Application for Amend to License DPR-54,consisting of Suppl 2 to Rev 2 to Proposed Amend 138,changing Tech Spec Figures 6.2-1 & 6.2-2 to Assign Nuclear Security Manager & Staff Directly to Nuclear Power Production
ML20236V582
Person / Time
Site: Rancho Seco
Issue date: 11/25/1987
From: Firlit J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Miraglia F
Office of Nuclear Reactor Regulation
Shared Package
ML20236V584 List:
References
AGM-NPP-87-408, TAC-60162, TAC-63083, NUDOCS 8712040384
Download: ML20236V582 (3)


Text

. ,

O g'"SMUD

= SACRAMENTO MUNICIPAL UTILITY DISTRICT D P. O. Box 15830, Sacramento CA 95852-1830 (916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA I

NOV 2 51971 AGM/NPP 87-408 U. S. Nuclear Regulatory Commission Attn: Frank J. Miraglia, Jr.  ;

Associate Director for Projects Philips Bldg.

7920 Norfolk Averme Bethesda, MD 20014 DOCKET 50-312 RANCHO SECO NUCLEAR GENERATING STATION I LICENSE NO. OPR-54 PROPOSED AMENDMENT 138, REVISION 2, SUPPLEMENT 2 l

Dear Mr. Miraglia:

This second supplement to Proposed Amendment No.138, Revision 2 further enhances the Rancho Seco organization by assigning a Manager, Nuclear Security and his staff directly to the AGM, Nuclear Power Production. Previous to this Supplement 2, Nuclear Security was matrixed to the AGM, Nuclear Power i Production from the headquarters organization.

This supplement affects the following three pages of Proposed Amendment No.

138, Revision 2, submitted September 16, 1987:

1, Attachment I, paga 1, reply to NRC's request (1.b.) for additional information.

2. Technical Specification Figure 6.2-1, page 6-2a, SMUD CORPORATE SUPPORT OF NUCLEAR SAFETY TO RANCHO SECO.

l l 3. Technical Specification Figure 6.2-2, page 6-2b, Nuclear Organization l

Chart.

l The revised pages are enclosed with this letter. The Safety Analysis and No Significant Hazards Consideration in the District's September 16, 1987 submittal of Propos:ed Amendment No.138, Revision 2, are not changed or affected by this supplement.

B7120403B4 B71125 PDR ADOCK 05000312 lf)\

I l PDR k p

RANCHO SECO NUCLEAR GENERATING STATION O 14440 Twin Ci ies Road, Herald, CA 95638-9799;(209) 333 2935

.-AGM/NPF87-408-Frank J. Miraglia, Jr. - NOV 2.51987 Please contact me if you have any questions. Members of your staff with .,

questions requiring additional *nfomation.or. clarification may contact Mr. Vern Grayhek at (209) 333-2935, extension 4916..

Si erely

[ sep_0h. f, h Firlit Assistant General Manager, Nuclear Power Production ,e.

s ku -

s Sworn to and subscribed before me this g25 day of November 1987. $.<..

~

s b (.l e yotary Public gp u acu,LstAL- ~l Attachments th g

)

k.yf,g%

y "d"* w.j,,,yjgt t,ug_

cc: G. Kalman, NRC, Bethesda 6T'p .

memo ccumv

""*"* "" f.-

A. D'Angelo, NRC, Rancho Seco . '

J. B. Martin, NRC, Walnut Creek i

i 1

l

-l 1

'i

,.s l

.)

ATTACHMENT It SUBMITTAL OF REQUIRED INFORMATION PAGE 1 0F 2 Following are the District's replies.t'o NRC's' request of January 15, 1987, for additional information concerning Section'6, Administrative Controls, of the Rancho Seco Technical Specifications. For the convenience of the reviewers, the NRC inquiry is presented before'each District. reply:
1. Fiaure 6.2-1
a. Hith respect to each of the functional units under the Chief Executive Officer, Nuclear, provide a description of their function and responsibilities.

Reply The position descriptions of each manager of the . functional units under the Chief-Executive Officer, Nuclear, were submitted to the NRC on February 11, 1987, as Attachment C. These position descriptions include details of unit function and responsibility,

b. Is the responsibility for the Rancho Seco Security Program under the block " Security" that reports to the AGM, Administration and Services?

If not, who has responsibility for that function?

Bfply The responsibility for the Rancho Seco Security Plan is under the Manager, Nuclear Security, reportable to the AGM, Nuclear Power /

Production, (see Figure 6.2-2 in Attachment III).

c. You state that the AGM, Engineering is not responsible for Nuclear )

Engineering. Does the AGM, Engineering have any responsibility.for 'j engineering associated with Rancho Seco Nuclear Generating Station, Unit No. l?

Reply Engineering associated with Rancho Seco is provided by the Nuclear Engineering Department and by system engineers in the Plant Performance  ;

Department (see Figure 6.2-2 in Attachment III). Both of these departments are located on site. The AGM, Engineering and Production '

l in the District headquarters office has no responsibility for Rancho Seco engineering.