PNO-III-80-45:on 800308,during Hydrostatic Test of Primary Sys,Leakage Discovered from 10 Inch Core Spray Piping Inside Drywell.Leakage Appears to Be from Heat Affected Zone Where Two 45 Degree Elbows Welded.Ultrasonic Testing Planned
ML20244A975
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 03/10/1980
From: Chrissotimos N, Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-80-045, PNO-III-80-45, NUDOCS 8004240266
Download: ML20244A975 (2)


Text

,

]

i PRELIMINARY. NOTIFICATION , l Date: March 10, 1980

. j PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURR 1

This saf ety Preliminary or,public notification constitutes EARLY notice of events of POSSTHlE interest significance. .

The information presented is as I

that is known by IE sta ff as of this date. evaluation and is basically all initially received without verification or e .

Facility: Commonwealth Edison Coaipany .

Quad Citie.a Nuclear Power Station, Unit 2 "

i Docket Number: 50-265 Cordova, T I.

m" m IU Subj ect:

CRACK IN CORE SPRAY PTPTNG hb1-a m x ,d,q

" * ' ' ' ' inc.ide the drywn11 van detcetod while performing a hydrostati primary system on March 8, 1980. fr]

.w p =, _

The leakaan appearn to he in the heat affected zone where two 45 %1bevs are d,C unidnd together outside rhn biological shield upstream of the uaftCeu<lo The #

inakaga appaarx to he from three to four pin holes and is estimatesi tFbe loss than 0.5 gallons per hour. The leakage is in an unisolatable section of line approximately four feet f rom the reactor vessel, and the pin hulus are approximate' 74 feet obove the top of: the rnactor core. See the attache.d sketch showing the piping configuration. .

The licensee pluns to ultrasculcally examine both loops of all of the core spresy piping in the c*rywell for other indications beginning Tuesday, March 11, 1980.

Unit 2 is in a refueling outage. and IL 1s not yet known how long this will

" extend the outogc.

Neither the licensee nur Region III are planning a news release at this time.

The State of Iowa is being notified.

The Resident Inspector was notified of this e.ve.nt at 4:30p.m. on March 8,1980.

This Int ~ormat ' is current au of 9:30s.m. on March 10, 1980. ' ,

Contact:

g ' 3. Chriusotimos. Resident Inspector, 309/654-2227; W. A ' ' Y . Ittle, 384-2552.

Distribution:RIII, Transmitted H St Chairman Ahearne Commissioner Hendrie S. J. Chilk, SECY Comissionce Cilinsky Com:nissipner Bradford Commissioner Kennedy C. C. Kacs=rer, CA ACRS .

,_ -- (For Distribution)

Transmitted: MNBB P. Bldg _

WJ J. Dircks, EDO

H. R. Denton, NRR IE:XOOSi '

(IE: EQ I C. Michcison, AEOD R. C. DeYoung, NRR '

J. J. Fouchard, PA R. J. Mattson, NRR Landow N. M. Haller, MPA (6 min / par D. Vassallo, NRR J. J. Cummings, 01A R. G. Ryan, OSP D. Eisenhut, NRR H. K. Shapar, ELD SS Bldg (MAIL)

J. G. Davis, NMSS R. Minogue, SD S. Levine, RES gooy140 2M y. IE:XOOS l PRELiffTNARY NOTIFICATION

- __