Florida Power CORPORATION ETE February 17, 1997 3F0297-08 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report n

Dear Sir:

Attached is the Crystal River Unit-3, January 1997 Monthly Operating Report.

This report is being submitted in accordance with Technical Specification 5.7.1.2.

Sincerely, w

David F. Kunsemiller Director, Nuclear Operations Site Support DFK/ff a l Attachment l

/;fLI I l l xc: Regional Administrator, Region II V '

Senior Resident Inspector NRR Project Manager ,

9702200050 970131 PDR ADOCK 05000302 R PDR CRYSTAL FWER ENERGY COMPEX: 15700 W Power une St . Crystal FWyer, Florida 344284708 e (352) 7954486 A TIorida Progress Company

I

,.- OPERATING DATA REPORT i

DOCKET No. 50-302 UNn FLCRP-3 ,

DATE FEB 10.1997 COMPLETED BY T V Dao A&td ,

TELEPHONE (352) 795-6486 OPERATING STATUS

1. UNIT NAME:. . . . . . . . CRYSTAL RIVER UNIT 3  !
2. REPORTING PERIOD: . . . JANUARY l
3. LICENSED THERMAL POWER (MWt):. 2544
4. NAMEPLATE RATING (GROSS MWe):. . . . . 890
5. DESIGN ELECTRICAL RATING (NET MWe):. . 825 I
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):. 860~
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):. . . 818 l
6. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): N/A i
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE t
11. HOURS IN REPORTING PERIOD 744.0 744.0 174,360.0  ;

12.' NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 i

-117.416.2--

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1.280.6 )

' 14. HRS GENERATOR ON LINE 0.0 0.0 -115.328.7 4

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 ~ 0- 268.847,210^
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0- 91.894,033
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0 87,402.384 -
19. UNIT SERVICE FACTOR 0.0% 0.0% 66.1 %
20. UNIT AVAILABLE FACTOR 0.0% 0.0% 66.1 % l
21. UNIT CAPACITY FACTOR (using MDC net) 0.0% - 0.0% 62.0 % j
22. UNIT CAPACITY FACTOR (using DER net) 0.0%' O.0% 60.8 % l
23. UNIT FORCED OUTAGE RATE -100.0 % 100.0 % 17.5% ,
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH): l

- Continuation of the Design Basis issues outage (11 A) until December 31,1997 to implement modifications to improve various safety margins.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: DECEMBER 31,1997
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA

. - . . ._ . - _ _ - . . . . . . . ~ . . . . .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE FEB 10,1997 COMPLETED BY T V Dao .

TELEPHONE (352)795-6486 l l

I l

MONTH JANUARY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0' 20 0-5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0- 25 0 10 0 90 ,__

0 11 0 i'7 ,

0 12 0 28 0 13 0- 29 0 14 0 30 0 15 0- 31 0 16 'O INSTRUCTIONS:

l On this format, list the daily averag's bait power level in MWe-Net for each day in the

! reporting rnonth. Compute to the nearest whole megawatt.

l l

- . . _ . -. - .~ . . . .. - - , . .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-302 UNIT FLCRP-3 .

REPORT MONTH- JANUARY DATE FEB 10.1997 ,e COMPLETED BY T V Dao TELEPHONE (352) 71HH5486 NO. DATE TYPE (1) DURATION REASON (2) METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUTTING EVENT CODE (4) CODE (5) ACTION TO PREVENT DOWN REACTOR (3) REPORT # RECURRENCE 97-01 970101 F 744 D 4 96-020-00 EE ENGINE Reactor remained in cold shutdown to 96-022-00 AB prepare for modifications to improve 96-024-00 CH various safety margins.

k 1 2 3 4 5 l F: FORCED REASON: METHOD EXHIBIT G -INSTRUCTIONS EXHIBITI- SAME SOURCE S: SCHEDULED A-EQUIPMENT FAR URE 1-MANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C-REFUELING 3-AUTO SCRAM EVENT REPORT (LER) FILE D-REGULATORY RESTRCTK)N 4-CONTINUED (NUREG-016t)

E-OPERATOR TRAINING & 5-REDLW LOAD LICENSE ADMINISTRATION 9-OTHER F-ADMINISTRATION G-OPERATIONAL ERROR H-OTHE

l

~

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE FEB 10,1997 COMPLETED BY T V Dao TELEPHONE (352)795-6486 MONTH: JANUARY

SUMMARY

STATEMENT:

Crystal River remained in cold shutdown through January 1997 to resolve the emergency diesel generator maximum electrical loading issue and to prepare for modifications to improve various safety margins.

-