Florida Power CORPORATION l UIN August 12, 1996 3F0896-01 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit-3 July 1996 Monthly Operating Report. This report is submitted in accordance with Technical Specification 5.7.1.2.

Sincerely, G. L. ldt Vice President Nuclear Operations GLB/ff Attachment k)i xc: NRR Project Manager Regional Administrator, Region II Senior Resident Inspector 4[

p 9608200239 960731 PDR R

ADOCK 05000302 PDR CRYSTAL RfVER ENERGY COMPLEX: 15760 W Power Urse St . Crystal FWor, Floride 3442H708 . (35a 79p486 A Tkwsda Progress Corryxmy I

. OPERATING DATA REPORT DOCKET NO. 50-302 UNIT FLCRP-3 DATE AUGUST 2,1996 COMPLETED BY T V Dao @

TELEPHONE (352) 795-6486 OPERATING STATUS

1. UNIT NAME:. . . CRYSTAL RIVER UNIT 3
2. REPORTING PERIOD:. . . . . . . . . . . . . JULY
3. LICENSED THERMAL POWER (MWt):. . . . .. ~2544
4. NAMEPLATE RATING (GROSS MWe):. . .. 890
5. DESIGN ELECTRICAL RATING (NET MWe):. . 825
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) . 860-
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):. 818
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

l

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): N/A
10. REASONS FOR RESTRICTIONS,IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744.0 5,111.0- 169,943.0 . j
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 - 2,498.1 116,606.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 ' O.0 ' 1,280.6 l
14. HRS GENERATOR ON LINE 744.0 2,320.5 114,539.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 00
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,886,156 5,583,953 266,966,111
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 654.298 1.904,229 91,250.422
18. NET ELECTRICAL ENERGY GENERATED (MWH) 621,294 1,807,574 86,792.587
19. UNIT SERVICE FACTOR 100.0 % 45.4 % ,

67.4 %

20. UNIT AVAILABLE FACTOR 100.0 % 45.4 % 67.4 %
21. UNIT CAPACITY FACTOR (using MDC net) 102.1 % 43.2% 63.2%
22. UNIT CAPACITY FACTOR (using DER net) 101.2 % ' 42.9% 61.9 %
23. UNIT FORCED OUTAGE RATE 0.0% 20.1 % 15.4 %
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP;
26. UNITS IN TEST STATUS (PRIOR TO CCMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA

l

- \

, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE AUGUST 2,1996 COMPLETED BY T V Dao TELEPHONE (352)795-6486 l

MONTH JULY l

l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MWe-Net) (MWo-Net) 1 846 17 842-2 845 18 844  !

3 845 19 843 4 845' 20 749 .

5 845 21 843 6 847- 22 842-7 848 23 839-8 848 24 843' 9 847 25 844 10 848- 26 843 11 845 27 843 12 844 28 843 13 843 29 843 14 841 30 843 i 15 840 31 842 16 840 INSTRUCTIONS:

On this format, list the daily average unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS -

DocxET No. So-soa UNIT FLCRP-3 REPORT MONTH JULY DATE AUGUST 2.1996 ,

COMPLETED BY T V Dao TELEPHONE (352) 795-6486 e

NO. DATE TYPE (1) DURATION REASON (2) METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHLTTTING EVENT CODE (4) CODE (5) ACTION TO PREVENT DOWN REACTOR (3) REPORT # RECURRENCE 96-18 960720 F 0 A 5 N/A HF 777777 Power reduction to repair a loose debris filter flap in the "C' waterbox.

1 2 3 4 5 F: FORCED FtEASON- METHOD EXHIBfT G -INSTRUCTIONS EXHfBIT I- SAME SOURCE S- SCHEDULED A-EQUIPMENT FAILUN 1-MANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C-REFUELING S-AUTO SCPAM EVENT NPORT (LER) FILE D-NGULATORY NSTRCTION 4-CONTINUED (NUNG-0181)

E-OPERATOR TRAINING & 5-REDUCED LOAD LICENSE ADMINISTRATION 94THER F-ADMtNISTRATION G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER

. _ _ _ . . . _ _ _ _ . _ _ _ _ ___._____ _ ___ _ ________.__ _. _ , ___. - __ _ _ _ _ _ _ __________.___m

1 1

MONTHLY OPERATIONAL

SUMMARY

STATEMENT i

, DOCKET NO. 50-302 UNIT FLCRP-3 DATE AUGUST 2,1996 j COMPLETED BY T V Dao

{

TELEPHONE (352) 795-6486

- MONTH: JULY j

l

SUMMARY

STATEMENT:

}

Crystal River Unit 3 operated at full power for the month of July with the exception of a power reduction on 07/20 to repair a loose debris filter flap in the "C" waterbox.

d i

l I

ll l

1 I

i t

i