ML20212D312

From kanterella
Revision as of 12:30, 21 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jul 1983
ML20212D312
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/31/1983
From: Graham D
FLORIDA POWER CORP.
To:
Shared Package
ML20212D280 List:
References
NUDOCS 8608120471
Download: ML20212D312 (1)


Text

_. _ _ _ - _ _ _ _ -_ _ _ _ ___ - __ _ ___ . _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ __ -______

ATTACHMENT 3 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE 7/31/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH 7/83 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

I O 0 17 2 0 18 0 3 0 0 39 4 0 0 20 5 0 0 )

21

'6 .0 22 0 7 0 0 -

23 8 0 0 24 0 0 9 25 10 0 0 26 II 27 12 0

28 I3 29 k 191) j 14 0 30 0

15 3i 16 0 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

O (9/77) h D h R

-.. .-