emergent work on the 2A EDG, as documented in various IRs
(4) Review and evaluation of the risk management actions associated with a planned Risk-Informed Completion Time implementation during a Station Auxiliary Transformer work window on May 23, 2024
(5) Review and evaluation of the risk associated with the emergent removal and replacement of 2A Containment Chiller motor, as documented in Work Order (WO) 5217501
(6) Review and evaluation of the risk associated with troubleshooting the 2A Reactor Coolant System loop flow transmitter due to downward trending, as documented in IR 4781014

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (7 Samples)

The inspectors evaluated the licensees justifications and actions associated with the following operability determinations and functionality assessments:

(1) Evaluation of the operability of the diesel driven fire pump following low viscosity results for crank case oil, as documented in IR 4765136
(2) Evaluation of the operability of the Unit 2, Train B, Emergency Diesel Generator following fuel injector performance testing as documented in IR 4765868
(3) Evaluation of the operability of the Unit 2, Train B, Emergency Diesel Generator due to a fuel oil leak as documented in IR 4765926
(4) Evaluation of the past operability of the Unit 2, Train A, Emergency Diesel Generator following discovery of multiple issues during a scheduled work window
(5) Evaluation of the operability of the Essential Service Water Cooling Towers following discovery of several significantly corroded fan blade bracket bolts, as documented in various IRs
(6) Evaluation of the operability of the Essential Water Booster Pump for the 1B Auxiliary Feedwater pump following difficulties with automatic limit switch actuation, as documented in IR 4774788
(7) Evaluation of the operability of 2B Auxiliary Feedwater Pump following degrading fan gear oil pressure, as documented in 4774945

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (6 Samples)

(1) Functional and operational testing of the 2B EDG following a work window, as documented in WO 5366338
(2) Functional and operational testing of 2B EDG Kilovac Relays following replacement per EC 637584, as documented in WO 5197633
(3) Functional and operational testing of 2A EDG Kilovac Relays following replacement per EC 637584, as documented in WO 5297630
(4) Functional and operational testing of the Unit 2 Station Auxiliary Transformer following a work window, as documented in WO 5310372
(5) Functional and operational testing of 2A EDG following a 6-year mechanical inspection, as documented in WO 5282402
(6) Functional and operational testing of 1A Safety Injection Pump following a scheduled work window, as documented in WO 5527861

Surveillance Testing (IP Section 03.01) (4 Samples)

(1) Surveillance calibration of the Unit 2 Safety Injection accumulator tank level loops 2SI-0950 and 2SI-0952, as documented in WO 5326886 and 5326885
(2) Surveillance testing of the 1B EDG, as documented in WO 5422619
(3) Surveillance testing of the 2B AF Pump, as documented in WO 5547445
(4) Surveillance test of Power Range Channel N44, as documented in WO 5322680

Inservice Testing (IST) (IP Section 03.01) (2 Samples)

(1) Inservice Testing of the 2B Residual Heat Removal Pump, as documented in WO 5476146
(2) Inservice Testing of the 1B Component Cooling pump, as documented in WO

RADIATION SAFETY

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling,

Storage, & Transportation

Radioactive Material Storage (IP Section 03.01)

The inspectors evaluated the licensees performance in controlling, labeling, and securing the following radioactive materials:

(1)radioactive materials stored in a warehouse (2)sealed sources stored in cages and cabinets throughout the site

Radioactive Waste System Walkdown (IP Section 03.02) (2 Samples)

The inspectors walked down the following accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality:

(1)radiation waste building resin processing equipment (2)condensate polish vessel and resin transfer equipment

Waste Characterization and Classification (IP Section 03.03) (2 Samples)

The inspectors evaluated the following characterization and classification of radioactive waste: (1)resin waste stream (2)dry active waste stream

Shipment Preparation (IP Section 03.04) (1 Sample)

(1) The inspectors observed the preparation of radioactive shipment BY-24-020 of dewatered spent resin on May 20, 2024.

Shipping Records (IP Section 03.05) (4 Samples)

The inspectors evaluated the following non-excepted radioactive material shipments through a record review:

(1) Shipment RWS23-20 UN3321 LSA-II; resin liner RO704140-27 in cask 14-210H
(2) Shipment RWS23-23 UN2916 Type B; resin liner PO708809-11 in cask RT-100
(3) Shipment RWS23-22 UN3321 LSA-II; resin liner PO708809-10 in cask EXE-001
(4) Shipment BY-24-020 UN3321 LSA-II; resin liner PO710836-20 in cask 14-215H

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) Unit 1 (April 1, 2023 - March 31, 2024)
(2) Unit 2 (April 1, 2023 - March 31, 2024)

MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)

(1) Unit 1 (April 1, 2023 - March 31, 2024)
(2) Unit 2 (April 1, 2023 - March 31, 2024)

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 (April 1, 2023 - March 31, 2024)
(2) Unit 2 (April 1, 2023 - March 31, 2024)

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples)

(1) Unit 1 (May 1, 2023 - January 31, 2024)
(2) Unit 2 (May 1, 2023 - January 31, 2024)

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) May 1, 2023 - April 30, 2024 PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
(1) June 01, 2023 - March 31, 2024

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Corrective actions associated with high temperatures followed by excessive clattering on the 7R cylinder of the EDG during a scheduled 2A EDG work window, as documented in WO 5282402

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensees corrective action program to identify potential trends with the 0B diesel driven fire pump maintenance and performance that might be indicative of a more significant safety issue.

INSPECTION RESULTS

Enforcement Discretion Enforcement Action EA-24-053: Failure to Comply with 10 CFR Part 37 71124.08

Description:

On April 27, 2016, the licensee was issued NRC Inspection Report Nos. 05000454/2016406 and 05000455/2016406, which documented a licensee identified violation of 10 CFR Part 37, Physical Protection of Category 1 and Category 2, Quantities of Radioactive Material at Facilities with a 10 CFR Part 73, Physical Protection Program. The violation met the criteria for Enforcement Discretion as described in Enforcement Guidance Memorandum (EGM)14-001, Interim Guidance for Dispositioning 10 CFR Part 37 Violations with Respect to Large Components or Robust Structures Containing Category 1 or Category 2 Quantities of Material at Power Reactor Facilities Licensed Under 10 CFR Parts 50 and 52.

Subsequently, the inspector re-evaluated this activity and found that while a violation of regulatory requirements continues to exist, the conditions remain within the criteria for enforcement discretion established within EGM 14-001.

Corrective Actions: As specified in EGM 14-001, the application of discretion is authorized until the underlying technical issue is dispositioned through rulemaking or other regulatory action.

Corrective Action References: Not Applicable

Enforcement:

Violation: On April 27, 2016, a violation of 10 CFR Part 37 was documented in Byron Inspection Report Nos. 05000454/2016406 and 05000455/2016406. The inspectors determined that the previously identified violation remains.

Basis for Discretion: This violation met the criteria for Enforcement Discretion as described in Enforcement Guidance Memorandum (EGM) 14-001, Interim Guidance for Dispositioning 10 CFR Part 37 Violations with Respect to Large Components or Robust Structures Containing Category 1 or Category 2 Quantities of Material at Power Reactor Facilities Licensed Under 10 CFR Parts 50 and 52.

Failure to Establish Adequate Work Instructions During 2A Emergency Diesel Generator Maintenance Resulting in Additional Repairs and Unavailability Time Due to Rocker Arm Lifter Failure Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000454,05000455/2024002-01 Open/Closed

[H.5] - Work Management 71152A A self-revealed finding of very low safety significance (Green) and associated non-cited violation (NCV) of Technical Specification 5.4.1.a was identified for the licensees failure to establish adequate maintenance work instructions to replace the 7R cylinder rocker arm assembly on the 2A Emergency Diesel Generator (EDG). Specifically, maintenance planners failed to include appropriate instructions in safety-related work order (WO) 5282402, 2DG01KA 6 Year Mechanical Inspection, to install 1/4 plugs on the shaft of the rocker arm assembly during a 2A EDG work window. This condition caused a leak of lube oil from the rocker shaft resulting in improper lube oil flow to the rocker arm lifter and subsequent additional unavailability time to necessitate identification and repair of a collapsed lifter.

Description:

At 1200 on April 21, 2024, the station entered limited condition for operation (LCO) 3.8.1, AC Sources - Operating, for a planned 6-year preventative maintenance work window for the 2A EDG under WO 5282402, DG01KA 6 Year Mechanical Inspection. Early into the work window, it was identified that additional maintenance was necessary on the 6R and 7R cylinders of the diesel due to damage sustained to the lifters over the previous operating period. Further inspection found that the entire rocker arm assembly for the 7R cylinder would need to be replaced due to mechanical binding. A major revision was added to the WO to include the additional maintenance.

The rocker arm assembly was replaced part way through the work window and prior to the performance of a series of post-maintenance tests (PMT). During one of the PMT runs on April 29, 2024, operators observed the 7R cylinder temperature to be slightly elevated high out of band. Maintenance technicians removed an inspection cover of the 7R cylinder while the EDG was running and observed lube oil leaking from both ends of the rocker arm shaft, as documented in AR 4770407, Lube Oil Leak on 7R Cylinder from Rocker Arms. The EDG completed the run as the station investigated the cause of the oil leak.

Drawing KSV-25-4, Inlet and Exhaust Rocker & Push Rod, was discovered to show 1/4 plugs installed on either end of the rocker shaft as necessary components of the assembly. These plugs had not been incorporated into the maintenance package during the planning stages after discovery. Purchase and stocking information for the plugs was identified and searches found recent, similar work from Braidwood for a rocker arm assembly where the plugs had been identified and incorporated into the work package. A revision to the WO was made to install the plugs. The EDG successfully completed a PMT run and the LCO was exited at 2131 on April 29, 2024.

The station re-entered the LCO at 2223 on May 1, 2024, to perform additional maintenance.

The LCO was exited at 0708 on May 2, 2024, following a confidence run. During this run, additional maintenance was identified and the LCO was again entered at 0905. During a PMT run following this maintenance, operators observed the 7R cylinder was making more noise than usual and that a noticeable knock could be felt by hand on the access panel. This was captured in AR 4771539, 2A EDG excessive clattering on the 7R cylinder valve train. While not expected nor normal, the licensee concluded that the clattering noise did not represent an unacceptable condition that would impact the EDGs availability or operability, and that the 2A EDG was capable of performing its specified function. The PMT run was completed and the LCO exited at 1106 on May 2, 2024.

A maintenance strategy was developed to diagnose the cause and perform repairs as necessary. The station entered the LCO later in the afternoon of May 2, 2024, at 1329 to troubleshoot and discovered a failed valve lifter. Drilled holes in the rocker arm shaft deliver lube oil to the lifters for lubrication during operation. The inadequate lube oil flow to the lifters during the series of PMTs that occurred while the shaft plugs were not installed was later attributed to the collapse of the lifter. The station decided that repairs to the lifter would occur during the overnight hours when the preferred maintenance technicians returned to work so the LCO was exited at 1343. The LCO was again entered at 0300 on May 3, 2024, to repair the lifter. A PMT was completed and the LCO was exited for a final time at 0507.

The licensee established procedure MA-AA-716-010, Maintenance Planning, to provide guidance on requirements and expectations of the Maintenance Planning process. Per step 3.3.7 of this procedure, maintenance planners should have identified the correct parts and materials to support the work activities and incorporated this information into the work package. Step 4.6.4 of this procedure states, in part, while developing work instructions, determine repair technique and review the following inputs and others as may be required. Of these inputs, the step specifically lists maintenance history including other Exelon

[Constellation] sites, design specifications, controlled documents, and design documents as items to review. Contrary to this, maintenance planners failed to incorporate information from all available inputs, including drawing KSV-25-4 and maintenance history from Braidwood.

Corrective Actions: In addition to installing the pipe plugs and replacing the damaged lifter, the licensee positively identified the drawing that shows the plugs, the purchase and stocking information of the plugs, and similar work from Braidwood station that was performed in the recent past showing the inclusion of the plugs in their work package. The rocker arm shaft and pipe plugs will be crossed referenced in the licensees database to ensure the connection between the two is not overlooked in the future.

Corrective Action References:

4770407; Lube Oil Leak on 7R Cylinder from Rocker Arms; 04/29/2024 4771539; 2A EDG excessive clattering on the 7R cylinder valve train; 05/02/2024

Performance Assessment:

Performance Deficiency: The inspectors determined that the failure to establish work instructions appropriate to the circumstances for performing maintenance on the 2A EDG 7R rocker arm assembly was not consistent with licensee procedure MA-AA-716-010 and TS 5.4.1.a and was a performance deficiency. Specifically, during planning for the rocker arm replacement, maintenance planners failed to identify and incorporate the plugs on drawing KSV-25-4 into the work instructions resulting in insufficient lube oil flow to the lifters that subsequently caused one lifter to collapse.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Procedure Quality attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the inspectors determined that the licensees failure to install the plugs in the rocker arm shaft and run the EDG without proper lube oil flow contributed to the collapse of the 7R cylinder lifter, and, as such, had an adverse impact on the 2A EDG reliability. Additionally, the ensuing maintenance to diagnose the issues and perform repairs resulted in additional unavailability time of the 2A EDG.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors screened the issue using IMC 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, and determined that this finding was of very low safety significance (Green).

Cross-Cutting Aspect: H.5 - Work Management: The organization implements a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. The work process includes the identification and management of risk commensurate to the work and the need for coordination with different groups or job activities. Specifically, maintenance planners had controlled drawing KSV-25-4 available to them while planning as well as comparative work history from Braidwood but failed to utilize this information while planning for the replacement.

Enforcement:

Violation: Byron Unit 2 Technical Specifications 5.4.1, requires, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978.

NRC Regulatory Guide 1.33, Revision 2, Appendix A, Section 9 addresses Procedures for Performing Maintenance and Section 9.a states, in part, Maintenance that can affect the performance of safety-related equipment should be properly preplanned and performed in accordance with written procedures, documented instructions, or drawings appropriate to the circumstances.

The licensee established WO 5282402, task 1, major revision 4, on April 22, 2024, to replace the 7R exhaust rocker arm assembly.

Contrary to the above, following discovery of the additional maintenance needed through the start of the PMTs on April 29, 2024, the licensee failed to establish a work package to address the requirements of Regulatory Guide 1.33, Appendix A, Section 9.a. Specifically, maintenance planners failed to identify and include necessary replacement parts of the rocker arm assembly as depicted in drawing KSV-25-4 when establishing work instructions for maintenance on the safety-related EDG under WO 5282402. This ultimately led to improper flow of lube oil within the 7R cylinder causing the collapse of a rocker arm lifter.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Observation: 0B Diesel Driven Fire Pump (0FP03PB) Performance Issues 71152S The inspectors reviewed the licensees corrective action program to identify potential trends in the performance and system health of the diesel fire pump that might be indicative of a more significant safety issue. The inspectors observed several potential trends related to the equipment health of the diesel fire pump including fuel dilution as documented in Issue Report (IR) 4774816, head gasket condition as documented in IR 4774406, high discharge pressure as documented in IR 4776335, and unexpected loss of power alarms as documented in IR 4782149.

The inspectors performed a detailed review of IRs associated with IR 4774816 0FP03PB Diesel Engine Fuel Dilution Negative Trend, IR 4774406 0FP03PB Diesel Engine Head Gasket Negative Trend, IR 4776335 0B Fire Pump High Discharge Pressure and IR 4782149 0B Fire Pump Loss of Power Alarm.

Specific CAP entries reviewed by the inspectors included, but were not limited to:

  • IR 4765136 0FP03PB Diesel Crank Case Oil Low Viscosity
  • IR 4772609 0FP03PB Diesel Confirmatory Oil Sample Results
  • IR 4774816 0FP03PB Diesel Engine Fuel Dilution Negative Trend
  • IR 4754138 0B Fire Pump Discharge Pressure High During Monthly Run
  • IR 4688979 0B FP Pump Unexpected Alarm While a negative trend related to lube oil samples seems apparent, the station has been taking global actions on improving their processes and procedures for oil sampling and analyses to arrest the trend.

In accordance with corrective action program requirements, the licensee continues to review preventive maintenance strategies and activities for possible enhancements or modifications.

Engineers remain cognizant of the differences between past performance of the old pump and current performance of the new pump to ensure operability is maintained. Identified discrepancies are promptly entered into the corrective action program and addressed with an appropriate level of sensitivity commensurate with the safety significance of the equipment.

No findings or violations of NRC requirements of more than minor safety significance were identified by the inspectors in the course of this review.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 8, 2024, the inspectors presented the integrated inspection results to H. Welt, Site Vice President, and other members of the licensee staff.
  • On May 24, 2024, the inspectors presented the radiation protection inspection results to H. Welt, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4734453

1C CW Riser May Have Possible Leak-By

01/22/2024

4750286

Ops Focus - Difficulty Tripping 0A CW M/U Pump from MCR

2/14/2024

4769451

Increasing DP Trend on 1B HD Pump Suction Strainer

04/25/2024

4771456

PM Hold Code of RSK applied to PMs on PM.01 Report

05/02/2024

4771595

Summer Readiness Preparation

05/02/2024

4775381

Unexpected 1-19-B10 MAIN XFMR 1E TROUBLE - Major

Alarm

05/20/2024

Corrective Action

Documents

4776200

Summer Readiness - 1B HD Pp Suct Strn dP Reading High

05/23/2024

Letter from Harris

Welt, Byron

Generating

Station Site Vice

President, to

Marri Marchionda-

Palmer, Senior

Vice President of

Nuclear

Operations

Constellation

Nuclear

Certification of 2024 Summer Readiness

05/23/2024

OP-AA-108-111

Adverse Condition Monitoring and Contingency Plan for

1TO09C-M Fan Failure

11/10/2023

OP-AA-108-111

Adverse Condition Monitoring and Contingency Plan for

U-1 Throttle Valve #3

01/12/2024

OP-AA-108-111

Adverse Condition Monitoring and Contingency Plan for

2FW009B Hydraulic Leakage

11/08/2023

OP-AA-108-111

Adverse Condition Monitoring and Contingency Plan for

2WO01PA Monitoring

01/29/2024

OP-AA-108-111

Adverse Condition Monitoring and Contingency Plan for Leak

on Pipe Upstream of 2SX035

2/11/2023

71111.01

Miscellaneous

OP-AA-108-111

Adverse Condition Monitoring and Contingency Plan for

Reactor Power Adjustment due to Circulating Water

05/23/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Temperatures and Condenser Pressure

0BOSR XHT-A1

High Temperature Equipment Protection

ER-AA-2030

Conduct of Equipment Reliability Manual

OP-AA-107

Integrated Risk Management

OP-AA-107-F-01

Risk Screening/Mitigation Plan

OP-AA-108-111-

1001

Severe Weather and Natural Disaster Guidelines

WC-AA-101

On-Line Work Control Process

WC-AA-101-1002

On-line Scheduling Process

Procedures

WC-AA-107

Seasonal Readiness

Work Orders

5368168

High Temperature Equipment Protection (Outside Air

Temperature >70 Degrees)

05/23/2024

Corrective Action

Documents

4768917

NRC Identified Protected Equipment not posted correctly

04/23/2024

OP-BY-108-117-

1000

Protected Equipment Worksheet for 2A Diesel Generator Work

Window

04/20/2024

Miscellaneous

OP-BY-108-117-

1000

Protected Equipment Worksheet for 2B Diesel Generator Work

Window

04/06/2024

BOP AF-E1B

Unit 1 Auxiliary Feedwater System Train B Electrical Lineup

BOP AF-E2B

Unit 2 Auxiliary Feedwater System Train B Electrical Lineup

BOP AF-M1B

Unit 1 Auxiliary Feedwater System Train B Valve Lineup

BOP AF-M2B

Unit 2 Auxiliary Feedwater System Train B Valve Lineup

BOP CV-E1

Unit 1 Chemical Volume Control System Electrical Lineup

BOP CV-M1

Unit 1 Chemical Volume Control System Valve Lineup

BOP DG-E1

Diesel Generator Electrical Lineup

BOP DG-M1

Diesel Generator System Valve Lineup

BOP DO-M1B

Unit 1 Train B Diesel Fuel Oil System Valve Lineup

BOP DO-M2B

Unit 2 Train B Diesel Fuel Oil System Valve Lineup

BOP IA-E1

Unit 1 Instrument Air Electrical Lineup

BOP IA-E2

Unit 2 Instrument Air Electrical Lineup

BOP IA-M1

Instrument Air Valve Lineup

BOP SX-E1

Unit 1 Essential Service Water Electrical Lineup

71111.04

Procedures

BOP SX-E3

Unit 0 Essential Service Water Electrical Lineup

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

BOP SX-M1

Unit 1 Essential Service Water System Valve Lineup

BOP SX-M2A

Unit 2 Train A Essential Service Water System Valve Lineup

BOP SX-M2B

Unit 2 Train B Essential Service Water System Valve Lineup

24102

Unexpected FP Alarm Received in the MCR (1S-23)

2/17/2023

25659

Spurious Actuation of Fire Suppression Zone 1S-23

2/27/2023

4755232

Spurious Actuation of Fire Suppression Zone 1S-23

03/04/2024

4760291

EOC for Automatic Deluge Systems - Flushing Priming Lines

03/22/2024

4815993

LR-Group 6-Fire Barrier Penetration Visual Inspection

08/09/2019

21837

LR-Group 7-Fire Barrier Penetration Visual Inspection

2/26/2021

5097863

LR-Group 8-Fire Barrier Penetration Visual Inspection

11/28/2022

25275

ST EM LR-Fire Barrier Penetration Visual Inspection

Mo Control

05/27/2022

28901

LR-Fire Related Assemblies Visual Inspection

Section 17 - U1 LCSR

08/19/2022

5167968

LR-Fire Related Assemblies Visual Inspection

Section 8 - DG Cable Tunnel

2/22/2022

259368

LR-Group 9 - Fire Barrier Penetration Visual Inspection

01/08/2024

298628

LR-Fire Related Assemblies Visual Inspection

Section 10 - Miscellaneous Aux

10/24/2022

Corrective Action

Documents

5303509

LR-Fire Related Assemblies Visual Inspection

Section 18 - U2 LCSR

01/18/2024

Drawings

FPS-738-BY

Fire Barrier Penetration Seal Surveillance

B

Pre-Fire Plan

  1. 111

Fire Zone 11.3-0 South, Auxiliary Building 364'-0 Elev.

General Area South

Pre-Fire Plan

  1. 112

Fire Zone 11.3-0 West, Auxiliary Building 364'-0 Elev.

General Area West

Pre-Fire Plan

  1. 113

Fire Zone 11.3-0 North, Auxiliary Building 364'-0 Elev.

General Area North

Pre-Fire Plan #56

Fire Zone 8.2-1 North, Turbine Bldg. 369'-0 Elev. Unit 1

Turbine Bldg. Basement - North

Pre-Fire Plan #60

Fire Zone 8.3-1 Northwest, Turbine Bldg. 401'-0 Elev. Unit 1

Turbine Bldg. - NW

71111.05

Fire Plans

Pre-Fire Plan #61

Fire Zone 8.3-1 Southeast, Turbine Bldg. 401'-0 Elev. Unit 1

Turbine Bldg. - SE

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Pre-Fire Plan #62

Fire Zone 8.3-1 Southwest, Turbine Bldg. 401'-0 Elev. Unit 1

Turbine Bldg. - SW

Pre-Fire Plan #63

Fire Zone 8.3-1 Northeast, Turbine Bldg. 401'-0 Elev. Unit 1

Turbine Bldg. - NE

Pre-Fire Plan #89

Fire Zones 9.1-2 and 9.4-2, Auxiliary Building 401'-0 Elev. 2B

Diesel Generator & Day Tank Room

Pre-Fire Plan #91

Fire Zones 9.2-2 and 9.3-2, Auxiliary Building 401'-0 Elev. 2A

Diesel Generator & Day Tank Room

0BHSR 10.G.6-1

Electrical Fire Barrier Penetration Visual Inspection 18 Month

Surveillance

Procedures

0BHSR 10.G.8-1

Mechanical Fire Barrier Penetration Visual Inspection

Month Surveillance

71111.11Q

Miscellaneous

SEG 27-3-1

LORT Cycle Training

4752721

2AF01PA Pump Oil High Viscosity

2/23/2024

Corrective Action

Documents

4753381

2AF01PA Pump Oil Confirmatory Sample High Viscosity

2/26/2024

BOP AF-300-1

Sampling the Motor Driven Auxiliary Feedwater Pumps

Lubricating Oil Reservoirs (AF01PA)

008

Procedures

MA-AA-716-230-

1001

Oil Analysis Interpretation Guideline

25070

Replace AF PP/Gearbox Lube Oil System Relief Valve

10/26/2021

71111.12

Work Orders

5502957

EWP FNM Contingency Change Oil In 2AF01PA Pump

2/27/2024

24-037

Ultrasonic Thickness Calibration and Component Examination

for 1SX84BB

05/01/2024

Calculations

3C8-1281-001

Auxiliary Building Flooding Calculation

4770998

No Flow During Flush of 1A AF Pump Sx Suction Line

04/30/2024

4771025

1B Essential Service Water Pump Discharge Piping Leak

05/01/2024

4771399

Documentation Discrepancies for Pipe 1SX84BB-4"

05/02/2024

4771603

No Flow Indicated on SX Line

05/02/2024

4772907

U2 SAT 242-1 SFRA Testing Needs Reperformed

05/08/2024

4772999

N513 NDE on 2SX84BB

05/09/2024

4773001

N513 NDE on 2SX84BA

05/09/2024

4773005

N513 NDE on 2SXC9CA

05/09/2024

71111.13

Corrective Action

Documents

4773011

N513 NDE on 2SXC9CB

05/09/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4773013

N513 NDE on 1SXC9CB

05/09/2024

4773407

IR to Create WO for SAT 242-2 4kv Non Seg Bus Inspections

05/10/2024

4774518

SAT 242-1 Press Relief Device Operate Alarm locked in

05/16/2024

4775018

SAT 242-2 Has Multiple Orange Alarms that Will Not Clear

05/18/2024

4776097

SAT 242 Work Window 4.0 Critique

05/23/2024

4778911

2A VP Chiller Tripped During RTS

06/05/2024

4779881

2B VP Chiller Pump Seal leak, 2WO01PB

06/10/2024

4781014

2A RCS Loop Flow Channel 2RC-0414 (2FT-0414) Trending

Down

06/16/2024

4782579

Work Instruction and Scheduling Enhancement

06/22/2024

4645010-362 sh.

List of Apparatus

001

6E-2-4030AP04

Schematic Diagram System Auxiliary Transformer 242-1

Part 2 2AP02E

L

Drawings

M-42 Sheet 1A

Diagram of Essential Service Water

AU

640250

Op Eval 23-001 - Pinhole Leak on Tee Branch Weld - Line

2SX32A-4 Use of Code Case N-513 (IR 04716984)

000

Engineering

Changes

641426

Op Eval 24-001 - Pinhole Leak on Weld - Line 1SX84BB-4

Use of Code Case N-513 (IR 04771025)

000

Final RICT Record for Planned Work Window on Both

SAT 242-1 and 242-2

05/17/2024

ASME Case N-

513-3

Evaluation Criteria for Temporary Acceptance of Flaws in

Moderate Energy Class 2 or 3 Piping Section XI, Division 1

01/26/2009

Miscellaneous

OP-BY-108-117-

1000

Protected Equipment Worksheet for SAT 242 Work Window

and RICT

05/07/2024

2BOSR FP-BA1

Unit Two System Auxiliary Transformer Deluge System Flush

BHP 4200-172

System Auxiliary Transformer Preventative Maintenance

Inspection

BISR 3.1.10-201

Surveillance Calibration of Reactor Coolant Flow Loop

CC-AA-309-1011

General Station Piping Analysis

ER-AA-330-009

ASME Section XI Repair/Replacement Program

Procedures

ER-AA-335-004

Ultrasonic (UT) Measurement of Material Thickness and

Interfering Conditions

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ER-AA-5400-

1001

Raw Water Piping Integrity Management Guide

ER-AA-600

Risk Management

ER-AA-600-1012

Risk Management Documentation

ER-AA-600-1042

On-Line Risk Management

ER-BY-600-2001

Byron Risk Informed Completion Time (RICT) System

Guidelines

000

OP-AA-108-115

Operability Determinations (CM-1)

1563391

1B Essential Service Water Pump Discharge Piping Leak

05/03/2024

5310372

(NEIL) - Perform Power Factor Testing of Transformer

05/15/2024

5311248

(NEIL) - Electrical Testing

05/23/2024

5411047

Calibrate Transmitter 2FT-0414

10/22/2023

Work Orders

23741

LR-1A AF Pump Essential Service Water Suction Line

Flushing Surveillance

05/06/2024

Calculations

Design Analysis

BYR13-234/BRW-

2-0216-M

Auxiliary FW Pump Room Temperature Analysis During an

ELAP Event

001

4415138

Fuel Dilution in 0FP03PB Diesel Approaching to Fault Level

04/07/2021

4459411

Crank Case Oil Viscosity in 0FP03PB is in Fault Range

11/05/2021

4517748

0FP03PB Engine Oil Fuel Dilution Off Trend

08/17/2022

4731243

Adverse Trend - Diesel Fuel Injectors Parts Quality Issues

01/16/2024

4739796

Test Equipment Installed Incorrectly During 2SI-0952 Cal

04/17/2024

4765136

0FP03PB Diesel Crank Case Oil Low Viscosity

04/10/2024

4765626

Fuel Oil Leak on the 2B Diesel Generator

04/12/2024

4765868

Results of 2B EDG Fuel Injector Testing

04/04/2024

4766018

2DG5277B Leakby

04/13/2024

4767694

W/R Needed for Spare EDG JW Floating Head Refurbishment

04/19/2024

4768227

1A DG Starting Air Compressor 1B Cycling

04/22/2024

4768230

1A DG No.1 Air Dryer Auto-Drain Valve Porting Air

04/22/2024

4768232

1A DG Starting Air Compressor 1A Setpoint

04/22/2024

4768314

2A EDG 10R Cylinder Expanded Inspection Required

04/22/2024

71111.15

Corrective Action

Documents

4768344

2A DG Reverse Power Protective Relay found Out of

Tolerance

04/22/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4768366

2A EDG Intercooler Coils Fouling with Oil - Need Cleaning

04/22/2024

4768468

Expanded Scope 2DG01KA

04/22/2024

4769697

2A EDG Rod Bolt Stretch Outside of Expected Range

04/26/2024

4770205

2A DG Trip During Post Maintenance Run

04/28/2024

4770231

2A DG Exhaust Rupture Disk Blown

04/28/2024

4770233

2A DG Lube Oil Pressure Reading Low

04/28/2024

4770407

Lube Oil Leak on 7R Cylinder from Rocker Arms

04/29/2024

4770474

BOP DG-11 Missing Step to Align VL to Recirc Before Starting

04/29/2024

4771462

Corrosion on 0SX03CB Bolting

05/02/2024

4774788

1SX175 Limit Switch Actuator Requires Assistance Making Up

05/17/2024

4774945

2B AF Pump Fan Oil Pressure Low and Decreasing with Run

05/17/2024

Drawings

KSV-18-3

Fuel Injection Pump

A

641007

Essential Service Water Cooling Tower (SXCT) Fan Blade

Clamp Bolt Evaluation

000

Engineering

Changes

EC 623441

DG Closed System Leak Guidance (Lube Oil, Jacket Water,

Fuel Oil)

Evaluation 16-

19864-005

Palo Verde Unit 3 Emergency Diesel Generator B Engine

Failure Evaluation Report

Miscellaneous

F-0424

KSV Diesel Generator

04/01/1987

0BMSR 3.10.B.14

Diesel Fire Pump Engine 18-Month/1500 Hour Maintenance

0BOSR 10.b.6-1

Diesel Fire Pump Monthly Surveillance

1BOSR

5.5.8.AF.5-2b

Unit One Group B Inservice Testing (IST) Requirements for

Diesel Driven Auxiliary Feedwater Pump 1AF01PB

Procedures

OP-AA-108-115

Operability Determinations (CM-1)

4968484

(Change) Diesel Driven Fire Pump 0B

05/20/2021

4968485

Perform 18 Month Inspection of Fire Pump Diesel Engine

05/20/2021

5072899

Remove Relief Valve to Support Op Surv 0BOSR 3.10.B.12-1

05/10/2022

5143357

(Change) Diesel Driven Fire Pump 0B

04/14/2021

5147049

0B Fire Pump Head Gasket Leak

03/25/2024

204339

EWP MM - Perf. Engine Inspection

Per 0BMSR3.10.B.14 - Autogen

09/24/2022

205172

EWP - FNM - Flush/Change Engine Oil - 0FP03PB

11/19/2021

Work Orders

292318

NEIL - Diesel Driven 0B Fire Pump Surveillance

09/24/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

5306775

(Change) Diesel Driven Fire Pump 0B

08/14/2023

5315760

NEIL - Perform 18 Month Inspection of Fire Pump Diesel

Engine

08/22/2023

5342600

(Sample) Diesel Driven Fire Pump 0B

09/14/2023

26056

LR-(NEIL)-1AP01PB Group B IST Requirements for Diesel

Drive Pump

03/06/2024

4764308

2B Diesel Generator Requires Replacement

04/08/2024

4764378

2DG01KB-X1 Coating Is Degraded

04/08/2024

4764379

2DG01KB-X2 Coating Is Degraded

04/08/2024

4764703

2B DG Vent System Fan 2VD01CB Diff Pressure

04/09/2024

4765299

2DO052 - Fuel Oil Valve Missing from Plant Documents

04/10/2024

4765408

PR27C Overcurrent Protective Relay Found OOT

04/08/2024

4765606

2TS-VD061 Out of Cal

04/10/2024

4765621

Low Fuel Oil Pressure 2DG01KB

04/11/2024

4765868

Results for 2B EDG Fuel Injector Testing

04/09/2024

4765889

2B DG Head Tank Fuel Oil Line Leak

04/12/2024

4765921

2B DG Jacket Water/Lube Oil Hi Delta-T During Run

04/12/2024

4765926

Fuel Oil Leak on the 2B Diesel Generator

04/12/2024

4766018

2DG5277B Leakby

04/13/2024

4766034

2B DG Oil Leak 3L

04/13/2024

4766395

2B DO Sto Tk Rm FP Alarm Not Did Not Clear as Expected

04/14/2024

4775508

1B DG Semi-Annual Start Ohm Reading Higher Than

Expected

05/21/2024

4775530

Air Leak from Flange By 1DG5257B

05/21/2024

4775533

1B DG - 1L Cylinder Temperature Below Rounds Minimum

05/21/2024

Corrective Action

Documents

26886

EWP IM Calibrate Electronic Portion of Loop 2SI-0950

04/18/2024

637584

Emergency Diesel Generator (EDG) Kilovac Relay Coil

Replacement with Struthers-Dunn Model (Units 1 & 2)

001

Engineering

Changes

637584

Emergency Diesel Generator (EDG) Kilovac Relay Coil

Replacement with Struthers-Dunn Model (Units 1 & 2)

001

71111.24

Miscellaneous

Transient

Combustible

Permit #566

2B Diesel Generator Work Window

04/07/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1/2BHSR DG-1

Diesel Generator 18 Month Electrical Inspection

1BOSR

5.5.8.CC.5-2c

Unit One Comprehensive Inservice Testing (IST) Surveillance

Requirements for Component Cooling Pump 1CC01PB

2BOSR 3.1.7-44

Channel Operation Test of Power Range Channel N44

2BOSR

5.5.8.RH.5-2a

Unit Two, Group A, Inservice Testing (IST) Requirements for

Residual Heat Removal Pump 2RH01PB

2BOSR 7.5.4-2

Unit Two Diesel Driven Auxiliary Feedwater Pump Monthly

Surveillance

2BOSR 8.1.12-2

Unit Two 2B Diesel Generator ESF Actuation Test Signal

Start, Non-Emergency Trip Bypass Test, And Generator

Differential Trip Test

2BOSR 8.1.14-1

Unit Two 2A Diesel Generator 24 Hour Endurance Run and

Hot Restart Test

2BOSR 8.1.2-1

Unit Two 2A Diesel Generator Operability Surveillance

2BOSR DG-12

Unit Two 2B Diesel Generator Lockout Surveillance

2BOSR DG-3

Unit Two 2B Diesel Generator Relay Operation Verification

2BOSR DG-R1a

Unit Two 2A Diesel Generator Overspeed Trip

Surveillance - 18 Month

BISR 2SI-0950

Surveillance Calibration of Accumulator Tank 2A Level

Loop 2SI-0950

BISR 2SI-0952

Surveillance Calibration of Accumulator Tank 2B Level

Loop 2SI-0952

Procedures

BMP 3208-1

Emergency Stand-by Diesel Generator

Engine 6-Year / 20-Year Surveillance

5088141

2DG01KB-X2 LWR JKT Water Cooler Leaking 2B DG

04/15/2024

5156402

2B DG Jacket Water Leak

04/15/2024

5165614

2B DG: Fuel Injector Return Headers Weeping By 1R and 10L

04/15/2024

5197633

2PL08J Replace DG Local Control Panel Kilovac Relays

04/15/2024

282402

2DG01KA 6 Year Mechanical Inspection

05/13/2024

297630

2PL07J Replace DG Local Control Panel Kilovac Relays

04/30/2024

22680

U-2 COT of Power Range Channel N-44 (WK C)

06/14/2024

23467

EWP EM Replace Solenoid Valve - 2DG5223B

04/15/2024

Work Orders

23467

Replace Solenoid and Valve

04/15/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

23468

Replace Solenoid and Valve

04/15/2024

26885

Cal Of the Accumulator Tank Level 2L-0952 Tank 2B

04/18/2024

5355183

4KV Relay Routine Calibration (2A DG)

04/27/2024

5355184

(NEIL) - Diesel Generator Electrical Inspection

04/27/2024

5355185

(NEIL) - Mechanical Inspection

05/02/2024

5366338

(NEIL) - Mechanical Inspection

04/15/2024

5366339

(NEIL) - Diesel Generator Electrical Inspection

04/15/2024

21359

2DG01KA Wear Metal Contamination in Oil Sample

05/09/2024

22619

(NEIL) - 1B Diesel Generator Operability Surveillance

05/21/2024

5476146

2RH01PB Group A IST Requirements for RH Pump

04/17/2024

22576

LR - (SAMPLE) 2B Diesel Generator

04/15/2024

27861

(NEIL) - 1SI01PA Group A IST Requirements for Safety

Injection Pump

06/29/2024

27887

LR - (Sample) 2A Diesel Generator

05/02/2024

5547445

2BOSR 7.5.4-2, 2B AF PP Run

06/12/2024

AR 04734836

Rad Monitor Exempt Source Cl-36 Found in Training

01/23/2024

AR 04736740

Four Exempt Sources Found in Training

01/26/2024

Corrective Action

Documents

AR 04773838

Correction to Shipment Records Identified in Self-Assessment

05/13/2024

Miscellaneous

10CFR61 Waste

Stream Analysis

23 DAW

23 Dry Active Waste Analysis

07/25/2023

BOP CP-28

Resin Transfer to a Receiving Container for Radioactive

Disposal

BYR-20-001

RP-AA-500-1003 Compliance Program

CY-AA-110-200

Sampling

CY-BY-110-600-

F-01

Special Sample/Analytical and Technician Task Request

RP-AA-600-1018

Gross Gamma Characterization of Resin Liners

RP-AA-605

CFR 61 Program

RP-AA-631

Dry Radioactive Waste Generation and Reduction

RW-AA-100

Process Control Program for Radioactive Wastes

Procedures

SY-AA-103-500

Access Authorization Program

71124.08

Self-Assessments

AR 04767709

Radioactive Solid Waste Processing and Radioactive Material

05/20/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Handling, Storage, and Transportation, 71124.08

BY-24-020

Shipment BY-24-020 UN3321 LSA-II; Resin Liner

PO710836-20 in Cask 14-215H

05/20/2024

RWS23-20

Shipment RWS23-20 UN3321 LSA-II; Resin Liner

RO704140-27 in Cask 14-210H

07/17/2023

RWS23-22

Shipment RWS23-22 UN3321 LSA-II; Resin Liner

PO708809-10 in Cask EXE-001

07/28/2023

Shipping Records

RWS23-23

Shipment RWS23-23 UN2916 Type B; Resin Liner

PO708809-11 in Cask RT-100

09/29/2023

LS-AA-2090

Monthly Data Elements for NRC ROP Indicator - Reactor

Coolant System (RCS) Specific Activity

various

LS-AA-2140

Monthly Data Elements for NRC ROP Indicator - Occupational

Exposure Control Effectiveness

various

LS-AA-2150

Monthly Data Elements for NRC ROP Indicator - RETS/ODCM

Radiological Effluent Occurrences

various

NRC

Performance

Indicator Data

Mitigating Systems - Safety System Functional Failures

April 2023

through

March 2024

NRC

Performance

Indicator Data

Mitigating Systems - Mitigating System Performance Index for

Emergency AC Power; April 2023 through March 2024

April 2023

through

March 2024

71151

Miscellaneous

NRC

Performance

Indicator Data

Mitigating Systems - Mitigating System Performance Index for

High Pressure Injection

April 2023

through

March 2024

4388992

2B EDG Rocker Arm Sticking

2/09/2020

Corrective Action

Documents

4771539

2A EDG Excessive Clattering on the 7R Cylinder Valve Train

05/02/2024

Miscellaneous

17-13429-002

Palo Verde Engineering Evaluation of Diesel Generator Rod

Bolt Stretch Measurements

09/27/2013

24112

LR-Perform 2 Year Inspection of the Diesel Generator

2/01/2020

71152A

Work Orders

5113241

Rebuild Removed Intake DG Rocker Arms (Critical Spare)

08/31/2021

4686508

0FP03PB 0B FP Leaking Coolant

06/23/2023

4688979

0B FP Pump Unexpected Alarm

07/06/2023

4690382

0B Fire Pump Surveillance Issue

07/13/2023

71152S

Corrective Action

Documents

4705875

0FP03PB Fuse Needed to Be Reseated

09/29/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

27152

0FP03PB - 0B Fire Pump

01/08/2024

4754138

0B Fire Pump Discharge Pressure High During Monthly Run

2/29/2024

4765136

0FP03PB Diesel Crank Case Oil Low Viscosity

04/10/2024

4770010

0FP03PB Head Gaskets Compromised

04/27/2024

4772609

0FP03PB Diesel Confirmatory Oil Sample Results

05/07/2024

4774406

0FP03PB Diesel Engine Head Gasket Negative Trend

05/15/2024

4774816

0FP03PB Diesel Engine Fuel Dilution Negative Trend

05/17/2024

4776335

0B Fire Pump High Discharge Pressure

05/24/2024

4782149

0B Fire Pump Loss of Power Alarm

06/21/2024

Engineering

Changes

638808

Revise BYR98-224 to Include New Vendor Pump Curve for

Replacement 0FP03PB

CC-AA-309-1001-

F-01

Design Analysis Cover Sheet Form BYR98-224

CC-QQ-209-F-01

Approved Fire Protection Program Configuration Change

Impact Review EC 638808

Miscellaneous

EN-AA-103-F-02

Environmental Screening Checklist EC 638808

Procedures

0BOSR 10.b.6-1

Diesel Fire Pump Monthly Surveillance

29