IR 05000454/2022004

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000454/2022004 and 05000455/2022004
ML23031A287
Person / Time
Site: Byron  
Issue date: 02/01/2023
From: Petersen H
NRC/RGN-III/DORS/RPB3
To: Rhoades D
Constellation Energy Generation
References
IR 2022004
Download: ML23031A287 (1)


Text

SUBJECT:

BYRON STATION - INTEGRATED INSPECTION REPORT 05000454/2022004 AND 05000455/2022004

Dear David Rhoades:

On December 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station. On January 17, 2023, the NRC inspectors discussed the results of this inspection with Harris Welt, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Hironori Peterson, Chief Reactor Projects Branch 3 Division of Operating Reactor Safety Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000454 and 05000455

License Numbers:

NPF-37 and NPF-66

Report Numbers:

05000454/2022004 and 05000455/2022004

Enterprise Identifier:

I-2022-004-0045

Licensee:

Constellation Energy Generation, LLC

Facility:

Byron Station

Location:

Byron, IL

Inspection Dates:

October 01, 2022 to December 31, 2022

Inspectors:

B. Bartlett, Senior Operations Engineer

J. Cassidy, Senior Health Physicist

G. Hansen, Senior Emergency Preparedness Inspector

R. Knutson, Illinois Emergency Management Agency

J. Masse, Acting Resident Inspector

G. Roach, Senior Operations Engineer

J. Robbins, Senior Resident Inspector

J. Weigandt, Acting Senior Resident Inspector

Approved By:

Hironori Peterson, Chief

Reactor Projects Branch 3

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities, the unit remained at or near full power for the remainder of the inspection period.

Unit 2 began the inspection period operating at full power. Due to an issue with automatic voltage control equipment associated with the main generator, the generator was taken offline in order to implement corrective actions. The unit began reducing power on the evening of December 16, 2022, and the output breaker was opened in the early morning hours on December 17, 2022. Reactor power was reduced from full power to approximately 15 percent during this evolution. Corrective actions were completed on the evening of December 17, 2022, and the generator was brought online and power was raised. Full power was achieved on the morning of December 18, 2022. The unit remained at or near full power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures on December 1, 2022.

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending high winds on November 5, 2022.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)2B emergency diesel generator (EDG) starting air with a dryer out of service on October 17 and 18, 2022

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the control room ventilation system on September 22, 2022.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1 & 2, A and B Train auxiliary feedwater (AF) pumps on October 21, 2022
(2) Unit 1 & 2, A and B Train essential service water (SX) pump rooms on November 15, 2022

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating tests administered from October 18, 2021 through December 10, 2021.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

(1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on October 21, 2022.

Annual Requalification Operating Tests The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.

Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated the performance of an On-Watch Operations Shift Crew in the Control Room during generator Automatic Voltage Regulator replacement on December 16 and 17, 2022.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a complex casualty graded scenario by a crew of licensed plant operators in the facility's simulator on October 18, 2022.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1)2A EDG work window, as documented in Work Orders (WOs) 5096009, 5067415,

===5067416, 5070711, and 5070714 on October 3 through 8, and October 12, 2022

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01)===

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Evaluation of the emergent work associate with 1FW-530B, as documented in WO 5301980 and Issue Report (IR) 4529642 on October 17, 2022
(2) Evaluation of the planned work associated with 1B AF battery replacement, as documented in WO 5173533 on October 21, 2022
(3) Direct current charger 111, as documented in WO 5000925-1 on October 27, 2022
(4) Evaluation of the planned work associated with 2C steam generator power operated relief valve, as documented in WO 5302060 and IR 4523122 on October 26, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Evaluation of the operability of the 2B EDG following identification of a degraded starting air and a cooler leak, as documented in IRs 4525597, 4520402, and 4529716 on October 17, 2022
(2) Evaluation of the operability of the 1C Reactor Containment Fan Coolers (RCFC)following identification of a degraded control circuit as documented in IR 4530816 on October 20 and 21, 2022
(3) Evaluation of the operability of the direct current (DC) bus 112 following identification of a degraded cross-tie breaker, 1DC06E-DF1, as documented in IR 4528942 on October 27, 2022
(4) Evaluation of the operability of the 2B EDG following identification of a degraded fitting, as documented in IR 4536285 on November 18, 2022
(5) Evaluation of the operability of the 1D RCFC and leak detection following identification of a leak in containment, as documented in IRs 4538679 and 4538981 on November 23, 2022

71111.18 - Plant Modifications

Severe Accident Management Guidelines (SAMG) Update (IP Section 03.03) (1 Sample)

The inspectors verified the site SAMGs were updated in accordance with the Pressurized Water Reactor Generic Severe Accident Technical Guidelines and validated in accordance with Nuclear Energy Institute (NEI) 14-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents, Revision 1, as follows:

(1) Changes to the Byron Unit 1 and Unit 2 SAMGs were reviewed on November 9, 2022.

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1) Functional and operational testing of the 2SI8811B residual heat removal suction valve following relay work, as documented in WOs 5077907, 5126886-2, 5280816, and 5155721 on October 18, 2022
(2) Functional and operational testing of the 1B AF pump following battery replacement, as documented in WO 5173533 on October 20, 2022
(3) Functional and operational testing of various residual heat removal valves, following motor operated valve (MOV) motor replacement and MOV operator inspections, as documented in various work orders on November 1, 2022

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (1 Sample)

(1)1N44 power range nuclear instrument channel operational test, as documented in WO 5142373 on October 18, 2022

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the following maintenance and testing of the alert and notification system:

Annual siren inspection and maintenance records for the period from November 2020 to October 2022

Monthly alert notification system (siren) tests for the period from November 2020 to October 2022

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the Emergency Preparedness Organization.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:

Evaluation No. 22-05, Emergency Action Levels for Byron Station, March 7, 2022 This evaluation does not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) The inspectors observed and evaluated the emergency action level declaration, notification, and post exercise critique on November 9,

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Walkdowns and Observations (IP Section 03.01) (8 Samples)

The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:

(1)area radiation monitors in the auxiliary building (2)friskers used at the main exit from the radiologically controlled area (3)portable radiation protection equipment stored ready for use in the calibration facility (4)personal contamination monitors 'ready for use' at the exit from the radiologically controlled area (5)personal contamination monitors 'ready for use' at the primary access facility exit (6)continuous air monitors in the auxiliary building (7)tool and equipment monitors 'ready for use' at the exit from the radiologically controlled area (8)friskers used in the personnel decontamination room

Calibration and Testing Program (IP Section 03.02) (14 Samples)

The inspectors evaluated the calibration and testing of the following radiation detection instruments:

(1) FASTSCAN1 Whole Body Counter
(2) Ludlum 9-7, Serial Number 264357
(3) Rad Pro 5, Serial Number 0012890
(4) AMP-100, Serial Number 077023
(5) Ludlum 177, Serial Number 0025402
(6) Ludlum 3, Serial Number 0011968
(7) Ludlum 3030P, Serial Number 0012321
(8) Telepole, Serial Number 334965
(9) RADeCO HD-28, Serial Number 3090
(10) RADeCO H-809V, Serial Number 11948
(11) RADeCO AVS-28, Serial Number 6389
(12) ThermoScientific SAM-12, Serial Number 259
(13) Mirion ARGOS-5, Serial Number 161
(14) ThermoScientific PM-12, Serial Number 38 Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (2 Samples)

The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:

(1) Auxiliary Building Vent Effluent Monitor - 1RE-PR028
(2) Liquid Radwaste Effluent Monitor - 0RE-PR001

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS08: Heat Removal Systems (IP Section 02.07)===

(1) Unit 1 (July 1, 2021 through September 30, 2022)
(2) Unit 2 (July 1, 2021 through September 30, 2022)

MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)

(1) Unit 1 (July 1, 2021 through September 30, 2022)
(2) Unit 2 (July 1, 2021 through September 30, 2022)

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 1 (October 1, 2021 through September 30, 2022)
(2) Unit 2 (October 1, 2021 through September 30, 2022)

BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)

(1) Unit 1 (July 1, 2021 through September 30, 2022)
(2) Unit 2 (July 1, 2021 through September 30, 2022)

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) January 1, 2021 through June 30, 2022 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
(1) January 1, 2021 through June 30, 2022 EP03: Alert and Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
(1) January 1, 2021 through June 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On January 17, 2023, the inspectors presented the integrated inspection results to M. Welt, Site Vice President, and other members of the licensee staff.

On October 21, 2022, the inspectors presented the biennial licensed operator requalification program inspection results to A. Schuerman, Plant Manager, and other members of the licensee staff.

On October 31, 2022, the inspectors presented the emergency preparedness inspection results to A. Schuerman, Plant Manager, and other members of the licensee staff.

On November 2, 2022, the inspectors presented the radiation protection inspection results to S. Leach, Senior Manager Site Radiation Protection, and other members of the licensee staff.

On November 28, 2022, the inspectors presented the emergency action level and emergency plan changes inspection results to G. Armstrong, Principal Regulatory Engineer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

4535012

0B Essential Cooling Tower Switchgear Room Heaters

11/05/2022

Miscellaneous

Certification of 2023 Winter Readiness

10/12/2022

0BOSR XFT-A4

Freezing Temperature Equipment Protection Protected Area

Buildings Ventilation Systems and Tanks

1BOA ENV-1

Adverse Weather Conditions Unit 1

101

2BOA ENV-1

Adverse Weather Conditions Unit 2

101

71111.01

Procedures

OP-AA-108-111-

1001

Severe Weather and Natural Disaster Guidelines

4460406

0VC33 Indicated Intermediate When Fully Closed

11/12/2021

4490148

0VC24Y Damper Failed to Reposition

04/04/2022

4510429

0VC01CB Failed to Start

07/12/2022

23857

Hydramotor Damper Actuator 0FZ-VC024A Excessive

Cycling

09/21/2022

Corrective Action

Documents

4535389

Control Room Ventilation - Operational Margin

11/07/2022

6E-2-4030DG14

Schematic Diagram Diesel Generator 2A and 2b Starting Air

Compressors Air Dryers 2DG01SA-C, 2DG01SA-D,

2DG01SB-C and 2DG01SB-D Unit 2

N

M-96, Sheet 1

Diagram of Control Room HVAC System

AG

M-96, Sheet 2

Diagram of Control Room HVAC System

AK

M-96, Sheet 3

Diagram of Control Room HVAC System

U

M-96, Sheet 4

Diagram of Control Room HVAC System

S

Drawings

M-96, Sheet 5

Diagram of Control Room HVAC System

G

BOP DG-E2B

Diesel Generator Train B Electrical Lineup (Unit 2)

BOP VC-1

Startup of Control Room HVAC System

71111.04

Procedures

BOP VC-6

Removing the Control Room HVAC System Makeup Air

Filter Unit and Recirculation Charcoal Absorber from Service

PFP AB 364-0 FZ

11.3-0 N

Pre-Fire Plan Auxiliary Building 364-0 Elevation General

Area South FZ 11.3-0 North Plan #113

PFP AB 364-0 FZ

11.3-0 S

Pre-Fire Plan Auxiliary Building 364-0 Elevation General

Area South FZ 11.3-0 South Plan #111

71111.05

Fire Plans

PFP AB 383-0 FZ

Pre-Fire Plan Auxiliary Building 383-0 Elevation General

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

11.4-0 N

Area North FZ 11.4-0 North Plan #132

PFP AB1 330-0

FZ 11.1A-0

Pre-Fire Plan Auxiliary Building Unit 1 330-0 Elevation

Essential Service Water Pump Room 11.1A-0 Plan #96

PFP AB1 383-0

FZ 11.4A-1

Pre-Fire Plan Auxiliary Building Unit 1 383-0 Elevation 1B

Auxiliary Diesel Feedwater Pump and Day Tank Room FZ

11.4A-1 Plan #137

PFP AB2 330-0

FZ 11.1B-0

Pre-Fire Plan Auxiliary Building Unit 2 330-0 Elevation

Essential Service Water Pump Room 11.1B-0 Plan #97

PFP AB2 383-0

FZ 11.4A-2

Pre-Fire Plan Auxiliary Building Unit 2 383-0 Elevation 2B

Auxiliary Diesel Feedwater Pump and Day Tank Room FZ

11.4A-2 Plan #138

Miscellaneous

FPR Chapter 2.3

Fire Area Analysis

71111.11A

Procedures

TQ-AA-150-F25

LORT Annual Exam Status Report

2/16/2022

IR 4374611

4.0 Critique - Unit 2 Coming Offline for B2R22

10/05/2020

IR 4385365

Exam Security Violation

11/12/2020

IR 4392268

4.0 Critique - Fire Protection Pipe Rupture

2/27/2020

IR 4408207

Exam Security Violation

03/10/2021

IR 4412081

4.0 Critique of Ramp to Full Power Following Unit 1 Turbine

Valve Testing

03/28/2021

IR 4454672

Exam Security Violation

10/20/2021

IR 4503844

4.0 Critique for 2BOA INST-2 Entry

06/05/2022

IR 4512760

Exam Security Violation

07/22/2022

IR 4514848

4.0 Critique - 1BOA ROD-3 Entry Due to DRPI "B" Failure

M08

08/04/2022

IR 4515016

4.0 Critique of Pressurizer Low Pressure Alarm

08/04/2022

Corrective Action

Documents

TR 220804-002

Simulator Training on DRPI Failure and Rod Control Failures

08/04/2022

ANSI Simulator

Accuracy

45% Steady State Simulator Test

05/18/2022

ANSI Simulator

Accuracy

70% Steady State Simulator Test

05/18/2022

ANSI Simulator

Accuracy

100% Steady State Simulator Test

05/18/2022

71111.11B

Miscellaneous

Cycle 25

Transient Testing

Transient 1: Manual Reactor Trip

2/08/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Cycle 25

Transient Testing

Transient 3: Simultaneous Closure of all MSIVs

2/08/2022

Cycle 25

Transient Testing

Transient 4: Simultaneous Trip of all RCPs

2/08/2022

Cycle 25

Transient Testing

Transient 9: Maximum Steam Break

2/08/2022

Dynamic

Scenario BY-49

REQUALIFICATION SIMULATOR SCENARIO GUIDE

Dynamic

Scenario BY-54

REQUALIFICATION SIMULATOR SCENARIO GUIDE

Dynamic

Scenario BY-79

REQUALIFICATION SIMULATOR SCENARIO GUIDE

Dynamic

Scenario BY-85

REQUALIFICATION SIMULATOR SCENARIO GUIDE

JPM N001b

Raise Accumulator Level With 1B SI Pump (1SI8821A Fails

to Close)

JPM N004

Lower SI Accumulator Pressure

JPM N027a

Perform an Emergency Boration

JPM N029

Rod Drive MG Set Startup

JPM N033

Shutdown the _B Auxiliary Feed Pump Locally

JPM N054a

Respond to a WS System Malfunction (0A WS Pump

Rotating Backwards)

JPM N056b

Local Start of _B AFW Pump

JPM N084

Synchronize a SAT to a Bus being Fed by a DG Following

Surveillance

JPM N114

Cross-Tie DC Bus _11/_11

JPM N123

Respond to High Radiation in Aux Building (Align VA)

JPM S017t

Classify Event and Fill Out a NARS Form (Loss of Heat

Sink)

JPM S026t

Classify Event and Fill Out a NARS Form (Low SFP Level)

OP-AA-105-102

Reactivation of License Log

04/14/2020

OP-AA-105-102

Active License Tracking Log - 1st, 2nd, and 3rd Qtr 2022 a

Total of 36 Samples

03/18/2022

TQ-AA-201

Examination Security and Administration

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

TQ-AA-306-F-02

Simulator Review Board Minutes

06/24/2021

TQ-AA-306-F-02

Simulator Review Board Minutes

2/13/2021

TQ-AA-306-F-02

Simulator Review Board Minutes

04/12/2022

TQ-AA-306-F-03

Advanced Nuclear Dispatch Ramp Comparison to Plant

Event

04/27/2020

TQ-AA-306-F-03

Advanced Nuclear Dispatch Ramp Comparison to Plant

Event

07/24/2020

TQ-AA-306-F-20

19-3-1 Out of the Box Evaluation Scenario Based Testing

05/13/2019

TQ-AA-306-F-20

22 NRC Annual Operating Test Dynamic Scenario BY-85

Scenario Based Testing

06/20/2022

SWR 0135330

1B RCP Fails to Trip on Loss of DC Bus 112

06/17/2019

SWR 0135778

Incorrect Simulator Response to Loss of Offsite Power

01/09/2020

SWR 0137649

MPT Heat Up Model May Be Incorrect

03/26/2022

SWR 0137655

EC 636727 EH Reservoir Level Transmitter and PPC Alarm

03/31/2022

SWR 0137688

EC 634802 Unit 1 MPT Monitoring and Logic Changes

04/23/2022

Work Orders

SWR 0137924

EC 634801 Auto Runback FW Ovation

08/25/2022

2BGP 100-3

Power Ascension

103

2BGP 100-4

Power Descension

2BGP 100-8

Generic Reactor Control Guidance

71111.11Q

Procedures

BOP CV-6T2

Transient RCMS Operation in Borate Checklist

5067415

LR-2A DG Upper and Lower JW HX GL 89-13 Inspection

10/08/2022

5067416

LR-2A DG Jacket Water Upper Cooler Eddy Current Testing

10/06/2022

5070711

LR Perform DG Lube Oil Cooler Eddy Current Inspection

10/08/2022

5070714

LR Perform DG Lube Oil Cooler Eddy Current Inspection

10/08/2022

5071031

Replace and/or Calibrate AMOT Engine Trip Device

10/06/2022

5096009

(NEIL)-Mechanical Inspection

10/08/2022

71111.12

Work Orders

21101

2PS-DG077A Tubing Leak

10/06/2022

Corrective Action

Documents

23122

2MS018JC Tach Loss light blinking

09/17/2022

71111.13

Corrective Action

Documents

Resulting from

Inspection

4533710

NRC Question about DC112 Cross-Tie Breaker

10/31/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

5000925-1

EWP EM Replace Sensing/Current Limit, Amplifier/ Firing

Board

10/27/2022

5173533

AF Battery Surveillance Results Below Admin Limit

10/20/2022

5301980

Failed FW Flow Channel

10/16/2022

Work Orders

5302060

EWP IM T-Shoot 2MS018JC 2C MS PORV TACH Loss

Light Blinking

10/26/2022

4446687

2 Bus DF1 Crosstie Breaker Stuck Off (1DC06E-DF1)

09/16/2021

28942

DC 112 Cross-Tie to 212 Breaker Latch Misaligned

10/13/2022

4530816

1C RCFC Hi Speed Breaker / Control Switch Issue

10/20/2022

4536285

2B DG Tripped Shortly After Post-Maintenance Start

11/10/2022

4538679

Abnormal Level Rise of Containment Floor Drn Sump

11/22/2022

71111.15

Corrective Action

Documents

4538981

1VP01AD 1D RCFC SX Coil Assy Leak-Top Left When

Looking @ Rx

11/25/2022

71111.18

Miscellaneous

PWROG-15015-P

PWROG Severe Accident Management Guidelines

Corrective Action

Documents

4530249

Request New Predefine and Procedure

10/18/2022

04769515-02

OPs PMT - Stroke 2SI8812A

10/31/2022

04990298-03

OPs PMT - Stroke and PIT 2CC9412A

10/31/2022

05136304-02

OP PMT: Verify Proper RH Pump Motor Oil Level

10/31/2022

05136975-03

OPs PMT - Stroke Valve 2AP21E-F2 (2RH610)

10/31/2022

05187012-04

OPs PMT - PIT & Stroke Test 2SI8812A

10/31/2022

4844150

1SX01PA Replace All (4) Breathers

10/25/2022

4844348-2

OP PMT - 1SX01PA Function / Leak Check

10/25/2022

5070007-2

OP PMT - Vibe Check 1BOSR 5.5.8.SX.5-1C

10/26/2022

5070007-3

OP PMT - Bearing Temperatures

10/26/2022

5077907-3

OPS - PMT Stroke 2SI8811B

10/18/2022

5100624-2

OPS PMT - Functional Test to Run Fan After Relay

Replacement

10/25/2022

26886-2

2BOSR 5.2.5-1, TRN B ECCS Valve Auto Actuation Test

10/18/2022

5155721

2BOSR 0.5-2.RH.4-2, STT for 2RH611 (Week H)

10/18/2022

280816

(NEIL)- 2RH01PB Group A IST Requirements for RH Pump

10/18/2022

71111.19

Work Orders

295767

(NEIL)- LR-1SX01PA COMPREHENSIVE IST REQ FOR SX

PUMP

10/26/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.22

Work Orders

5142373

1BOSR 3.1.7-44, N-44 COT (WK H)

10/18/2022

IR-04391847

Relocation of Byron Back Up Siren Repeater

2/23/2020

IR-04393996

EP-SIREN FAILURE (BY02,BY06)

01/05/2021

IR-04434891

EP-SIREN FAILURE (BY44)

07/14/2021

IR-04464945

Sirens BY01 & BY43 Indicated an Issue During Growl Test

2/06/2021

Corrective Action

Documents

IR-04516960

EP-SIREN FAILURE (BY41)

08/15/2022

Byron Station 2020 Warning System Maintenance &

Operational Reports

11/01/2020 -

2/31/2020

Byron Station 2021 Warning System Maintenance &

Operational Reports

01/01/2021 -

2/31/2021

Byron Station Monthly Siren Availability Reports

10/01/2020-

08/30/2022

Byron Station Siren Corrective Maintenance Reports

10/01/2020-

09/30/2022

U.S. Department of Homeland Security, FEMA Letter;

Backup Alert and Notification System

2/10/2012

Exelon Nuclear Manager, Midwest Emergency

Preparedness Letter to Program Enhancement Manager,

Illinois Emergency Management Agency; Submission of

Byron Generating Station Public Alert and Notification

System (ANS) Design Report' Revision 3

10/01/2018

Miscellaneous

KLD-TR-986

Byron Generating Station Alert and Notification System

(ANS) Design Report

09/19/2018

Offsite Emergency Plan Alert and Notification System

Addendum for Byron Nuclear Power Station

EP-AA-1002

Radiological Emergency Plan Annex for Byron Station

71114.02

Procedures

EP-BY-1000

Byron Station Radiological Emergency Plan

IR-04390048

ERO Vacancies Identified - New Members Needed

2/14/2020

IR-04421036

SM DEP Failure During Simulator Evaluation

05/03/2021

Corrective Action

Documents

IR-04497196

ERO Qualifications

05/02/2022

Quarterly Unannounced Off-Hours Call-In Augmentation Drill

Results

11/01/2020 -

09/30/2022

Emergency Response Organization Duty Team Roster

09/21/22

71114.03

Miscellaneous

ERO Staff Training Records Review (Sample - 15)

10/19/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EP-AA-112-600

PIO Organization Activation and Operation

EP-AA-1002,

Addendum 1

On-Shift Staffing Technical Basis

EP-AA-112

Emergency Response Organization (ERO) / Emergency

Response Facility (ERF) Activation and Operation

EP-AA-112-100-

F-06

ERO Notification or Augmentation

Z

EP-AA-112-200

TSC Activation and Operation

EP-AA-112-300

OSC Activation and Operation

EP-AA-112-400

EOF Activation and Operation

EP-BY-1000 Part

II, Section B

Byron Station Emergency Response Organization

EP-BY-1000, Part

III, Appendix 5

Emergency Response Organization (ERO) Staffing and

Augmentation Plan

Procedures

TQ-AA-113

ERO Training and Qualification

Miscellaneous

Q 22-05

Emergency Action Levels for Byron Station

03/07/2022

EP-AA-1002,

ADDENDUM 3

Emergency Action Levels for Byron Station

71114.04

Procedures

EP-AA-1002,

ADDENDUM 3

Emergency Action Levels for Byron Station

IR-04375471

NRC Red Phone in the MCR

10/09/2020

IR-04395275

TSC Phone Issues

01/11/2021

IR-04429245

Evaluation of EAL HU6 Due to Rockton Chemical Plant Fire

06/14/2021

IR-04480659

Potential Gap in Addressing Public Address Speaker Issues

2/25/2022

IR-04493027

Byron Station NRC Phone Lines Inoperable

09/09/2022

Corrective Action

Documents

IR-04521532

Byron Station NRC Phone Lines Inoperable

04/14/2022

Byron 8 Year EP Drill / Exercise Cycle Objectives Table

10/19/2022

Byron 2021 Medical / Health Physics Drill Report

2/15/2021

Byron 2022 Off-Year Exercise Evaluation Report

09/20/2022

Byron Station 2021 Accountability Drill Report

01/04/2022

Emergency Preparedness Tabletop Drill Report

08/05/2022

Byron 2021 Health Physics Drill Report

06/16/2021

71114.05

Miscellaneous

Off-site Response Letters of Agreement for Emergency Plan

11/01/2020 -

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Implementation

10/31/2022

21/2022 Emergency Planning for the Byron Area

(Community Information Booklet)

01/01/2021

22/2023 Emergency Planning for the Byron Area

(Community Information Booklet)

01/01/2022

EP-BY-124-F-01

Byron Control Room/Simulator Inventory Records

10/01/2020-

09/30/2022

EP-BY-124-F-02

Byron Technical Support Center Inventory Records

10/01/2020-

09/30/2022

EP-BY-124-F-03

Byron Operations Support Center Inventory Records

10/01/2020-

09/30/2022

EP-BY-124-F-05

Field Team Inventory Records

10/01/2020-

09/30/2022

EP-BY-124-F-06

Medical Response Kit (Ambulance) Inventory Records

10/01/2020-

09/30/2022

EP-BY-124-F-08

Monthly NARS Communications Test Records

10/01/2020-

09/30/2022

EP-BY-124-F-09

Monthly ENS Communications Test Records

10/01/2020-

09/30/2022

EP-BY-124-F-10

Quarterly Directors Hotline Test Records

10/01/2020-

09/30/2022

EP-BY-124-F-11

Quarterly Operations Status Line Test Records

10/01/2020-

09/30/2022

EP-BY-124-F-12

Quarterly Field Team Satellite Phone Test Records

10/01/2020-

09/30/2022

EP-BY-124-F-16

Byron Hospital Cabinet Inventory Records

10/01/2020-

09/30/2022

NOSA-BYR-22-

Byron Station Emergency Preparedness Audit Report

04/13/2022

EP-AA-1002

Radiological Emergency Plan Annex for Byron Station

EP-AA-1002,

Addendum 3

Emergency Action Levels for Byron Station

Procedures

EP-BY-1000

Byron Station Radiological Emergency Plan

71114.06

Miscellaneous

EP-MW-114-100-

Nuclear Accident Reporting System (NARS) Form

K

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

F-01

LS-AA-1150

Event Notification Worksheet

Procedures

EP-AA-112-100-

F-01

Emergency Director Checklist

AD

FASTSCAN1

FASTSCAN Calibration Acceptance Criteria

03/18/2021

FASTSCAN1

FASTSCAN Calibration Acceptance Criteria

06/30/2022

Serial Number

26240

AVS-28A Calibration Data Sheet

08/17/2022

Serial Number

11948

H-809V Calibration Data Sheet

08/17/2022

Serial Number

161

ARGOS-5 Calibration Data Sheet

03/21/2022

Serial Number

259

SAM-2 Calibration Data Sheet

04/15/2022

Serial Number

264357

Model 9-7 Calibration Data Sheet

07/22/2022

Serial Number

3090

HD-28 Calibration Data Sheet

04/12/2022

Serial Number 38

PM-12 Calibration Data Sheet

08/10/2022

Calibration

Records

Serial Number

8142

Shepherd Calibration Package

07/12/2022

Corrective Action

Documents

Resulting from

Inspection

AR 04534582

Two Observations - NRC Exit 71124.05 Radiation Monitoring

Instrumentation

11/03/2022

RP-AA-700

Controls for Radiation Protection Instrumentation

RP-AA-700-1209

Calibration of Shepherd Box Irradiators

RP-AA-700-1215

Calibration of Low-Vol Air Samplers

RP-AA-700-1216

Calibration of Hi-Vol Air Samplers

RP-AA-700-1235

Operation and Calibration of the PM-12 Gamma Portal

Monitor

RP-AA-700-1239

Operation and Calibration of the Model SAM-12 Small

Articles Monitor

71124.05

Procedures

RP-AA-700-1240

Operation and Calibration of the Canberra ARGOS-5

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Personnel Contamination Monitor

RP-BY-754

Calibration, Source Check, and Operation of the Ludlum 9-7

Ion Chamber

04933501 01

Calibration of Radiation Monitor 1PR28J

03/05/2021

Work Orders

05065548 01

Calibration of Radiation Monitor 0PR10J

04/12/2022

Corrective Action

Documents

IR-04423140

ERO Participation PI Indicator Revision February/March

21

05/12/2021

NRC Performance Indicator Data; Emergency Preparedness

- Alert and Notification System Reliability

01/01/2021 -

06/30/2022

NRC Performance Indicator Data; Emergency Preparedness

- ERO Readiness

01/01/2021 -

06/30/2022

71151

Miscellaneous

NRC Performance Indicator Data; Emergency Preparedness

- Drill/Exercise Performance

01/01/2021 -

06/30/2022

4447391

1RY8010B Failed As-Found Testing at Vendor

09/19/2021

4450104

1RY8010A Failed As-Found Testing at Vendor

10/01/2021

Corrective Action

Documents

4450108

1RY8010C Failed As-Found Testing at Vendor

10/01/2021

71153

Engineering

Evaluations

EC 635206

Byron Evaluation of Pressurizer Safety Out of Tolerance

Impact on Accident Analyses

0