Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
- - _ - _ _ , - - _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ . _ _ - _ _ _ _ _
- , NARRATIVE SUPNARY OF MONIHLY OPERATING EXPERIENCE i.
UNIT I FEBRUARY 1989 1
February 1- 'Ihe Unit operated at 90% output in a load following mode.
thrmgh February 3 i l
February 4 At approximately 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />, the Unit's output was reduced to 50% to load follow.
February 5 'Ihe Unit operated' at approximately 50% output- to load follow.
February 6 At approximately 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />, the Unit's output was escalated to 90% output to load follow.
February 7 'Ihe Unit operated at 90% output to load follow, through ,
February 12 l February 13 At 2125 hours0.0246 days <br />0.59 hours <br />0.00351 weeks <br />8.085625e-4 months <br />, the Reactor tripped on Law Level in the 'C' Steam Generator after the 'C' Feedwater Flow Control Valve controller failed.
February 14 At 1006 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.82783e-4 months <br />, the Reactor was taken critical. At 1307 hours0.0151 days <br />0.363 hours <br />0.00216 weeks <br />4.973135e-4 months <br />, the Unit was synchronized and output was escalated to 90%.
February 15 'Ihe Unit operated at 90% output to load follow.
through February 17 February 18 At 0008 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, the Unit's output was reduced to 50% to load follow. ;
February 19 'Ihe Unit operated at 50% output to load follow.
February 20 At 0330 hours0.00382 days <br />0.0917 hours <br />5.456349e-4 weeks <br />1.25565e-4 months <br />, the Unit's output was escalated to 90% to load follow. !
February 21 'Ihe Unit operated at 90% output to load follow.
through February 24 February 25 At 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />, the Unit's output was reduced to 50% to load follow.
February 26 'Ihe Unit operated at 50% output to load follow.
[I2 M l 8903160037 890228 PDR ADOCK 05000334 .
~
//f R PDC U
, .. NARRATIVE SUlHARY OF PONIHLY OPERATING EXPERIENCE UNIT I (continued)
FEBRUARY 1989 i
February 27 At 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br />, the Unit's output.was escalated to 90% output !
to load follow.
February 28' 'Ihe Unit operated at 90% output to load follow.
i l
l 1
i
3 h .) 0 r 0 0 t of (
e 9 noe 9 9 3 S cA2 v e if v si nt st
- P r 1 i c m l m m 0V a 4 t n o l ra o o I at r) 5 BMM( c e r eeV r r - r e o1 G a e p6 e r f vl f f ph e1
.EEyE r o r el l t eS R 0 O8 I mN r t o
u c
d e
L oo r r d
e d
e i r N8A At 0 C e c wt t c c b P y t E r nR IN Dt E E9 I
9 F
nR o d u onn L oo d u
d u
i h r t eU K I E & t e cC e e x on vN I E L Ef EE(
CN L F E t
c n t r . n onw r
w
. r .
UU 0 I eA e t o w
e o t o t o w
D - 0 s v ul dhl ul ul 0 u e pl ewF pl pl 0 a r t o p t o t o C F uf prr uf uf o i oe o c d rt t d d s a t aa s a sa
' o r w ' o ' o t l t ed tl t l i i ne i i no nee no no U t UGF U t Ut S
N 0 9 Z U Z Z 3
T 8 Z R Z Z n 9 Ou Z T Z Z aP C
p 1
"$$A -gu Z N Z Z mc l Y Z I Z Z aS o E R R A r.icf U ev S i R R ,
E W
B E
! uja n e Z
Z H
C Z
Z Z
Z :
l l a am t
ad U F d u u o F on nt ndh D N h a a u o t MMA CR N I e - - -
A M M1 23 459 0 e # 2 5 0 e t 0 M 0 s n t A 0 A A W T n e r /
N
- /
N
/
N O R e v op 9 8
D O c E I
I P i e 1 E L R U R M
S I
. t a o t
M "So".$
eO e " sg :
)
n U 5 3 5 5 i
wO I:eux a l
p x
e.eg H A H H E
" ( t s
e e rT u
m * $x- . 0 7
0 O l
i o r
cO," sg 5 a 1 F e c
t n g r n a n
",a S F S S e nit mel at
- pt el an ni nu u r ouif g eme s q a e e p 8
aEMR R O e 4 3 5 e - - -
t 0 1 1 2 RABCDEFG a 2 2 2 2 D 0 0 0 0 9
9 9 9 8 8 8 8 d
. e o 2 3 4 5 l
N 1 1 1 1 d u ed c e rh oc F S F S I
i
, .n, l'
.. AVERAGE DAILY UNIT 10WER IEVEL ,q L , !
Docket No. 50-334 Unit BVPS Unit 1 Date Mar. 8. 1989
.oxtpleted by M. A. Winaer Telephone (412)393-7621 MONIH February 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER IEVEL (MWe-Net) (MWe-Net) 1 729 17 733 2 738 18 375 3 738 19 346 4 391 20 650 5 346 21 725 6 646 22 729 7 742 23 733 8 733 24 725 9 746 25 392 10 733 26 350 11 733 27 642 12 738 28 733 !
13 651 29 N/A 14 213 30 N/A 15 729 31 N/A 16 738 l
INSTRUCI' IONS On this formt, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
1 i
OPERATING DATA REPORT l
DOCKET NO.: 50-334 l REPORT DATE: 03/08/89 COMPLETED BY: M.A.WINGER TELEPHONE; (412) 393-7621 OPERATING STATUS j
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes l
- 2. REPORTING PERIOD: FEBRUARY 1989 ;
- 3. LICENSED THERMAL POWER (MWt): 2660 ,
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 835 l
- 6. MAX. DEPENDABLE CAPACITY (Gross Mke): 860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 610 =
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
l
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 672.0 1416.0 112488.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 659.3 1375.3 67626.2
- 13. REACTOR RESERVE SHUTDOVN HOURS: 0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE: 656.3 1367.0 66011.0
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 1379326.0 2771981.0 156118339.5
- 17. GROSS ELECT. ENERGY GEN. (MWH): 448630.0 901330.0 50094669.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 419430.0 840150.0 46748540.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 97.7 96.5 61.0
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 97.7 96.5 61.0
- 21. UNIT CAPACITY FACTOR (MDC): PCT 77.1 73.3 54.5
- 22. UNIT CAPACITY FACTOR (DER): PCT 74.7 71.1 52.9
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 2.3 3.5 18.0 1
- 24. SMUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
UNIr IS SCHEDULED FOR SEVENTH REFUELING OUTAGE BEGINNING SEPTEMBER 1.1989 TO NOVEMBER 10.1989
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED l INITIAL CRITICALITY N/A N/A l INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A I
i
~
, NARRATIVE SUP9%RY OF MNIHLY OPERATING EXPERIENCE UNIT II FEBRUARY 1989 February 1 The Unit operated at approximately 90% output in a core through coastdown mode.
February 11 February 12 At 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />, the Unit tripped on Hi-Hi Imvel in the 'C' Steam Generator after loss of control of the 'C' Main ,
Feedwater Flow Control Valve. I February 13 The Unit rennined shutdown for feedwater flow control valve through repairs.
February 16 February 17 At 1431 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.444955e-4 months <br />, the Reactor was taken critical. At 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />, the Reactor entered Mode 1.
February 18 At 0012 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, the Unit 'was synchronized and the Unit's I output was escalated to approximately 50% output. !
February 19 The Unit operated at approx 12nately' 50% output in a core through coastdown mode. .
February 28 !
1 l
l l
?
I-
!j! i ;' l l 1lii .
e l e 2 _1 i .r as e st nl 9 2 H e na ei e 2 8 6 - t oD cF r 9 r7 i ra i i r t 1 e - H ew t f L) u i n3 t d c o R n n , n9 nf e u rE e 2 U 8 W i3 oae r noL 1 o F o t of ( e 4 S h ) e t t r t si n
- P c . 2 v e uon nt st a 0 V a r 1 i c n pt i n I at r) c B A. 4 t n w t aa w 5
c e o urM o - r eo1 -
M M( C a ep6 e r d oe d ph e1 1
r or t n t OeIgN.tEyE r t u s a
7 0G' e 'C s a
t eS R0 i r G i r
o c Nm A Ae O C e o 9 . o bP y t E r nR h
IM Dl G nR c mf e c i i E
Eg Ie g o maov l oe h rt eU x onvN h
x K tf E . & i -
rtl a Ef EE( E CM tg rt t t c n t f S oV t UU D G y eA e u r u 5 e s v p tl p O
C u e t de 'C n p or o t u .
a r u .
og p' og C P n i n ct n n di rif o di h el t oC el t ce l ce n uu t es w uu o df i vso df M ee neol ee R r ULl F R r s u
o S i N v X
O l
i 9
8 X
X L
X E
V X
L nre aP C 9
E L E r U 1 u$8ooa u U A U nc n I
B F V F aS o E Y r r R R ccf n --
A Si o R U E
W R
B 4
8ea 8
evyn i C
R H
C C
R :
l l ad t t
aa m 't cr
.i O E d u u o ue P F onnt ndh D N h aauoet N I N
- t MMACRO e - - - - - -
A 0 e # 3 M1 23459 5 0 e t 0 M B s nt A 0 A W I ne r e v o
/
N 9
- /
N O R 8 B
O cE P _
S I F i e 2 U E L E n M R a S x l
.s fo E -
a l
e n 5o a " . *" u sg s" ) e )
N I
5 3 5 n s n -
- i n .t w a e a -
l p
c l p
ni c*eej x oL x H A H E i E
" ( t s
t &
c g
( -
ee i r 9 rT r n o u t i r) m I.8on" :
0 2 O l
i o r s ne r ni eivE c . " e s. 3 4 1
a R ai a F e rt l l c yTa a p _
t ngr r n x _
"ooy S F S na nort oE enit osi(
mel at i t
- pt el anar
_ ninuuri r e
_ ouif gemeh s qa ee pd pt 1 2 8 aEMRR OAOO _
e 0 1 1 e - - - - - - - - _
RABCDEFGH t _
2 2 2 .
a 0 0 0
_ D 9 9 9 ._
8 8 8 _
d
. e o l N 4 5 6 d u ed .
c e _
rh _
oc _
FS _
FS _
il ,lI l !!
1
,a : ,
I 4,.
t
, =, ->
V ;
l[. ,,
, AVERAGE DAILY UNIT POWER I.EVEL Docket No. 50-412 Unit BVPS Unit 2
, Date Mar. 8. 1989 Cortpleted by M. A. Wirner Telephone (412) 393-7621 :
j MONIH February 1989 DAY AVERAGE DAILY POWER IDTL DAY NJERAGE DAILY FOWER IEVEL (MWe-Net) (MWe-Net) 1 732- 17 0 _
2 741' 18 200 3 745 19 399-4 744 20 432 5 741 21 436' 6 740 22 441 7 748 23 442 8 745 24 438 9 740 25 434 10 740 26 438 11 608 27 434 12 0 28 438 13 0 29 N/A i
14 0 30 N/A 15 0 31 N/A 16 0 I
INSTRUCTIONS On this format, list the average daily unit power level in M W-Net for each day in the reporting month. Compute to the nearest whole megawatt.
.~
e .
OPERATING DATA REPORT DOCKET NO : 50-412 REPORT DATE: 03/08/89 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 393-7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION UNIT 2 Notes
- 2. REPORTING PERIOD: FEBRUARY 1989
- 3. LICENSED THERMAL POWER (MWt): 2660
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 833
- 8. IF CRANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD: 672.0 1416.0 11271.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 538.8 1282.8 10532.1
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE: 529.1 1273.1 10452.4
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 1018798.0 2881956.0 26612896.4
- 17. GROSS ELECT. ENERGY GEN. (MWH): 323300.0 918300.0 8548100.0 '
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 298333.0 861549.0 8076714.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 78.7 89.9 92.7
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 78.7 89.9 92.7
- 21. UNIT CAPACITY FACTOR (MDC): PCT 53.3 73.0 86.0
- 22. UNIT CAPACITY FACTOR (DER): PCT 53.1 72.8 85.7
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 21.3 10.1 4.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH): j
_ UNIT IS SCHEDULED FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO MAY 26.1989
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
.c-yyg I '
'Af Telephone (412) 393-6000 Nuclear Group P.O Box 4 Shippingport, PA 15077-0004 March 8, 1989 I
Beaver Valley Iber Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. HPF-73 Monthly operatirn Renort l
U. S. Nuclear Regulatory Commission tw, ment Control Desk Washington, D.C. 20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for Unit 1 ard Unit 2 for the month of February, 1989.
Very truly yours,
.d
. D. Sieber AL Vice President Nuclear Group 1md Enclosures cc: NRC Regional Office King of Prussia, PA 9
L