. . . - . . . _ . . .

. l Florida l Power CORPORATION Oyuhd FDwar Unit 3 Dooks: Na 84302 J

November 12, 1996

. 3F1196-08 U. S. Nuclear Regulatory Commission Attn
Document Control Desk l Washington, DC 20555-0001

Subject:

Monthly Operating Report l I

Dear Sir:

Attached is the Crystal River Unit-3 October 1996 Monthly Operating Report. This I report is submitted in accordance with Technical Specification 5.7.1.2.

Sin rely, D% Larry C. Ke le

. Director, Nuclear Operat ons Site Support LCK/ff Attachment xc: Regional Administrator, Region II Senior Resident Inspector NRR Project Manager i 9611220239 961031 PDR ADOCK 05000302 R PDR ,

CRYSTAL RVER ENERGY COMPLEX: 15760 W Power uno St . Crystal River, Florida 344284708 (352) 7954486 A Florida Progress Company 220028

. ~ . . . _. _ _. . - _ . . _ . . ..- _

OPERATING DATA REPORT 1

DOCKET No. 50-302 1

UNU FLCRP-3 DATE NOV 4,1996 I l

COMPLETED BY T V Dao Metd q TELEPHONE (352)795-6486 a

OPERATING STATUS I

1. UNIT NAME:. . . . . . . . . . . . . CRYSTAL RIVER UNIT 3 -
2. REPORTING PERIOD:. .. . . . . . . .. . OCTOBER <

, 3. LICENSED THERMAL POWER (MWt):. .. . . . . 2544

4. NAMEPLATE RATING (GROSS MWe):.. .. . 890:
5. DESIGN ELECTRICAL RATING (NET MWe):. .. . . 825 1
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860 - '
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):. . 818 I
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT GIVE REASONS.
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): N/A
10. REASONS FOR RESTRICTIONS,IF ANY: N/A i 1

i THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 745.0 7'320.0 -

, 172,152.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 3,308.1 117.416.2' 13 REACTOR RESERVE SHUTDOWN HOURS 0.0 - 0.0 1,280.6
14. HRS GENERATOR ON LINE 'O.0 - 3,109.5 - 115,328.7 - I
15. UNIT DESERVE SHUTDOWN HOURS 0.0 . 0.0 -- 0.0 -
16. GROSS THERMAL ENERGY GENERATED (MWH) 0' ' 7.465,052: 268,847,210 -
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 2,547,840 91,894,033 -

2,417.371- 87,402,384 -

~

18. NET ELECTRICAL ENERGY GENERATED (MWH) 0
19. UNIT SERVICE FACTOR 0.0% 42.5 % ' 67.0%
20. UNIT AVAILABLE FACTOR 0.0% - 42.5%

67.0 %

21. UNIT CAPACITY FACTOR (using MDC net) 0.0% 40.4 % 62.8 %
22. UNIT CAPACIT( FACTOR (using DER net) 0.0% 40.0% 61.5 %
23. UNIT FORCED OUTAGE RATE 100.0 % 39.2 % ' 10.1%
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

Continuation of the Lube oil outage until February 28,1997 to implement modifications to improve various safety margins.

25. IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP: FEBRUARY 28,1997
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICIT( NA NA COMMERCIAL OPERATION NA NA

_ . . - ~ . , . .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE NOV 4,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 MONTH OCTOBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0- 17 0 2 'O 18 0.

3 0 19 0 4 0: 20 0 5 21 0-6 0- 22 0-7 .0 23 'O-8 0 24 0 9 0 25 0 10 -O 26 0-11 -0 27 'O.

12 :0 28 0 13- 0 29 0-14 0- 30 0 15 0 31 0 ,

16 'O INSTRUCTIONS:

On this format, list the daily average unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS -

DOCKET NO. 50-302 .

UNIT FLCRP-3 REPORT MONTH. OCTOBER DATE NOV 4,1998 COMPLETED BY T V Dao -

TELEPHONE (352)795-4486 -

NO. DATE TYPE (1) DURATION REASON (2) METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUTTING EVENT CODE (4) CODE (5) ACTION TO PREVENT '

DOWN REACTOR (3) REPORT # RECURRENCE 96-27 961001 F 745 D 4 96-020-00 EE ENGINE Reactor remained in cold shutdown to prepare for modifications to improve various safety margins.

1 2 3 4 5 F: FOFCED REASON- METHOD EXHST O -INSTRUCTIONS EXHIBIT I- SMAE SOURCE S: SCHEDULED A--EQUtPMENT FAILURE 1-MANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2-MANUAL SCHAM ENTRY SHEETS FOR LBCENSEE C-REFUELING 3-AUTO SCRPM EVENT REPORT (LEFQ FILE D4tEGULATORY FESTRICTION 4-CONTINUED (NUREG-0181)

E-OPERATOR TFIANNO & 6-REDUCED LOAD LICENSE ADMMSTRATION S-OTHER F.ADMNSTRATION G-OPERATIONAL EfWOR H-O HER

l l.

l .'

MONTHLY OPERATIONAL

SUMMARY

STATEMENT l

DOCKET NO. 50-302 UNIT FLCRP-3 DATE NOV 4,1996 j COMPLETED BY T V Dao TELEPHONE (352) 795-6486 I

MONTH: OCTOBER

SUMMARY

STATEMENT:

Crystal River remained in cold shutdown through October to resolve the emergency diesel generator maximum electrical loading issue and to prepare for modifications to improve various safety margins.

i l

l I