Monthly Operating Repts for May 1987
ML20214W349
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/31/1987
From: Hirt J, Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC
References
PLA-2866, NUDOCS 8706150223
Download: ML20214W349 (9)


Text

. .

4 AVERAGE DAILY UNIT POWER LEVEL

__.. DOCKET NO.

~

  1. "4 UNIT one s0 DATE 06/02/87
  • ^*

RIC 'M COMPLETED BY TELEPHONE (717) 542-3917 MONTH May, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (gwe. Net)

, 1040 1027

,7 2 1037 ,g 1026 3 1037 1037 39 4

1040 0 20 1039 1033 5

1037 1027 6 22 1037 1021 7 23 g 1039 1029 24 9 25 1011 10 1027 1033 26 1027 1034 Ii 27 12 1032 025 28 1039 1017

13 29 1036 1015 l

14 30 1031 1014 15 3, 16

(

INSTRUCTIONS

On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

l

, (9/77)

R g6150223870531 ADOCM 05000387

'p h PDR j

! 1

ET A

g.> - @

Q & 7 m ____ E L?--- .

J OPERATING DATA REPORT 0 \ DOCKET NO.

50-387 O

RfC S ifs DATE 06/02/87 COMPLETED BY J.A. Hirt TELEPHONE (717) 542-3917 OPERATING STATUS Unit One I. Unit Name: Susqmhanna Stearn Electric Station Notes

2. Reporting Period: May: 1927
3. Licensed Thermal Power (Mht s: 3293
4. Nameplate Rating IGross MWei: 1152 ,
5. Design Electrical Rating (Net MWel: 1065 l
6. Maximum Dependable Capacity (Gross Mhel: 1068 -
7. Maximum Dependable Capacity (Net MWei: 1032 i
8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Give Reasons:

Nom

9. Power Level To which Restricted. If Any (Net MWe): None
10. Reasons For Restrictions,if Any: N/A This Month Yr.-to-Date Cumularise i1. Hours in Reporting Period 744 3,623 34,896
12. Number Of Hours Reactor Was Critical 744 3,331 25,518.5
13. Reactor Reserve Shutdown Hours 0 0 812.7
14. Hours Generator On-Line 744 3,303.8 24,917.8
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated lMWH) 2,440,152 10,454,515 /b,/J/,633
17. Gross Electrical Energy Generated (MWH) 794,060 3,416,934 25,004,472
18. Net Electrical Energy Generated IMWH) 767,001 3,295,635 23,970,664
19. Unit Service Factor 100.0 91.2 71.4 100.0 M2
20. Unit Availability Factor 71.4
21. Unit Capacity Factor IUsing MDC Net) 99.9 _ 88.1 66.6
22. Unit Capacity Factor IUsine DER Net, 96.8 _ O4 64.5
23. Unit Forced Outage Rate 0.0 8.8 10.9
24. Shutdowns Scheduled Over Next 6 Months IType. Date, and Duration of Eaen r A Refueling Outage is scheduled to begin September 12, 1987 ard end November 27, 1987. The duration is 76 days.
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L ChlTICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION p,-,

e

4 AANN4 O

],,q$ .\ 47 n... ,a y -

UNITSHUTDOWNS AND POWER REDUC 110NS DOCKET NO. 50-387

@ UNIT NAME SSES - Unit One 6/02/87 DATE kic Si REPORT MONTH May, 1987 COMPLETED gy .J.A. Hirt TELEPHONE (717)542-3917 n.

e

- E E

, .$ g }g Y3 Licensee ,E g f'. Cause & Corrective No. Date g 3g ,j$ Event g gO8 Action to H 5 mu

$I j@g Report a g Prevent Recurrence 5

There were ro unit shutdowns or power reductions for the month of May, 1987.

I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G - Instructions A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E Operator Training & License Examination from previous month F-Administrative 5 G-Operational Error (Explain) 5-Reduction Exhibit I - Same Source (9/77) II-Other (Explain) 9-Other

3 o ..

SUSQlEHANNA STEAM EIECI'RIC STATION Docket Nunber 50-387 Date 06/02/87 Cmpleted by J. A. Hirt Telephone (717) 542-3917 Challenges to Main Steam Safety Relief Valves None Changes to the Offsite Ibse Calculation Manual None Major Changes to Radioactive Waste Treatment Systms None

[ AVERAGE DAILY UNIT POWER LEVEL tt)

] ._.. 3 DOCKET NO.

50-388 e =dJ UNIT Two

$ @ [ Dm 06/02/87

?ggg gTh COMPLETED BY J.A. Hirt TELEPHONE (717)542-3917 MONTH May, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net)

I 1051 17 1031 2 1049 33 1027 3 g, 1038 4 1051 1052 3 21 1031

' 22 1027 1046 1021 7 23 g 048 1030 24 1045 9 25 in33 10 D 26 1032 1036 II 27 1034 12 1040 1026 28 13 1047 1018 29 g4 1045 1016 30 1043 1017 15 31 16 1047 INSTRUCTIONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

A944

_g_h of W

+

7 3

LN J OPERATING DATA REPORT O \ DOCKET NO.

50-388 ODhg SY% DATE 06/02/87 COMPLETED BY J.A. Hirt TELEPHONE (717) 542-7917 OPERATING STATUS Unit 'No I. Unit Name:

2. Reporting Penod: May, 1987
3. Licensed Thermal Power (MWri: 3293
4. Nameplate Rating (Gross MWep: 1152
5. Design Electrical Rating INet MWel: 1065
6. Maximum Dependable Capacity (Gross MWe): 1068
7. Maximum Dependable Capacity (Net MWe): 1032
8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reasons:

Mnm ne .

9. Power Level To which Restricted. If Any INet MWep:
10. Reasons For Restrictions,if Any: N/A This Month Yr. to.Date Cumulatne
11. Hours in Reporting Period 744 3,623 20,135
12. Number Of Hours Reactor Was Critical 744 3,347 16,455 v 0 717.9
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 744 3,294.6 16,023.9
15. Unit Resene Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 2,448,147 10.594,919 49,987,804 17 Gross Electrical Energy Generated (MWH) 797,896 3,486.726 16,391,020
18. Net Electncal Energy Generated IMWH) 771,596 _,_3,368,065 15,770,594
19. Umt Service Factor 100.0 90.9 79.6
20. Unit Asailability Factor

. 100.0 90.9 79.6

21. Unit Capacity Factor (Using MDC Nett 100.5 _

90.1 75.9

22. Unit Capacity Factor IUsing DER Net) 97 4 _

87.3 73.5

23. Unit Forced Outage Rate 0.0 9.1 11.8
24. Shutdowns Scheduled No shutdowns areOver sciNestuled 6 % witfun onths tTvpe. Qate and the next Dur: tion of Eae:hi 6 nont .
25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status IPrior to Commercial Operation): Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY

, COMMERCIAL OPER ATION

,.,.-i e

p NN4 .

3 - '

M 9 '

50-388 8

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

y g 2 UNIT NAME f M DATE 06/02/87

  1. fC S REPORT MONT11 MaV, 19g7 COMPLETED BY J. A. Hirt TELEPHONE (717)542-3917 e.

e .

E ~6

- E "E

  • E5 Licensee E* E*L Cause & Corrective N. i. Date h j! k )j5 Event

{i Action to F

f= 5 Report a mO hO j ;75 g g Prevent Recurrence d

There were no unit shutdowns or power reductions for the nonth of May, 1987.

I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G . Instructions A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

EOperator Training & Ucense Examination from previous month F-Administrative 5 Goperational Error (Explain) 5-Reduction Exhibit I - Same Source 19/77) llother(Esplain) 9-0ther

SUSQlEHANNA STEAM ELFCfRIC STATION Docket Nunber 50-388 .Ihte 06/02/87 Completed by J. A. Hirt Telephone (717) 542-3917

/

Challenges to Main Stean Safety Relief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systerrs None.

t L

PPaL Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101

Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEllANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 PLA-2866 FILE R41-2A 50-388/NPF-22

Dear Mr. Beebe:

The May 1987 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, H. W. Keiser Vice. President-Nuclear Operations Attachment cc: Document Control Desk (Original)

NRC Region I Hr. L. R. Plisco - NRC Resident Mr. M. C. Thadani - NRC Project Manager g6 N s}'