Amend 95 to License DPR-54,revising Tech Specs to Reflect Hardware Mods Associated W/Reactor Bldg Combustible Gas Control.Hydrogen Purge Sys Replaced W/Incontainment Hydrogen Recombiner Sys
ML20149L691
Person / Time
Site: Rancho Seco
Issue date: 02/12/1988
From: Knighton G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20149L688 List:
References
NUDOCS 8802240387
Download: ML20149L691 (9)


Text

.

'q,,

UNITED STATES NUCLEAR REGULATORY COMMISSION n

a$

WA SHING TON, D. C. 20555

\\...../

1 SACRAMENT 0 MUNICIPAL UTILITY DISTRICT i

DOCKET NO. 50-312 RANCHO SECO NUCLEAR GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 95 License No. DPR-54 1.

The Nuclear Regulatory Comission (the Comission) has found that:

1 A.

The application for amendment by Sacramento Municipal Utility District (the licensee) dated May 14, 1987, as supplemented i

September 25 and October 29, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and tne Comission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and i

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

1 8802240307 800212 PDR ADOCK 05000312 P

PDR

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-54 is hereby

~

amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 95, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

The changes in Technical Specifications are to become effective within 30 days of issuance of the amendment.

In the period between issuance of the j

amendment and the effective date of the new Technical Specifications, the licensee shall adhere to the Technical Specifications existing at the l

time.

The period of time during change over shall be minimized.

4.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION yn Georges. Knighton,ed'irector Project Directorate V Division of Reactor Projects - III, IV, V and Special Projects i

Attachment

  • Changes to the Technical l

Specifications i

Date of Issuance: February 12, 1988 l

February 12, 1988 ATTACHMENT TO LICENSE AMENOMENT NO. 95 FACILITY OPERATING LICENSE NO. OPR-54 DOCKET NO. 50-312 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by Artendment number and contain vertical lines indicating the area of change.

Remove Insert iv iv v

v vii vii

]

3-96 4-25 4-25 4-95 l

i 4

--_,e3 r-e

--,,r

,y

,y,

,c

+-----r---m----~

cn

\\

~

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS TA8LE OF CONTENTS (Continued)

Section

,P,a ge, 3.14.5 Fire Hose Stations 3-56a 3.14.6 Fire Rated Assemblies 3-S8 3.15 RADI0 ACTIVE LIQUID EFFLUENT INSTRUMENTATION 3-60 3.16 RADI0 ACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 3-63 3.17 LIQUID EFFLUENTS 3-70 3.17.1 Concentration 3 70 3.17.2 Dose 3-71 3.17.3 Liquid Holdup Tanks 3-72 3.18 GASEOUS EFFLUENTS 3-73 3.18.1 Dose Rate 3-73 3.18.2 Noble Gases 3-74 3.18.3 Iodine-131, Trititsu and Radionuclides in Particulate Fona 3-75 3.19 GASEOUS RA0 WASTE TREATMENT 3-78 3.20 GAS STORAGE TANXS 3-79 3.21 SOLIO RADI0 ACTIVE WASTES 3-80 3.22 RADIOLOGICAL ENVIRONMENTAL MONITORING 3 81 3.23 LAND USE CENSUS 3-87 3.24 EXPLOS!VE GAS HIXTURE 3-89 3.25 FUEL CYCLE DOSE 3-90 3.26 INTERLABORATORY C0ttPARISON PROGRAH 3-92 3.27 NUCLEAR SERVICE ELECTRICAL BUILDING ENERGENCY HEATING 3-93 AND AIR CONDITIONING 3.28.

TDI DIESEL GENERATOR CONTROL ROOH ESSENTIAL 3-93a VENTILATION SYSTEM 3.29 HETEOR0 LOGICAL 00NITORING INSTRUMENTATION 3-94 3.30 HYDROGEN RECOMBINERS 3-96 memn, No. u. u. u. u.u.n.es y

  • W

-->-,-,,,.~yn 7-

RANCHO SECO UNIT 1 TECHNICAL SPECIFlCAT10NS TABLE OF CONTENTS (Continued)

Section

'Page 4

SUR\\EILLANCE STANDARDS 4-1 4.1 OPERATIONAL SAFETY REVIEW 4-1 4.2 SURVEILLANCE OF ASME CODE CLASS 1, 2, AND 3 SYSTEMS 4-10 4.2.1 Reactor Yessel Surveillance Specimens 4-10 4.2.2 Inservice Inspection 4-11 4.3

,TFSTING FOLL0 DING OPENING OF SYSTEM 4-14 E

4.4 REACTOR BUILCING 4-15 4.4.1 todtainment Leakage Tests 4-15 4.4.2 Structural Inturity 4-21 4.4.3 This Specification has been deleted 4-25 4.5 EMERGENCY CORE COOLING AND REACTOR BUILDING 4-26 COOLING SYSTEM PERIODIC TESTING 4.5.1 Emergency Core Q oling System 4-26 4.5.2 Reactor Building Cooling Systems 4-29 4.5.3 Decay Heat Removal System and Reactor Building Spray dystem Leakage 4-32 4.6 EMERGENCY POWER SYSTEM PERIODIC TESTING 4-34 4.7 REACTOR CONTROL R00 SYS1EM TESTS 4-36 l

4.7.1 Control Rod Drive System Functional Tests 4-36 4.7.2 Control Rod Program Verification (Group vs. Core Positions) 4-37 4.8 AUXILIARY FEEDWATER PUMP PERIODIC TESTING 4-39 4.9 REACTIVITY ANOMALIES 4-40 4.10 ENERGENCY CONTROL RCOM FILTERING SYSTEM 4-41 4.11 REACTOR BUILDING PURGE EXHAUST FILTERING SYSTEM 4-42 4.12 AUXILIARY AND SPENT FUEL BUILDING FILTER SYSTEMS 4-43 4.13 AUGMENTED INSERVICE INSPECTION PROGRAM FOR HIGH 4-44 ENERGYLINESOUTSIDEOFC0]HAIkMENT Amendment No. 28,53,57,76s5 y

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS TABLE OF CONTENTS (Continued)

Section Page 4.26 RADIOLOGICAL ENVIRONMENTAL P;0,NITORING 4-83 4.27 LAND USE CENSUS 4-86 4.28 EXPLOSIV,E GAS MIXTURE 4-87 4.29

_ FUEL CYCLE DOSE 4-89 4.30 INTERLABORATORY COMPARIS0N PROGRAM SURVEILLANCE REQUIREMENT 4-90 4.31 NUCLEAR SERVICE ELECTRICAL BUILDING EMERGENCY HEATING 4-91 VENTILATION AND AiY CONDITIONING 4.32 TDI DIESEL GENERATOR CONTROL ROOM ESSENTIAL 4-92 YENTILATION SYSTEM 4.34 METER 0 LOGICAL MONITORING INSTRUMENTATION 4-93 4.35 HYDROGEN RECOMBINERS 4-95 l

5 DESIGN FEATURES 5-1 5.1 SITE 5-1 5.2 CONTAlhMENT 5-2 5.2.1 Reactor Building 5-2 5.2.2 Reactor Building Isolation System 5-3 5.3 REACTOR 5-4 5.3.1 Reactor Core 5-4 5.3.2 Reacter Coolant System 5-4 5.4 NEW AND SPENT FUEL STORAG) FACILITIES 5-6 5.4.1 New Fuel Inspection and Terrporary Storage Rack 5-6 5.4.2 New and Sp,ent Fuel Storage Racks and Failed 5-6 hej 5torage Container Rack 5.4.3 New and Spent Fuel Temporary Storage 5-6 5.4.4 Spent Fuel Pool and Storage Rack Design 5-6 Anendment No. )6, ps, f4I, f,6. 94,95 vii

5 RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS x.

Limiting Conditions for Operation 3.30 HYOROGEN RECOM8INE8t3-Tw, independent cont.ainment HydNgen Recombiner Systems shall be operable.

Applicabi!il/f Applies to t.he recedirer systems when the reactor is subcritical by less than 1 percent ak/k.',

Action '

3.30.1 ',

With one Hydro en Recombiner System inoperable, restore the

^'

inoperable syQem to OPERA 3LE status within 30 days or be in at s.least hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

..,f Bases s

The purpose of tile 6drogcCRecombiners is to provide a means of hydroger, control during oost-).0CA c41ditions. 'Ef ther recombiner unit is capable of controll,(Gg theNexpeqted hydrogen gereration associated with 1) zirconium-water reaction, 2) radiolytic decomposition of water, and 3) corrosion of metals within c.intainment.

,4 j

C

/

44 5

,c 9

I

\\

r #[%,

l I d"

.q, 4

4 4

Y d

a p

\\.,

s

+..

1 7-Amei dme t-No.45 3-96 y

s_

t

  • [1.

I 8

-g M

s

+

a 3

4.

O f

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Surveillance Standards

-4.4.3 Thf s specification is deleted in its entirety-1 l

l l

L l

l 1

1 s

)

Amendment No, 95 4-25

e RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS i

Surveillanca Standards i

4.35 HYDROGEN REC 0f1BINERS Aeplicability Applies to testing of each Hydrogen Reccabiner System Objective To verify that the Hydrogen Recombiner Systems are OPERABLE.

Specification 4.35.1 Each Hydrogen Recombiner System shall be demonstrated OPERABLE:

4.35.2 At least once per 6 months by verifying during a recombiner system functional test that the minimum hgater sheath temperature increases to greater than or equal to 700 F within 90 minutes.

Upon reaching 700*F, increase the power setting to maximum power for 2 minutes and verify that the power meter reads greater th'an or equal to 60KW.

4.35.3 At least once per refueling interval by:

4.35.4 Performing a CHANNEL CALIBRATION of all recombiner t

instrumentation and functional tests of all control circuits, 4.35.5 Verifying through a visual examination that there is no evidence of abnorum1 conditions within the recombiner enclosure, and 4.35.6 Verifying the integrity of the heater electrical circuits by performing a resistance to ground test following the above required functional test. The resistance to ground for the heater unit shall be greater than or equal to 10,000 ohms.

Bases The OPERABILITY of the equipment and systems required for control of hydrogen gas ensures that this equipment will be available to maintain the i

hydrogen concentration within containment below its flammable Ifmit during post-LOCA conditions.