NARRATIVE SUPNARY OF MONIHLY OPERATING EXPERIENCE i.

UNIT I FEBRUARY 1989 1

February 1-

'Ihe Unit operated at 90% output in a load following mode.

thrmgh February 3 i

l February 4 At approximately 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />, the Unit's output was reduced to 50% to load follow.

February 5

'Ihe Unit operated' at approximately 50% output-to load follow.

February 6 At approximately 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />, the Unit's output was escalated to 90% output to load follow.

February 7

'Ihe Unit operated at 90% output to load follow, through February 12 l

February 13 At 2125 hours0.0246 days <br />0.59 hours <br />0.00351 weeks <br />8.085625e-4 months <br />, the Reactor tripped on Law Level in the

'C' Steam Generator after the

'C' Feedwater Flow Control Valve controller failed.

February 14 At 1006 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.82783e-4 months <br />, the Reactor was taken critical. At 1307 hours0.0151 days <br />0.363 hours <br />0.00216 weeks <br />4.973135e-4 months <br />, the Unit was synchronized and output was escalated to 90%.

February 15

'Ihe Unit operated at 90% output to load follow.

through February 17 February 18 At 0008 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, the Unit's output was reduced to 50% to load follow.

February 19

'Ihe Unit operated at 50% output to load follow.

February 20 At 0330 hours0.00382 days <br />0.0917 hours <br />5.456349e-4 weeks <br />1.25565e-4 months <br />, the Unit's output was escalated to 90% to load follow.

February 21

'Ihe Unit operated at 90% output to load follow.

through February 24 February 25 At 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />, the Unit's output was reduced to 50% to load follow.

February 26

'Ihe Unit operated at 50% output to load follow.

[I2 M l

8903160037 890228

~

//f PDR ADOCK 05000334 R

PDC U

NARRATIVE SUlHARY OF PONIHLY OPERATING EXPERIENCE UNIT I (continued)

FEBRUARY 1989 i

February 27 At 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br />, the Unit's output.was escalated to 90% output to load follow.

February 28'

'Ihe Unit operated at 90% output to load follow.

i l

l 1

i

4 U r n oI 0

r 0

0 t

of (

3 h

.)

e 9

noe 9

9 si 3 S cA2 v

e if v nt st

- P r 1

i c

m l

m m

0V a 4

I at r) t n

o l ra o

o 5 BMM(

- r e o1 c

e r

eeV r

r G a e p6 ph e1 e

r f

vl f

f r o r el l t eS R 0

.EEyE 9

i r nR O8 r t u

d L oo d

d I mN o

c e

r r e

e i r N8 At 0 C

e c

wt t c

c A

b P y t E IN Dt E9 nR u

onn u

u h r t eU E

F o

d L oo d

d I

I x on vN K

E E

t e

cC e

e Ef EE(

I L

t t

r.

CN L

n r

r.

U U F E c n w

onw w

w 0 I eA e t o e o t o t o D -

0 0

s v

ul dhl ul ul u

e pl ewF pl pl 0

a r

t o p

t o t o C

F uf prr uf uf o

i oe o

c d

rt t d

d s a t aa s a sa o

r w o

' o t l t ed tl t l i

i ne i

i no nee no no U t UGF U t Ut S

N0 9

Z U

Z Z

3 8

Z R

Z Z

n T

9 Ou Z

T Z

Z aP C

-gu Z

N Z

Z mc 1

Z S

Z Z

r u

"$$A p

l Y

Z I

Z Z

aS o E

R r.

R A

icf S i U

uja n e v R

R t

E B

Z H

Z Z

l l ad W

E a m a

e Z

C Z

Z u o U

F d u F

on nt ndh D

N h a a u o MMA CR t

N I

e - - -

A M0 e

2 M1 23 459 5

0 e t 0

M 0

s n t

A 0

A A

W T

n e r

/

/

/

O R

e v o

N 9

N N

O c E p

8 DI i

e I

P U

E L

R 1

R M

S o

"So".$

t I

a t

eO "

)

sg M

e U

5 3

5 5

n i

wO I:eux a

lp x

e.eg H

A H

H E

(

t s

e e rT u

m * $x-7 l

r 0

0 O

i o cO," sg 5

a 1

F ec t n g r n a n

",a S

F S

S e nit mel at pt el an ni nu u r ouif g eme s q a e e p aEMR R O e

4 3

8 5

e - - -

0 1

1 2

RABCDEFG ta 2

2 2

2 D

0 0

0 0

9 9

9 9

8 8

8 8

d e

o l

2 3

4 5

N d u 1

1 1

1 ed c e rh oc F S F S I

i

.n, l'

AVERAGE DAILY UNIT 10WER IEVEL

,q L

Docket No. 50-334 Unit BVPS Unit 1 Date Mar. 8. 1989

.oxtpleted by M. A. Winaer Telephone (412)393-7621 MONIH February 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER IEVEL (MWe-Net)

(MWe-Net) 1 729 17 733 2

738 18 375 3

738 19 346 4

391 20 650 5

346 21 725 6

646 22 729 7

742 23 733 8

733 24 725 9

746 25 392 10 733 26 350 11 733 27 642 12 738 28 733 13 651 29 N/A 14 213 30 N/A 15 729 31 N/A 16 738 l

INSTRUCI' IONS On this formt, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

1 i

OPERATING DATA REPORT l

DOCKET NO.:

50-334 l

REPORT DATE:

03/08/89 COMPLETED BY: M.A.WINGER TELEPHONE; (412) 393-7621 OPERATING STATUS j

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes l
2. REPORTING PERIOD: FEBRUARY 1989
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835 l

6. MAX. DEPENDABLE CAPACITY (Gross Mke):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

610

=

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:

l

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

672.0 1416.0 112488.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

659.3 1375.3 67626.2

13. REACTOR RESERVE SHUTDOVN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

656.3 1367.0 66011.0

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1379326.0 2771981.0 156118339.5

17. GROSS ELECT. ENERGY GEN. (MWH):

448630.0 901330.0 50094669.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

419430.0 840150.0 46748540.0

19. UNIT SERVICE FACTOR: (PERCENT) 97.7 96.5 61.0
20. UNIT AVAILABILITY FACTOR:(PERCENT) 97.7 96.5 61.0
21. UNIT CAPACITY FACTOR (MDC): PCT 77.1 73.3 54.5
22. UNIT CAPACITY FACTOR (DER): PCT 74.7 71.1 52.9
23. UNIT FORCED OUTAGE RATE: (PERCENT) 2.3 3.5 18.0 1
24. SMUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):

UNIr IS SCHEDULED FOR SEVENTH REFUELING OUTAGE BEGINNING SEPTEMBER 1.1989 TO NOVEMBER 10.1989

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED l

INITIAL CRITICALITY N/A N/A l

INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A I

i

~

NARRATIVE SUP9%RY OF MNIHLY OPERATING EXPERIENCE UNIT II FEBRUARY 1989 February 1 The Unit operated at approximately 90% output in a core through coastdown mode.

February 11 February 12 At 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />, the Unit tripped on Hi-Hi Imvel in the

'C' Steam Generator after loss of control of the

'C' Main Feedwater Flow Control Valve.

I February 13 The Unit rennined shutdown for feedwater flow control valve through repairs.

February 16 February 17 At 1431 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.444955e-4 months <br />, the Reactor was taken critical. At 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />, the Reactor entered Mode 1.

February 18 At 0012 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, the Unit 'was synchronized and the Unit's I

output was escalated to approximately 50% output.

February 19 The Unit operated at approx 12nately' 50% output in a core through coastdown mode.

February 28 1

l l

l

?

I-

1lii

!j!

i l

l e

l e

_1

. r st nl as e 2

i 9

2 H

e na ei e

2 8

6 t

oD cF r

9 r7 i ra i

i r

1 e

H ew t f L) u t

n3 t d c o R

n i

n9 nf e n

u rE e

2 U 8 i3 oae r noL W

o F

o t

of (

e 1

4 S h

)

e t

t r t

si n

2 v

e uon P

c nt st a

1 i

c n

pt i n

A.

r 0

V I

at r) c 4

t n

w t aa w

5 B

a

- r eo1 M M(

c e

o urM o

C a ep6 1

e r

d oe d

ph e1 r or t

n t

r t u

s 7 e 'C

.tEyE t eS R0 r

OeIgN s

i r G

i o

c a

0G' a

Nm Ae O C

e o

9 o

bP y t E h

A G

i r nR IM Dl Eg nR c

mf e c

i E

Ie o

maov h rt eU h

x onvN x

K f g

t E.

i oe l

CM tg t t rtl a Ef EE(

E U U rt c n t

f S oV t

D G y eA e u

r u

5 e

tl p

s v

p d 'C n o O

e t

u e

t C

a r

u.

p or u.

C P

og p'

ct og n

i n n

n di rif o di h

el t

oC el t

ce l

ce n

uu t es w uu o

df i vso df M

ee neol ee R r ULl F R r suo S

i N

v O

X X

X e

l 9

X E

X nr i

8 C

9

  • *oou L

V L

aP E

L E

r U

1 u$8ooa u U

A U

nc n I

F V

F aS o B

Y E

r r

R R

ccf n A

Si o

evyn R

U E

R 4

t

.i C

H C

l l ad t W

B 8ea R

C R

aa m cr 8

O F

d u u o

't i

E ue P

onnt ndh h aauoet D

N t MMACRO N

I e - - - - - -

A N

0 e

3 M1 23459 0

5 0

e t M

B s nt A

0 A

W I

ne r

/

/

O R

e v o N

9 N

O cE P 8

B S

I F

i e

2 U

E L

E n

M R

a S

x

.s fo E

n 5o ". *" u sg l

a l

s"

)

e

)

e a

N 5

3 5

n s

n I

i n

.t w

  • oe" 2 a

e a

l c

l p

ni p

x oL x

c*eej H

A H

E i

E

(

t t &

(

s c

g r

ee i

rT r n o

m I.8on" 9

u t i r) l r

s ne r n 0

2 O

i o eivE i

c. " e s. 3 4

a R ai a

1 F e rt l l c

yTa a p t ngr r n x "ooy na nort oE S

F S

enit osi(

mel at i t pt el anar ninuuri r e ouif gemeh s qa ee pd pt 1

2 8

aEMRR OAOO e

e - - - - - - - -

0 1

1 2

2 2

RABCDEFGH t

a 0

0 0

D 9

9 9

8 8

8 de o

l N

4 5

6 d u ed c e rh oc FS FS il

,lI l

1

,a :

I t

, =,

4,.

l[.

V AVERAGE DAILY UNIT POWER I.EVEL Docket No. 50-412 Unit BVPS Unit 2 Date Mar. 8. 1989 Cortpleted by M. A. Wirner Telephone (412) 393-7621 :

j MONIH February 1989 DAY AVERAGE DAILY POWER IDTL DAY NJERAGE DAILY FOWER IEVEL (MWe-Net)

(MWe-Net) 1 732-17 0

2 741' 18 200 3

745 19 399-4 744 20 432 5

741 21 436' 6

740 22 441 7

748 23 442 8

745 24 438 9

740 25 434 10 740 26 438 11 608 27 434 12 0

28 438 13 0

29 N/A i

14 0

30 N/A 15 0

31 N/A 16 0

I INSTRUCTIONS On this format, list the average daily unit power level in M W-Net for each day in the reporting month. Compute to the nearest whole megawatt.

.~

e OPERATING DATA REPORT DOCKET NO :

50-412 REPORT DATE:

03/08/89 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 393-7621 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION UNIT 2 Notes
2. REPORTING PERIOD: FEBRUARY 1989
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

885

7. MAX. DEPENDABLE CAPACITY (Net MWe):

833

8. IF CRANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMUIATIVE

11. HOURS IN REPORTING PERIOD:

672.0 1416.0 11271.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

538.8 1282.8 10532.1

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR WAS ON LINE:

529.1 1273.1 10452.4

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1018798.0 2881956.0 26612896.4

17. GROSS ELECT. ENERGY GEN. (MWH):

323300.0 918300.0 8548100.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

298333.0 861549.0 8076714.0

19. UNIT SERVICE FACTOR: (PERCENT) 78.7 89.9 92.7
20. UNIT AVAILABILITY FACTOR:(PERCENT) 78.7 89.9 92.7
21. UNIT CAPACITY FACTOR (MDC): PCT 53.3 73.0 86.0
22. UNIT CAPACITY FACTOR (DER): PCT 53.1 72.8 85.7
23. UNIT FORCED OUTAGE RATE: (PERCENT) 21.3 10.1 4.3
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

j

_ UNIT IS SCHEDULED FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO MAY 26.1989

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

.c-I

' yyg

'Af Telephone (412) 393-6000 Nuclear Group P.O Box 4 Shippingport, PA 15077-0004 March 8, 1989 I

Beaver Valley Iber Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. HPF-73 Monthly operatirn Renort l

U. S. Nuclear Regulatory Commission tw, ment Control Desk Washington, D.C.

20555 Gentlemen:

In accordance with Appendix A,

Technical Specifications, the Monthly Operating Report is submitted for Unit 1 ard Unit 2 for the month of February, 1989.

Very truly yours,

.d AL

. D. Sieber Vice President Nuclear Group 1md Enclosures cc: NRC Regional Office King of Prussia, PA 9