Monthly Operating Rept for Apr 1997 for Crystal River Unit 3
ML20141E102
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/30/1997
From: Dao T, Grazio R
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0597-02, 3F597-2, NUDOCS 9705200314
Download: ML20141E102 (5)


Text

.-

-4 Flzrida Pswer E.nno.T.

o.a mso: w a May 15,1997

'. 3F0597-02 U. S. Nuclear Regulatory Commission Attn: Document Control Desk ,

Washington, D.C. 20555-0001

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit-3, April 1997 Monthly Operat: deport. This report is bein0 submitted in accordance with Technical Specification 5.7.1 Sincerely, i

"< &b obert E. Grazio l Director, Nuclear Regulatory Affairs f i REG:ff .

Attachment xc: Regional Administrator, Region ll I Senior Resident inspector NRR Project Manager nQDb l.IIllIllIl Ell)l{\]"[ll _

9705200314 970430 PDR ADOCK 05000302' R PDR s CRYSTAL iWER ENERGY COMPLEX: 167so w Power Line at . cry. si nivee. rioews. 3442e-e70s . (3s2 7ss s4es a vnuss nevere comea y

r

, OPERATING DATA REPORT

, DOCKET NO. 50-302 UNn FLCRP-3 DATE MAY 5,1997 COMPLETED BY T V Dao M TELEPHONE (352)795-6486 OPERATING STATUS

1. UNIT NAME:.. .. .. .... .. .... . . . ..... . .. CRYSTAL RIVER UNIT 3
2. REPORTING PERIOD:....... . . . . . . . . . . . . .. APRIL
3. LICENSED THERMAL POWER (MWI):-. . . . . 2544
4. NAMEPLATE RATING (GROSS MWe):. . . . . . . . . 890
5. DESIGN ELECTRICAL RATING (NET MWe):. . . . . . 825
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):. .. ... 818
8. IF CHANGES OCCUR IN CAPACITY RATINGS OTEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): N/A
10. REASONS FOR RESTRICTIONS,!F ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE
11. HOURS IN REPORTING PFRIOD 719.0 2.879.0' 176.495.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 117.416.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,280.6
14. HRS GENERATOR ON LINE 0.0 0.0 = 115,328.7-
15. UNIT RESERVE SHUTDOWN HOURS ' O.0 0.0 - 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 268.847,210
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 -91,894,033
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0 87,402,384
19. UNIT SERVICE FACTOR 0.0% 0.0% 65.3 %
20. UNIT AVAILABLE FACTOR 0.0% 0.0% - 65.3%
21. UNIT CAPACITY FACTOR (using MDC net) 0.0% 0.0% 61.3 %
22. UNIT CAPACITY FACTOR (using DER net) 0.0% 0.0% 60.0 %
23. UNIT FORCED OUTAGE RATE 100.0 % 100.0 % 18.7 %
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

Continuation of the Design Basis issues outage (11 A) until December 31,1997 to prepare and implement modifications to improve various design margins.

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: DECEMBER 31,1997
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICRY NA NA COMMERCIAL OPERATION NA NA

p:-

,g

'e ,. >

~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE MAY 5,1997 t COMPLETED BY T V Dao TELEPHONE (352) 795-6486 i i

' MONTH ' APRIL  ;

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) ,

1 0- 17 0 2 0 18 .0-3 0 '

19 4 0 20 0~

'0-5 O 21 >

6 0 22 0 7 0 23 0- <

8 0 :0- 24 0 9 0- 25 0 ,

10 0 26 'O~

11 0 27 0

~

12 0 28 13 0 29 0 14 0- 30 0 15 0 31 N/A 16 0 ,

INSTRUCTIONS:

On this format, list the daily average unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt, t

i t

3

  • 4. q 5 UNIT SHUTDOWNS AND POWER REDUCTIONS .

DocieTwo. so-aer

  • UNIT FLCRP-3 ,.

fiEPORT MONTH: APfM. DATE MAY 5. Tee 7 coe8PLETED BY T VDao TaEPHONE (353 7e6-oces '.'

NO. DATE TYPE (1) DURATION TEASON (2) MEntOOOF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTWE HOURS SHUTTING EVENT CODE (4) CODE (5) ACTION TO PREVENT -

DOWN HEACTOR(3) REPORT # RECURRENCE 97-04 -970401 F 719 0 4 96-020-00 EE ENGINE Reactor remained in cold shutdown to 96-022-00 .AB prepare and lenplement mcdfications :

96-022-01 AB to improve various design margins. -

96-024-00 CH 96-024-01 CH 97-001-00 CH 97-005 CH 97-006-00 SF 1 2 8- 4 &

f. F: FORCED REASOft METHOO j S: SCHEDULED EXHIINT G-INSTNJCTIONS ElemerTI-SAME SOURCE

(

A-EQUIPMENT FAEURE 1-MANUAL FOR PREPARATION OF DATA I 8-MAMTENANCE OR TEST 2-MANUAL SCRAM ENTfW SHEETS FOR LIEhSEE C-REFUELING 3-AUTO SCRAM EVENT REPORT M FEE D-REGULATORY RESTRICTION N (NUNG-0161)

ENTGR TRAINING & N LOAD LICENSE ADbMNtSTRATION 0-OTHER F-ADbMMISTRATION G-OPERATIONAL EFWOR H-O HER

t j'

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50;;l; UNIT FLCHP-3 DATE MAY 5,1997 T V Dao COMPLETED BY TELEPHONE (352)795-6486 MONTH: APRIL i

SUMMARY

STATEMENT:

Crystal River remained in cold shutdown through April 1997 to resolve the emergency diesel generator maximum electricalloading issue and to prepare and implement modifications to improve various design margins.

I 3

3-

+

i 4