Monthly Operating Repts for Feb 1989 for Beaver Valley Power Station Units 1 & 2
ML20235Z628
Person / Time
Site: Beaver Valley
Issue date: 02/28/1989
From: Sieber J, Winger M
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8903160037
Download: ML20235Z628 (10)


Text

- - _ - _ _ , - - _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ . _ _ - _ _ _ _ _

  • , NARRATIVE SUPNARY OF MONIHLY OPERATING EXPERIENCE i.

UNIT I FEBRUARY 1989 1

February 1- 'Ihe Unit operated at 90% output in a load following mode.

thrmgh February 3 i l

February 4 At approximately 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />, the Unit's output was reduced to 50% to load follow.

February 5 'Ihe Unit operated' at approximately 50% output- to load follow.

February 6 At approximately 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />, the Unit's output was escalated to 90% output to load follow.

February 7 'Ihe Unit operated at 90% output to load follow, through ,

February 12 l February 13 At 2125 hours0.0246 days <br />0.59 hours <br />0.00351 weeks <br />8.085625e-4 months <br />, the Reactor tripped on Law Level in the 'C' Steam Generator after the 'C' Feedwater Flow Control Valve controller failed.

February 14 At 1006 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.82783e-4 months <br />, the Reactor was taken critical. At 1307 hours0.0151 days <br />0.363 hours <br />0.00216 weeks <br />4.973135e-4 months <br />, the Unit was synchronized and output was escalated to 90%.

February 15 'Ihe Unit operated at 90% output to load follow.

through February 17 February 18 At 0008 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, the Unit's output was reduced to 50% to load follow.  ;

February 19 'Ihe Unit operated at 50% output to load follow.

February 20 At 0330 hours0.00382 days <br />0.0917 hours <br />5.456349e-4 weeks <br />1.25565e-4 months <br />, the Unit's output was escalated to 90% to load follow.  !

February 21 'Ihe Unit operated at 90% output to load follow.

through February 24 February 25 At 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />, the Unit's output was reduced to 50% to load follow.

February 26 'Ihe Unit operated at 50% output to load follow.

[I2 M l 8903160037 890228 PDR ADOCK 05000334 .

~

//f R PDC U

, .. NARRATIVE SUlHARY OF PONIHLY OPERATING EXPERIENCE UNIT I (continued)

FEBRUARY 1989 i

February 27 At 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br />, the Unit's output.was escalated to 90% output !

to load follow.

February 28' 'Ihe Unit operated at 90% output to load follow.

i l

l 1

i

3 h .) 0 r 0 0 t of (

e 9 noe 9 9 3 S cA2 v e if v si nt st

- P r 1 i c m l m m 0V a 4 t n o l ra o o I at r) 5 BMM( c e r eeV r r - r e o1 G a e p6 e r f vl f f ph e1

.EEyE r o r el l t eS R 0 O8 I mN r t o

u c

d e

L oo r r d

e d

e i r N8A At 0 C e c wt t c c b P y t E r nR IN Dt E E9 I

9 F

nR o d u onn L oo d u

d u

i h r t eU K I E & t e cC e e x on vN I E L Ef EE(

CN L F E t

c n t r . n onw r

w

. r .

UU 0 I eA e t o w

e o t o t o w

D - 0 s v ul dhl ul ul 0 u e pl ewF pl pl 0 a r t o p t o t o C F uf prr uf uf o i oe o c d rt t d d s a t aa s a sa

' o r w ' o ' o t l t ed tl t l i i ne i i no nee no no U t UGF U t Ut S

N 0 9 Z U Z Z 3

T 8 Z R Z Z n 9 Ou Z T Z Z aP C

  • Z S Z Z r u

p 1

"$$A -gu Z N Z Z mc l Y Z I Z Z aS o E R R A r.icf U ev S i R R ,

E W

B E

! uja n e Z

Z H

C Z

Z Z

Z  :

l l a am t

ad U F d u u o F on nt ndh D N h a a u o t MMA CR N I e - - -

A M M1 23 459 0 e # 2 5 0 e t 0 M 0 s n t A 0 A A W T n e r /

N

- /

N

/

N O R e v op 9 8

D O c E I

I P i e 1 E L R U R M

S I

. t a o t

M "So".$

eO e " sg  :

)

n U 5 3 5 5 i

wO I:eux a l

p x

e.eg H A H H E

" ( t s

e e rT u

m * $x- . 0 7

0 O l

i o r

cO," sg 5 a 1 F e c

t n g r n a n

",a S F S S e nit mel at

pt el an ni nu u r ouif g eme s q a e e p 8

aEMR R O e 4 3 5 e - - -

t 0 1 1 2 RABCDEFG a 2 2 2 2 D 0 0 0 0 9

9 9 9 8 8 8 8 d

. e o 2 3 4 5 l

N 1 1 1 1 d u ed c e rh oc F S F S I

i

, .n, l'

.. AVERAGE DAILY UNIT 10WER IEVEL ,q L ,  !

Docket No. 50-334 Unit BVPS Unit 1 Date Mar. 8. 1989

.oxtpleted by M. A. Winaer Telephone (412)393-7621 MONIH February 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER IEVEL (MWe-Net) (MWe-Net) 1 729 17 733 2 738 18 375 3 738 19 346 4 391 20 650 5 346 21 725 6 646 22 729 7 742 23 733 8 733 24 725 9 746 25 392 10 733 26 350 11 733 27 642 12 738 28 733  !

13 651 29 N/A 14 213 30 N/A 15 729 31 N/A 16 738 l

INSTRUCI' IONS On this formt, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

1 i

OPERATING DATA REPORT l

DOCKET NO.: 50-334 l REPORT DATE: 03/08/89 COMPLETED BY: M.A.WINGER TELEPHONE; (412) 393-7621 OPERATING STATUS j

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes l
2. REPORTING PERIOD: FEBRUARY 1989  ;
3. LICENSED THERMAL POWER (MWt): 2660 ,
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 835 l
6. MAX. DEPENDABLE CAPACITY (Gross Mke): 860
7. MAX. DEPENDABLE CAPACITY (Net MWe): 610 =
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:

l

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 672.0 1416.0 112488.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 659.3 1375.3 67626.2
13. REACTOR RESERVE SHUTDOVN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 656.3 1367.0 66011.0
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 1379326.0 2771981.0 156118339.5
17. GROSS ELECT. ENERGY GEN. (MWH): 448630.0 901330.0 50094669.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 419430.0 840150.0 46748540.0
19. UNIT SERVICE FACTOR: (PERCENT) 97.7 96.5 61.0
20. UNIT AVAILABILITY FACTOR:(PERCENT) 97.7 96.5 61.0
21. UNIT CAPACITY FACTOR (MDC): PCT 77.1 73.3 54.5
22. UNIT CAPACITY FACTOR (DER): PCT 74.7 71.1 52.9
23. UNIT FORCED OUTAGE RATE: (PERCENT) 2.3 3.5 18.0 1
24. SMUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):

UNIr IS SCHEDULED FOR SEVENTH REFUELING OUTAGE BEGINNING SEPTEMBER 1.1989 TO NOVEMBER 10.1989

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED l INITIAL CRITICALITY N/A N/A l INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A I

i

~

, NARRATIVE SUP9%RY OF MNIHLY OPERATING EXPERIENCE UNIT II FEBRUARY 1989 February 1 The Unit operated at approximately 90% output in a core through coastdown mode.

February 11 February 12 At 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />, the Unit tripped on Hi-Hi Imvel in the 'C' Steam Generator after loss of control of the 'C' Main ,

Feedwater Flow Control Valve. I February 13 The Unit rennined shutdown for feedwater flow control valve through repairs.

February 16 February 17 At 1431 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.444955e-4 months <br />, the Reactor was taken critical. At 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />, the Reactor entered Mode 1.

February 18 At 0012 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, the Unit 'was synchronized and the Unit's I output was escalated to approximately 50% output.  !

February 19 The Unit operated at approx 12nately' 50% output in a core through coastdown mode. .

February 28  !

1 l

l l

?

I-

!j! i  ;' l l 1lii .

e l e 2 _1 i .r as e st nl 9 2 H e na ei e 2 8 6 - t oD cF r 9 r7 i ra i i r t 1 e - H ew t f L) u i n3 t d c o R n n , n9 nf e u rE e 2 U 8 W i3 oae r noL 1 o F o t of ( e 4 S h ) e t t r t si n

- P c . 2 v e uon nt st a 0 V a r 1 i c n pt i n I at r) c B A. 4 t n w t aa w 5

c e o urM o - r eo1 -

M M( C a ep6 e r d oe d ph e1 1

r or t n t OeIgN.tEyE r t u s a

7 0G' e 'C s a

t eS R0 i r G i r

o c Nm A Ae O C e o 9 . o bP y t E r nR h

IM Dl G nR c mf e c i i E

Eg Ie g o maov l oe h rt eU x onvN h

x K tf E . & i -

rtl a Ef EE( E CM tg rt t t c n t f S oV t UU D G y eA e u r u 5 e s v p tl p O

C u e t de 'C n p or o t u .

a r u .

og p' og C P n i n ct n n di rif o di h el t oC el t ce l ce n uu t es w uu o df i vso df M ee neol ee R r ULl F R r s u

o S i N v X

O l

i 9

8 X

X L

X E

V X

L nre aP C 9

  • *oou -

E L E r U 1 u$8ooa u U A U nc n I

B F V F aS o E Y r r R R ccf n --

A Si o R U E

W R

B 4

8ea 8

evyn i C

R H

C C

R  :

l l ad t t

aa m 't cr

.i O E d u u o ue P F onnt ndh D N h aauoet N I N

- t MMACRO e - - - - - -

A 0 e # 3 M1 23459 5 0 e t 0 M B s nt A 0 A W I ne r e v o

/

N 9

- /

N O R 8 B

O cE P _

S I F i e 2 U E L E n M R a S x l

.s fo E -

a l

e n 5o a " . *" u sg s" ) e )

N I

5 3 5 n s n -

  • oe" 2
i n .t w a e a -

l p

c l p

ni c*eej x oL x H A H E i E

" ( t s

t &

c g

( -

ee i r 9 rT r n o u t i r) m I.8on"  :

0 2 O l

i o r s ne r ni eivE c . " e s. 3 4 1

a R ai a F e rt l l c yTa a p _

t ngr r n x _

"ooy S F S na nort oE enit osi(

mel at i t

pt el anar

_ ninuuri r e

_ ouif gemeh s qa ee pd pt 1 2 8 aEMRR OAOO _

e 0 1 1 e - - - - - - - - _

RABCDEFGH t _

2 2 2 .

a 0 0 0

_ D 9 9 9 ._

8 8 8 _

d

. e o l N 4 5 6 d u ed .

c e _

rh _

oc _

FS _

FS _

il ,lI l  !!

1

,a : ,

I 4,.

t

, =, ->

V  ;

l[. ,,

, AVERAGE DAILY UNIT POWER I.EVEL Docket No. 50-412 Unit BVPS Unit 2

, Date Mar. 8. 1989 Cortpleted by M. A. Wirner Telephone (412) 393-7621 :

j MONIH February 1989 DAY AVERAGE DAILY POWER IDTL DAY NJERAGE DAILY FOWER IEVEL (MWe-Net) (MWe-Net) 1 732- 17 0 _

2 741' 18 200 3 745 19 399-4 744 20 432 5 741 21 436' 6 740 22 441 7 748 23 442 8 745 24 438 9 740 25 434 10 740 26 438 11 608 27 434 12 0 28 438 13 0 29 N/A i

14 0 30 N/A 15 0 31 N/A 16 0 I

INSTRUCTIONS On this format, list the average daily unit power level in M W-Net for each day in the reporting month. Compute to the nearest whole megawatt.

.~

e .

OPERATING DATA REPORT DOCKET NO : 50-412 REPORT DATE: 03/08/89 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 393-7621 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION UNIT 2 Notes
2. REPORTING PERIOD: FEBRUARY 1989
3. LICENSED THERMAL POWER (MWt): 2660
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 836
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 885
7. MAX. DEPENDABLE CAPACITY (Net MWe): 833
8. IF CRANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMUIATIVE
11. HOURS IN REPORTING PERIOD: 672.0 1416.0 11271.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 538.8 1282.8 10532.1
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR WAS ON LINE: 529.1 1273.1 10452.4
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 1018798.0 2881956.0 26612896.4
17. GROSS ELECT. ENERGY GEN. (MWH): 323300.0 918300.0 8548100.0 '
18. NET ELECTRICAL ENERGY GEN. (MWH): 298333.0 861549.0 8076714.0
19. UNIT SERVICE FACTOR: (PERCENT) 78.7 89.9 92.7
20. UNIT AVAILABILITY FACTOR:(PERCENT) 78.7 89.9 92.7
21. UNIT CAPACITY FACTOR (MDC): PCT 53.3 73.0 86.0
22. UNIT CAPACITY FACTOR (DER): PCT 53.1 72.8 85.7
23. UNIT FORCED OUTAGE RATE: (PERCENT) 21.3 10.1 4.3
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH): j

_ UNIT IS SCHEDULED FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO MAY 26.1989

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

.c-yyg I '

'Af Telephone (412) 393-6000 Nuclear Group P.O Box 4 Shippingport, PA 15077-0004 March 8, 1989 I

Beaver Valley Iber Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. HPF-73 Monthly operatirn Renort l

U. S. Nuclear Regulatory Commission tw, ment Control Desk Washington, D.C. 20555 Gentlemen:

In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for Unit 1 ard Unit 2 for the month of February, 1989.

Very truly yours,

.d

. D. Sieber AL Vice President Nuclear Group 1md Enclosures cc: NRC Regional Office King of Prussia, PA 9