MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
I j
Vinoisir EimcTunc AND POWER CONH%NY Ricusu> sin, hGINI A 23261
{
October 8,1999 i
United States Nuclear Regulatory Commission Serial No.99-516 ,
Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos. 50-338 i 50-339 l License Nos. NPF-4 !
NPF-7 )
i Gentlemen:
}
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 l
MONTHLY OPERATING REPORT
{
Enclosed is the September 1999 Monthly Operating Report for North Anna Power Station Units 1 and 2.
Very truly yours, OMM~
W. R. Matthews I
Site Vice President i i
Enclosure !
Commitments made in this letter: None.
cc: U. S. Nuclear Regulatory Commission Region ll l Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. M. J. Morgan i NRC Senior Resident inspector.
North Anna Power Station
/@Y l 9910100088 DR 990930 ADOCK 05000338 PDR un
l
,* / j l
\
l I
4 l
i VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT SEPTEMBER 1999 i
i 1
i Approved: N /d Site Vice President D'afo '
e' t i
OPERATING DATA REPORT Docket No.: 50-338 Date: 10/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101
- 1. Unit Name:. ........ . . . . , . . . . . . . . . . North Anna Unit 1
- 2. Reporting Periodt __ _ _ _ . _ - - . . . September,1999 3.~ Licensed Thermal Power (MWt):- 2,893
- 4. ~ Nameplate Rating (Gross MWe): .. . .. ..... ... ... 979.74 I
- 5. Design Electrical Rating (Net MWe):. ..... . . ... .. 907
- 6. Maximum Dependable Capacity (Gross MWe): . 940
- 7. Maximum Dependable Capacity (Net MWe): 893
)
1
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, if Any (Net MWe): N/A I
- 10. Reasons For Restrictions,if Any: N/A This Month Year To-Date Cumulative
- 11. Hours in Reporting Period 720.0 6,551.0 186,491.0
- 12. Hours Reactor Was Critical 720.0 6,551.0 147,976.2
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 7,134.2
- 14. Hours Generator On-Line 720.0 6,551.0 144,810.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2,061,896.1 18,875,605.9 392,570,634.8
- 17. Gross Electrical Energy Generated (MWH) 699,369.0 6,360,567.0 166,118,437.0
- 18. - Net Electrical Energy Generated (MWH) 665,396.0 6,057,313.0 122,418,551.0
- 19. Unit Service Factor 100.0 % 100.0 % 77.7 %
l i
- 20. Unit Availability Factor 100.0 % 100.0 % 77.7 %
- 21. Unit Capacity Factor (Using MDC Net) 103.5 % 103.5 % 73.4 %
- 22. Unit Capacity Factor (Using DER Net) 101.9 % 101.9 % 72.4 %
- 23. Unit Forced Outage Rate 0.0% 0.0% 7.5% ,
1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
30 day refuelina outage scheduled in March 2000
- 25. If Shut Down at End of Report Period, Estimated Date of Start up:
- 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
y
. t l.
AvERAos DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit Name: North Anna Unit 1 !
Date: 10/05/99 d
Contact:
W. R. Matthews ;
Telephone: (540) 894 2101 l MONTH: . September,1995 Average Daily Power Level Average Daily Power Level Day (MWe Net) Day (MWe - Net) 1' 932 17 937 2 933 18 935 I 1
-3 933 19 934 :
-4 932 20 935 5 932 21 935 6 933 22 936 7 933 23 936 8 933 24 936 9 932 25 935 10 926 26 936 11 932 27 936 12 662 28 935 13 923 29 933 14 932 30 933 15 932 31 16 -934 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to l the nearest whole megawatt.'
l
i~
.. .t Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 10/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.:.1 MONTH: September 1999
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Usted below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
1 agte Illng Data September 1,1999 0000 Began the month in Mode 1,100% power,979 MWe.
September 10,1999 2200 Ramped down to 91.3% power,870 MWe for turbine valve freedom test.
September 11,1999 0355 Ramped unit back to 100% power,979 MWe following completion of turbine valve freedom test.
September 12,1999 0724 Commenced ramping unit to 59% power due to ioes of power to the generator output breaker G-12 cooling pumps.
September 13,1999 0320 Completed ramping unit to 100% power,979 MWe following repair to generator output breaker G-12 cooling pumps.
September 30,1999 - 2400 Ended the month in Mode 1,100% power,982 MWe.
l
Docket No.: 50-338 Unit Name: North Anna Unit 1 1 Date: 10/05/99 I
Contact:
l W. R. Matthews Telephone: (540) 894-2101 l i
UNIT SHUTDOWN AND POWER REDUCTION (EQUALTo oR GREATER THAN 20%)
REPORT MONTH: September,1999 (1) (2) (3) (4) (5)
Method Duration of LER No. System Component Cause & Corrective Action ,
Date Type Hours Reason Shutting Code Code to Prevent Recurrence i Down Reactor 9-12-99 F 19.9 A 4 NA NA NA NA On Se;%mber 12,1999, at 0225 hours0.0026 days <br />0.0625 hours <br />3.720238e-4 weeks <br />8.56125e-5 months <br />, Unit 1 was ramped down to 59% power due to loss of ; swer to the generator output Laaker G-12 cooling pumps. On September 13,1999, at 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br />, Unit 1 was rampea to 100% power, 979 MWe following repair to generator output breaker G-12 cooling purnps.
1 l
i (1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A- Equipment Failure (Explain) 1 - Manual
'B- Maintenance or Test 2- Manual Scram C- Refueling 3- Automatic Scmm D- Regulatory Restriction 4- Other (Explain)
E- Operator Training & Licensing Examination F- Administrative ,
G- Operational Error (Explain) '
(4) (5)
Exhibit G -Instructions for Prept stion of Data Entry Sheets . Exhibit 1 Same Source for Licensee Event Report (LER) File (NUREG 0161) e ,_
i--.
' .. i ; t.
OPERATING DATA REPORT.
Docket No.: 50-339 Date: 10/05/99 l
Contact:
- W. El. Matthews Telephone: (540) 894-2101
' 1.' Unit Name:.. ......... ... ... .. . North Anna Unit 2 '
2.' Reporting Perio+- _ . . . . _ .
September,1999 !
- 3. Licensed Thermal Power (MWt):.. . .. .. 4.... . 2,893 ,
- 4. Nameplate Rating (Gross MWe)
- ' ............ 979 !
- 5. Design Electrical Rating (Not t 4We);... ..... . 907 8
' 6. Maximum Dependable Capacity (Gross MWe): .. 944
- 7. . Maximum Depenc%ble Capacity (Net MWe): ... . . 897 j
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Peport, Give Reasons: -
N/A s
( ,
- 9. ' Power Level To Which Restricted, if Any (Net idWe): N/A
' 10. , Reasons For Restrictions, if Any: N/A ' l J
! Thlg Month Year-To-Date . Cumulative l' 11. Hours in Reporting Period J 720.0 - 6,551.0 164,759.0 l l 12. Hours Reactor Was Critical 266.6 6,097.6 139,895.8
- 13. Reactor Reserve Shutdown Hours 15.1
.f 15.1 7,256.6 '
L 14. Hours Generator On-Line 265.5 6,096.5 138,639.8 i' 15. Unit Reserve Shutdown Hours . 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) . 656,109.3 17,438,188.7 381,164,884.4 j
.17. . Gross Electrical Energy Generated (MWH) 218,242.0 5,758,293.0 124,715,209.0 l
- 18. Net Electrical Energy Generated (MWH) 206,110.0 5,476,604 0 119,090,677.0 L - 19. Unit Service Factor 36.9 % 93.1 % 84.2 %
j 20. Unit Availability Factor l 36.9 % 93.1 % 84.2 % -j i- 21. Unit Capacity Factor (Using MDC Net) 31.9 % 93.2 % 80.4 % )
l 22. . Unit Capacity Factor (Using DER Net) 31.6 % 92.2 % 79.7 % l h 23." ' Unit Forced Outage Rate 0.0% 0.0% 4.6%
24; Shutdowns Scheduled Over N xt 6 Months (Type, Date, and Duration of Each):
- 25. - h SNt Down at End of Report Period, Estimated Date of Otart-up: October 8,1999
. 26. Unit In Test Status (Prio'r to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1
1 J i E _ ._
F ,, ,
1
^
l l.
l- AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit Name: North Anru Unit 2 Date: 10/05/99
Contact:
W. R. Matthews l Telephone: (540) 894-2101-MONTH: September,1999 l
Average Daily Power Level Average Daily Power Level Day - (MWe - Net) Day (MWe Net) 1 808 17 000 2 802 18 000 3- 800 19 000 l
4 797 20 000 5 788 21 000 6 783 22 000 7 780 23 000 8 774 _
24 000 9 ,,
763 25 000 10 761 26 000 11 727 27 '
000 I
12 005 28 000 13- 000 29 000 14 000 M 000 15 000 31 000 16 000 l
I l
INSTRUCTIONS 1'
\~
On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
.t , t
'
- Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 10/05/99
Contact:
W. R. Mattnews !
Telephone: (540) 894-2101 i NORTH ANNA POWER STATION j l
UNIT NO.:,2 <
MONTH: September 1999
SUMMARY
OF OPERATING EXPERIENCE l Page 1 of 1 Usted below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents. j l
DBit IllD.t ERIE Septerrber 1,1999 0000 Began the month in End of Ufe Power Coastdown, Mode 1, 90.2% power,863 MWe.
September 11,1999 2100- Commenced ramp down for refueling outage. Unit at 83%
power,803 MWe. i September 12,1999 0132 Main generator output breaker opan for beginning of a scheduled refueling outage.
September 30,1999 2400 Ended the month in Mode 6.
i l
l l
1 o .2 l l
l l
I Docket No.: 50-339
- Unit Name: North Anna Unit 2 Date: 10/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To oR GREATER THAN 20%)
REPORT MONTH: September,1999 (1) (2) (3) (4)- (5)
Method Duration of LER No. System Component Cause & Corrective Action Date - Type Hours Reason Shutting Code Code to Prevent Recurrence t Down Rx 9-12-99 S 454.5 C 1 NA NA NA NA !
(1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A- Equipment Failure (Explain) 1 - Manual B '- Maintenance or Test 2- Manual Scram C- Refueling . 3- Automatic Scram D- Regulatory Restriction 4- Other (Explain)
E- Operator Training & Licensing Examinat on F- Administrative G- Operational Error (Explain)
'(4)- (5)