NARRATIVE SUPNARY OF MONIHLY OPERATING EXPERIENCE i.
UNIT I FEBRUARY 1989 1
February 1-
'Ihe Unit operated at 90% output in a load following mode.
thrmgh February 3 i
l February 4 At approximately 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />, the Unit's output was reduced to 50% to load follow.
February 5
'Ihe Unit operated' at approximately 50% output-to load follow.
February 6 At approximately 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />, the Unit's output was escalated to 90% output to load follow.
February 7
'Ihe Unit operated at 90% output to load follow, through February 12 l
February 13 At 2125 hours0.0246 days <br />0.59 hours <br />0.00351 weeks <br />8.085625e-4 months <br />, the Reactor tripped on Law Level in the
'C' Steam Generator after the
'C' Feedwater Flow Control Valve controller failed.
February 14 At 1006 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.82783e-4 months <br />, the Reactor was taken critical. At 1307 hours0.0151 days <br />0.363 hours <br />0.00216 weeks <br />4.973135e-4 months <br />, the Unit was synchronized and output was escalated to 90%.
February 15
'Ihe Unit operated at 90% output to load follow.
through February 17 February 18 At 0008 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, the Unit's output was reduced to 50% to load follow.
February 19
'Ihe Unit operated at 50% output to load follow.
February 20 At 0330 hours0.00382 days <br />0.0917 hours <br />5.456349e-4 weeks <br />1.25565e-4 months <br />, the Unit's output was escalated to 90% to load follow.
February 21
'Ihe Unit operated at 90% output to load follow.
through February 24 February 25 At 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />, the Unit's output was reduced to 50% to load follow.
February 26
'Ihe Unit operated at 50% output to load follow.
[I2 M l
8903160037 890228
~
//f PDR ADOCK 05000334 R
PDC U
NARRATIVE SUlHARY OF PONIHLY OPERATING EXPERIENCE UNIT I (continued)
FEBRUARY 1989 i
February 27 At 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br />, the Unit's output.was escalated to 90% output to load follow.
February 28'
'Ihe Unit operated at 90% output to load follow.
i l
l 1
i
4 U r n oI 0
r 0
0 t
of (
3 h
.)
e 9
noe 9
9 si 3 S cA2 v
e if v nt st
- P r 1
i c
m l
m m
0V a 4
I at r) t n
o l ra o
o 5 BMM(
- r e o1 c
e r
eeV r
r G a e p6 ph e1 e
r f
vl f
f r o r el l t eS R 0
.EEyE 9
i r nR O8 r t u
d L oo d
d I mN o
c e
r r e
e i r N8 At 0 C
e c
wt t c
c A
b P y t E IN Dt E9 nR u
onn u
u h r t eU E
F o
d L oo d
d I
I x on vN K
E E
t e
cC e
e Ef EE(
I L
t t
r.
CN L
n r
r.
U U F E c n w
onw w
w 0 I eA e t o e o t o t o D -
0 0
s v
ul dhl ul ul u
e pl ewF pl pl 0
a r
t o p
t o t o C
F uf prr uf uf o
i oe o
c d
rt t d
d s a t aa s a sa o
r w o
' o t l t ed tl t l i
i ne i
i no nee no no U t UGF U t Ut S
N0 9
Z U
Z Z
3 8
Z R
Z Z
n T
9 Ou Z
T Z
Z aP C
-gu Z
N Z
Z mc 1
Z S
Z Z
r u
"$$A p
l Y
Z I
Z Z
aS o E
R r.
R A
icf S i U
uja n e v R
R t
E B
Z H
Z Z
l l ad W
E a m a
e Z
C Z
Z u o U
F d u F
on nt ndh D
N h a a u o MMA CR t
N I
e - - -
A M0 e
2 M1 23 459 5
0 e t 0
M 0
s n t
A 0
A A
W T
n e r
/
/
/
O R
e v o
N 9
N N
O c E p
8 DI i
e I
P U
E L
R 1
R M
S o
"So".$
t I
a t
eO "
)
sg M
e U
5 3
5 5
n i
wO I:eux a
lp x
e.eg H
A H
H E
(
t s
e e rT u
m * $x-7 l
r 0
0 O
i o cO," sg 5
a 1
F ec t n g r n a n
",a S
F S
S e nit mel at pt el an ni nu u r ouif g eme s q a e e p aEMR R O e
4 3
8 5
e - - -
0 1
1 2
RABCDEFG ta 2
2 2
2 D
0 0
0 0
9 9
9 9
8 8
8 8
d e
o l
2 3
4 5
N d u 1
1 1
1 ed c e rh oc F S F S I
i
.n, l'
AVERAGE DAILY UNIT 10WER IEVEL
,q L
Docket No. 50-334 Unit BVPS Unit 1 Date Mar. 8. 1989
.oxtpleted by M. A. Winaer Telephone (412)393-7621 MONIH February 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER IEVEL (MWe-Net)
(MWe-Net) 1 729 17 733 2
738 18 375 3
738 19 346 4
391 20 650 5
346 21 725 6
646 22 729 7
742 23 733 8
733 24 725 9
746 25 392 10 733 26 350 11 733 27 642 12 738 28 733 13 651 29 N/A 14 213 30 N/A 15 729 31 N/A 16 738 l
INSTRUCI' IONS On this formt, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
1 i
OPERATING DATA REPORT l
DOCKET NO.:
50-334 l
REPORT DATE:
03/08/89 COMPLETED BY: M.A.WINGER TELEPHONE; (412) 393-7621 OPERATING STATUS j
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes l
- 2. REPORTING PERIOD: FEBRUARY 1989
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835 l
- 6. MAX. DEPENDABLE CAPACITY (Gross Mke):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
610
=
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
l
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
672.0 1416.0 112488.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
659.3 1375.3 67626.2
- 13. REACTOR RESERVE SHUTDOVN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
656.3 1367.0 66011.0
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1379326.0 2771981.0 156118339.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
448630.0 901330.0 50094669.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
419430.0 840150.0 46748540.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 97.7 96.5 61.0
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 97.7 96.5 61.0
- 22. UNIT CAPACITY FACTOR (DER): PCT 74.7 71.1 52.9
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 2.3 3.5 18.0 1
- 24. SMUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
UNIr IS SCHEDULED FOR SEVENTH REFUELING OUTAGE BEGINNING SEPTEMBER 1.1989 TO NOVEMBER 10.1989
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED l
INITIAL CRITICALITY N/A N/A l
INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A I
i
~
NARRATIVE SUP9%RY OF MNIHLY OPERATING EXPERIENCE UNIT II FEBRUARY 1989 February 1 The Unit operated at approximately 90% output in a core through coastdown mode.
February 11 February 12 At 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />, the Unit tripped on Hi-Hi Imvel in the
'C' Steam Generator after loss of control of the
'C' Main Feedwater Flow Control Valve.
I February 13 The Unit rennined shutdown for feedwater flow control valve through repairs.
February 16 February 17 At 1431 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.444955e-4 months <br />, the Reactor was taken critical. At 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />, the Reactor entered Mode 1.
February 18 At 0012 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, the Unit 'was synchronized and the Unit's I
output was escalated to approximately 50% output.
February 19 The Unit operated at approx 12nately' 50% output in a core through coastdown mode.
February 28 1
l l
l
?
I-
1lii
!j!
i l
l e
l e
_1
. r st nl as e 2
i 9
2 H
e na ei e
2 8
6 t
oD cF r
9 r7 i ra i
i r
1 e
H ew t f L) u t
n3 t d c o R
n i
n9 nf e n
u rE e
2 U 8 i3 oae r noL W
o F
o t
of (
e 1
4 S h
)
e t
t r t
si n
2 v
e uon P
c nt st a
1 i
c n
pt i n
A.
r 0
V I
at r) c 4
t n
w t aa w
5 B
a
- r eo1 M M(
c e
o urM o
C a ep6 1
e r
d oe d
ph e1 r or t
n t
r t u
s 7 e 'C
.tEyE t eS R0 r
OeIgN s
i r G
i o
c a
0G' a
Nm Ae O C
e o
9 o
bP y t E h
A G
i r nR IM Dl Eg nR c
mf e c
i E
Ie o
maov h rt eU h
x onvN x
K f g
t E.
i oe l
CM tg t t rtl a Ef EE(
E U U rt c n t
f S oV t
D G y eA e u
r u
5 e
tl p
s v
p d 'C n o O
e t
u e
t C
a r
u.
p or u.
C P
og p'
ct og n
i n n
n di rif o di h
el t
oC el t
ce l
ce n
uu t es w uu o
df i vso df M
ee neol ee R r ULl F R r suo S
i N
v O
X X
X e
l 9
X E
X nr i
8 C
9
- *oou L
V L
aP E
L E
r U
1 u$8ooa u U
A U
nc n I
F V
F aS o B
Y E
r r
R R
ccf n A
Si o
evyn R
U E
R 4
t
.i C
H C
l l ad t W
B 8ea R
C R
aa m cr 8
O F
d u u o
't i
E ue P
onnt ndh h aauoet D
N t MMACRO N
I e - - - - - -
A N
0 e
3 M1 23459 0
5 0
e t M
B s nt A
0 A
W I
ne r
/
/
O R
e v o N
9 N
O cE P 8
B S
I F
i e
2 U
E L
E n
M R
a S
x
.s fo E
n 5o ". *" u sg l
a l
s"
)
e
)
e a
N 5
3 5
n s
n I
i n
.t w
- oe" 2 a
e a
l c
l p
ni p
x oL x
c*eej H
A H
E i
E
(
t t &
(
s c
g r
ee i
rT r n o
m I.8on" 9
u t i r) l r
s ne r n 0
2 O
i o eivE i
c. " e s. 3 4
a R ai a
1 F e rt l l c
yTa a p t ngr r n x "ooy na nort oE S
F S
enit osi(
mel at i t pt el anar ninuuri r e ouif gemeh s qa ee pd pt 1
2 8
aEMRR OAOO e
e - - - - - - - -
0 1
1 2
2 2
RABCDEFGH t
a 0
0 0
D 9
9 9
8 8
8 de o
l N
4 5
6 d u ed c e rh oc FS FS il
,lI l
1
,a :
I t
, =,
4,.
l[.
V AVERAGE DAILY UNIT POWER I.EVEL Docket No. 50-412 Unit BVPS Unit 2 Date Mar. 8. 1989 Cortpleted by M. A. Wirner Telephone (412) 393-7621 :
j MONIH February 1989 DAY AVERAGE DAILY POWER IDTL DAY NJERAGE DAILY FOWER IEVEL (MWe-Net)
(MWe-Net) 1 732-17 0
2 741' 18 200 3
745 19 399-4 744 20 432 5
741 21 436' 6
740 22 441 7
748 23 442 8
745 24 438 9
740 25 434 10 740 26 438 11 608 27 434 12 0
28 438 13 0
29 N/A i
14 0
30 N/A 15 0
31 N/A 16 0
I INSTRUCTIONS On this format, list the average daily unit power level in M W-Net for each day in the reporting month. Compute to the nearest whole megawatt.
.~
e OPERATING DATA REPORT DOCKET NO :
50-412 REPORT DATE:
03/08/89 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393-7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION UNIT 2 Notes
- 2. REPORTING PERIOD: FEBRUARY 1989
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
833
- 8. IF CRANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
672.0 1416.0 11271.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
538.8 1282.8 10532.1
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
529.1 1273.1 10452.4
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1018798.0 2881956.0 26612896.4
- 17. GROSS ELECT. ENERGY GEN. (MWH):
323300.0 918300.0 8548100.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
298333.0 861549.0 8076714.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 78.7 89.9 92.7
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 78.7 89.9 92.7
- 22. UNIT CAPACITY FACTOR (DER): PCT 53.1 72.8 85.7
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 21.3 10.1 4.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
j
_ UNIT IS SCHEDULED FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO MAY 26.1989
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
.c-I
' yyg
'Af Telephone (412) 393-6000 Nuclear Group P.O Box 4 Shippingport, PA 15077-0004 March 8, 1989 I
Beaver Valley Iber Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. HPF-73 Monthly operatirn Renort l
U. S. Nuclear Regulatory Commission tw, ment Control Desk Washington, D.C.
20555 Gentlemen:
In accordance with Appendix A,
Technical Specifications, the Monthly Operating Report is submitted for Unit 1 ard Unit 2 for the month of February, 1989.
Very truly yours,
.d AL
. D. Sieber Vice President Nuclear Group 1md Enclosures cc: NRC Regional Office King of Prussia, PA 9
L