l i

Florida l Power CORPORATION 07E June 13, 1996 3F0696-02 U. S. Nuclear Regulatory Commission l Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report  !

l

Dear Sir:

Attached is the Crystal River Unit-3 May 1996 Monthly Operating Report. This report is submitted in accordance with Technical Specification 5.7.1.2.

Sincerely, G. L. oldt Vice President Nuclear Operations GLB/ff  ;

1 Attachment xc: NRR Project Manager Regional Administrator, Region 11 Senior Resident Inspector 180075 9606180701 960531 2 ADOCK 0500 gDR CRYSTAL FWVER ENERGY COMPLEX: 15700 W Power une St . Crystal River, Florida 344284706 e (352) 7954486 fg A Rodde Prognus Company

. _ . -- - . _ ~ .- _ -. -_-

i i

OPERATING DATA REPORT l

  • DOCKET NO. 50-302 UNIT FLCRP-3 DATE JUNE 6,1996 COMPLETED BY l

_T V Dao TELf" PHONE (352) 795-6486 OPERATING STATUS

1. U NIT N AM E: .. . . . .. . . . . .. ... ..... . . . . . . . . . CRYSTAL RIVER UNIT 3
2. REPORTING PERIOD:. . . . . . . . . . . . . . . . . . . . . . . . . . MAY
3. LICENSED THERMAL POWER (MWt):. ..... ... 2544
4. NAMEPLATE RATING (GROSS MWe):. .. .. . . . . . . . 890
5. DESIGN ELECTRICAL RATING (NET MWe):. . . . 825
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):. . . 818
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWe): N/A
10. REASONS FOR RESTRICTIONS,IF A.NY: N/A THIS MONTH YR. TO DATE CUMULATIVE P
11. HOURS IN REPORTING PERIOD 744.0 3.647.0 168,479.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 393.7 1,083.3 115.191.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1.280.6
14. HRS GENERATOR ON LINE 313.9 ' 990.9 113.210.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 627,622 2,323.055 263.705.213
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 205.948 786.379 90,132.572
16. NET ELECTRICAL ENERGY GENERATED (MWH) 102.931 747.082 85,732,095
19. UNIT SERVICE FACTOR 42.2% 27.2 % 67.2 %
20. UNIT AVAILABLE FACTOR 42.2% 27.2 % 67.2 %
21. UNIT CAPAC11Y FACTOR (using MDC net) 31.7 % 25.0 % 63.0 %
22. UNIT CAPACITY FACTOR (using DER net) 31.4 % 24.8 % 61.7 %
23. UNIT FORCED OUTAGE RATE 0.8% 31.2 % 15.4 %
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION Gr EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP.
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA

AVERAGE DAILY UNIT POWER LEVEL 1 .

DOCKET NO. 50-302 UNIT FLCRP-3 DATE JUNE 6,1996 COMPLETED BY T V Dao TELEPHONE (?52)795-6486 MONTH MAY DAY AVERAGE DAIL'.' POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 2

(MWe-Net) (MWe-Net) 1 0- 17 17 2 0 18 260 3 0 19 0 4 0 20 276 5 0 21 489

. 6 0 22 542 7 0 23 648 8 0- 24 638 9 0 25 635 10 0 26 636 11 0 27 745 12 0 28 764 13 0 29 841 14 0 30 842 15 0 31 718 16 0 INSTRUCTIONS:

On this format, list the daily average unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt, d

m UNIT SHUTDOWNS AND POWER REDUCTIONS

  • EDCKET NO. 50-302 UNIT FLCRP-3 REPORT MONTH MAY DATE JUNE 6,1996
  • COMPLETED BY T V Dao TELEPHONE (352) 795-64a6 .

NO. DATE TYPE (1) DURATION REASON (2) METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUTTING EVENT CODE (4) CODE (5) ACTION TO PREVENT DOWN REACTOR (3) REPORT # RECURRENCE 96-06 960501 S $04.5 C 4 N/A ZZ 777777 Continuation of Refuel 10.

96-07 960s17 S 0 C 5 N/A ZZ 777777 Power escalation and testing 96-08 960519 S 23.0 B 5 N/A ZZ 777777 Turbine was off line for overspeed trip test E3-09 960520 S 0 C 5 N/A ZZ 777777 Power escalation and testing 96-10 960523 F 0 A 5 N/A HA VALVOP Power reduction to 76% to replace limit switch arm separation on GV-1. The limit switch arms for other governor valves were also repaired.

96-11 960527 F 0 B 5 N/A HJ CKTBRK Holding reactor power at 90% to troubleshoot ICS reactor /feedwater crosslimit. The cause was toggle switches for feedwater demand integral modules in the incorrect position. The modules were restored to normal.

96-12 960531 F 0 B 5 N/A HA VALVEX Power reduction to 93% to troubleshoot high noise coming from governor valve GV-4.

The noise was found to be related to position of GV-4. EHC system will be recalibrated to control GV-4 at a different position.

96-13 960531 F 2.6 B 3 N/A HA VALVEX Turbine / reactor trip due to loss of EHC oil pressure during performance of PT-325. The probable cause was turbine trip solenoid valve seat leakage. The problem could not be duplicated during subsequent troubleshooting.

Turbine hydraulic oil was tested clean.

1 2 3 4 5 F: FORCED REASON. METHOD EXHtBIT G -INSTRUCTIONS EXHIBIT 4 - SAME SOURCE S: SCHEDULED A-EOutPMENT FAILURE 1-MANUAL FOR PREPARATION OF DATA EWAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C-REFUELING 3-AUTO SCRAM EVENT REPORT (LER) FILE D-REGULATORY RESTRICTION 4-CONTINUED (NUREG-0169)

E-OPERATOR TRAINING & 5-REDUCED LOAD UCENSE ADMINISTRATION 9-OTHER F-ADMINISTRATION 0-OPERATIONAL ERROR EXPLAIN)

It4THER

- _ _ _ _ _ _ _ _ _ _ _ _ ----_ _ . ~ ~

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE JUNE 6,1996 COMPLETED BY T V Dao l TELEPHONE (352)795-6486 MONTH: M/,Y

~

SUMMARY

STATEMENT:

Crystal River Unit # 3 completed Refueling 10 on May 17.

, The unit was taken offline on May 19 for a turbine overspeed trip test. A turbine / reactor trip occurred on May 31 due to loss of turbine valve hydraulic oil pressure during performance of PT-325.

Three other power reductions occurred during this period.

Power was reduced to 76% on May 23 to replace limit switch arms for governor valves,90% on May 27 due to ICS reactor /

feedwater crosslimit, and 93% on May 31 to troubleshoot noise coming from governor valve GV-4.

b 4

1 a