MONTHYEARIR 05000454/20240032024-11-12012 November 2024 Integrated Inspection Report 05000454/2024003 and 05000455/2024003 05000454/LER-2024-002, Reactor Vessel Closure Head Penetration 31 Degraded2024-11-0707 November 2024 Reactor Vessel Closure Head Penetration 31 Degraded RS-24-122, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2024-11-0707 November 2024 Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24297A2702024-10-23023 October 2024 Notification of NRC Baseline Inspection and Request for Information: Inspection Report 05000455/2025002 RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24281A1502024-10-0707 October 2024 Request for Information for NRC Commercial Grade Dedication Inspection Report 05000454/2025010 and 05000455/2025010 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24116A1192024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24113A2892024-04-22022 April 2024 Notification of NRC Baseline Inspection and Request for Information ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) BYRON 2024-0020, Annual Dose Report for 20232024-04-18018 April 2024 Annual Dose Report for 2023 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition BYRON 2024-0021, Registration of Use of Cask to Store Spent Fuel2024-04-11011 April 2024 Registration of Use of Cask to Store Spent Fuel RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors IR 05000454/20244012024-04-0303 April 2024 Cyber Security Inspection Report 05000454/2024401 and 05000455/2024401 (Public) RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report BYRON 2024-0019, Registration of Use of Cask to Store Spent Fuel2024-03-28028 March 2024 Registration of Use of Cask to Store Spent Fuel RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000454/20230112024-03-20020 March 2024 Fire Protection Team Inspection Report 05000454/2023011 and 05000455/2023011 IR 05000454/20240102024-03-15015 March 2024 Comprehensive Engineering Team Inspection Report 05000454/2024010 and 05000455/2024010 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24297A2702024-10-23023 October 2024 Notification of NRC Baseline Inspection and Request for Information: Inspection Report 05000455/2025002 ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24113A2892024-04-22022 April 2024 Notification of NRC Baseline Inspection and Request for Information ML24053A3382024-02-22022 February 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection ML23209A7242023-07-31031 July 2023 Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 ML23198A0372023-07-17017 July 2023 Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant ML23172A1172023-06-22022 June 2023 Notification of NRC Fire Protection Team Inspection Request for Information ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23069A0342023-03-0606 March 2023 Unit 1 Lr Commitment 10 RAI Set 1 - (Non-Proprietary) ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22237A0272022-08-25025 August 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A1272022-04-26026 April 2022 Unit 2 RFI for an NRC Triennial Heat Exchanger/Sink Performance Inspection and RFI IR 05000454/2022002 05000455/2022002 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21273A3312021-10-0404 October 2021 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Byron Station ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21036A1102021-02-0404 February 2021 NRR E-mail Capture - Draft RAIs for Byron Station, Unit Nos. 1 and 2, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21004A1452020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 ML20329A4852020-11-24024 November 2020 Notification of NRC Fire Protection Team Inspection Request for Information ML20294A5492020-10-21021 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20289A1142020-10-0909 October 2020 NRR E-mail Capture - Preliminary RAIs for LAR Regarding Non-conservative TS EDG Frequency Tolerance ML20077M2212020-03-20020 March 2020 Ti 2515/194 Inspection Documentation Request ML20008D3992020-01-0808 January 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000454/2020001 ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19252C1542019-08-22022 August 2019 NRR E-mail Capture - Issuance of the Remainder of Preliminary RAIs for Braidwood/Byron TSTF-505 Application ML19232A2242019-08-0707 August 2019 NRR E-mail Capture - Partial Issuance of Final RAIs for Braidwood/Byron TSTF-505 Application ML19207A0672019-07-26026 July 2019 NRR E-mail Capture - Partial Issuance of Preliminary RAIs for Braidwood/Byron TSTF-505 Application ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19032A1062019-02-0101 February 2019 NRR E-mail Capture - Preliminary RAIs for Byron On--time Extension of Completion Time 3.8.1, A.2 ML19011A3452019-01-11011 January 2019 NRR E-mail Capture - Preliminary RAIs Regarding Byron Request to Use ATF LTAs ML18149A2842018-05-24024 May 2018 NRR E-mail Capture - B/B 50.69 RAI - Potential Typo ML18129A1082018-05-0909 May 2018 NRR E-mail Capture - Preliminary RAIs for Braidwood and Byron Stations 50.69 Amendment ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML18022A0422018-01-19019 January 2018 18 Byron Station, Units 1 and 2 - Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection (DRS-I.Hafeez) ML17179A2852017-06-28028 June 2017 NRR E-mail Capture - Request for Additional Information Regarding Braidwood and Byron Amendments to Remove Obsolete License and Technical Specification Items 2024-09-06
[Table view] |
Text
David Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BYRON STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION
Dear David Rhoades:
In a telephone conversation on September 3, 2024, between Troy Henning, Senior Operations Engineer, the NRC lead inspector for this inspection, and Peter Oliver, LOR Exam Author, final arrangements were made for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Byron Station. The inspection is planned for the week of November 18, 2024, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection.
Please furnish the items listed in the first group of the attached enclosure, needed to support our in-office inspection activities, to the NRC by November 8, 2024. Please have the items listed in the second group of the attached enclosure available for the inspectors during the onsite portion of the inspection activities. Peter Oliver has been advised of this request.
Thank you for your cooperation in this matter. If there are any questions regarding either the inspection, or the material requested in the enclosure, please contact me at 630-829-9822 or via email at troy.henning@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
September 6, 2024
D. Rhoades 2
This letter and its enclosure will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Troy J. Henning, Senior Operations Engineer Operations Branch Division of Operating Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66
Enclosure:
REQUESTED INFORMATION TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION (IP 71111.11) cc: Distribution via LISTSERV B. Lewin, Senior Site Training Manager Signed by Henning, Troy on 09/06/24
D. Rhoades 3
Letter to David Rhoades from Troy J. Henning dated September 06, 2024.
SUBJECT:
BYRON STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:
Michelle Simmons RidsNrrDorlLpl3 RidsNrrPMByron Resource RidsNrrDroIrib Resource Jack Giessner Mohammed Shuaibi Diana Betancourt-Roldan Allan Barker David Curtis Jonathan Feibus R3-DORS Ikeda Betts Maryia Bahdanovich-Kniazkova ADAMS Accession Number: ML24250A118 OFFICE RIII/DORS/OB/CE NAME THenning:gmp DATE 09/06/24 OFFICIAL RECORD COPY
Enclosure REQUESTED INFORMATION TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION (IP 71111.11)
Please provide the following information on a CD/DVD, or document upload to the BOX if possible, by November 8, 2024:
1.
One complete version of a biennial requalification written examination administered during the training cycle.
2.
Ten (10) job performance measures (JPMs) and four (4) simulator scenarios associated with an annual requalification operating test required by 10 CFR 55.59(a)(2). The JPMs and scenarios to be reviewed should include those that will be observed during the onsite portion of this inspection, with any remaining JPMs and scenarios selected from other weeks within the same training cycle.
3.
Complete versions of the reference materials used to develop the administered written examinations and operating tests. (Refer to NUREG-1021, Rev. 12, ES-2.1 Section F.4.,
Specific Reference Material to Provide, for relevant materials and clarification.)
4.
Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios.
5.
A list of licensee-identified issues associated with licensed operator performance problems which have occurred in the actual plant/main control room since the last biennial requalification program, their associated corrective actions, and if these issues were incorporated into requalification training. (These issues are likely documented in condition/problem identification reports, licensee-conducted audits and assessments, and in industry operating experience reports, etc.)
6.
Facility licensee procedures for licensed operator requalification training and examination, including examination security procedures.
7.
A schedule of the licensees examination activities during the on-site inspection week.
Please have the following information available for NRC review on November 18, 2024:
1.
Licensed operator pass/fail statistics for any NRC-required requalification examinations that have been completed.
2.
An overall schedule of the facility licensees requalification program since the last biennial inspection (cycle weeks, training topics, etc.).
3.
A list and descriptions of any examination security problems since the last biennial inspection (likely documented in training department condition/problem identification reports).
4.
Records for licensed operator requalification training attendance, licensed operator performance in requalification, licensed operator remedial training, individual licensed operator medical records, records for maintaining an active license, and any license reactivations for watch standing proficiency.
2 5.
Simulator testing, maintenance, modification, and performance records. Simulator corrective action records, including lists of open/closed simulator deficiencies, and corrective actions taken.
6.
A current list of all the licensed operators at the site, by license level, a current list of all licensed operator medical restrictions, and selected individual licensed operator medical files in support of the current license.