Florida Power C.

c- 7n,a oa u

November 13,1G97 3F1197-02 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit 3, October 1997 Monthly Operating Report. This report is being submitted in accordance with Technical Specification 5.7.1.2.

Sincerely, U u'[gd '

Robert E. Grazio Director, Nuclear Regulatory Affairs REG:ff Attachment i i

xc: Regional Administrator, Region 11

' g@

Senior Resident inspector NRR Project Manager.

~

9711180306 971031 PbR R ADOCK 05000302 PDR g lfllflflllflflfllllflllllf]ll CRYSTAL RIVER ENEPoY COMPLEX: is7so w Pow., Line sir.. . crysias m . riorio. 3442s a ros tas2 7ss s4as A im hostess campeor

k OPERATING DATA REPORT DOCKET NO. 50-302

. UNIT FLCRP-3 DATE NOV 3,1997 . m COMPLETED BY TVDao AMhd TELEPHONE (152)795-6486 OPERATING STAT 118

1. UNIT NAME:. . .. . . . . . . . . . . CRYSTAL RIVER UNIT 3
2. REPORTING PERIOD:. .. . . . . OCTOBER 1997
3. LICENSED THERMAL POWER (MWt):. . 2544
4. NAMEPLATE RATING (GROSS MW+ y . 890
5. DESIGN ELECTRICAL RATING (NET MWe):. 825
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):. 860
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):. 818
8. IF CHANGES OCCUR IN C APACITY RATINGS (ITEMS NUMF*R 3 THROUGH 7) S'NCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTR:CTED, IF ANY (NET MWe): N/A _
10. REASONS FOR RESTRICTIONS,IF ANY: N/A THIS MOBTTH YR. TO DATE CUMULAT;VE
11. HOURS IN REPORTING PERIOD 745.0 7,296.0 180,912.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 117.416.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,280.6
14. HRS GENERATOR ON LINE 0.0 0.0 115,328.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 0_ 0 268.847,210
16. GROSS THERMAL ENERGY GENERATtD (MWH)
17. 6 - >SS ELECTRICAL ENERGY GENERATED (MWH) 0 0 91,894,033
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0 87,402.384
19. UNIT SERVICE FACTOR 0.0% 0.0% 63.7 %
20. UNIT AVAILABLE FACTOR 0.0% 0.0% 63.7 %
21. UNir CAPACITY FACTOR (using MDC not) 0.0% 0.0% 59.7 %
22. UnllT CAPACITY FACTOR (using DER net) 0.0% 0.0% 58.6%
23. UNIT FORCED OlfTAGE RATE 100.0 % 100.0 % 21 2 %
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

Continuation of the Design Basis issues outage (11 A) until December 31,1997 to prepare and implement modifications to improve various design margins.

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: DECEMBER 31,1997
26. UNITS iN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INmAL CRITICAlfiY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE NOV 3,1997 COMPLETED BY T V Dao TELEPHONE (352)795-6486 MONTH OCTOBER 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 _

17 0 2 0 18 _ 0 3 0 19 0 4 0 _

20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 ,

10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 16 0 31 _ U' 16 0 ,_

INSTRUCTIONS:

On this format, list the dally average unit power level in MWe-Net for each day in the reporting month Compute to tiie nearcst whole megawatt.

~

%.  ?- .

UNIT SHUTDOWNS AND POWER REDUCTIONS '

DOCKET NO. So-D2 ,

UNIT FLCrP-3 NOV 3.1W7 DATE REPORT MOf!TH: OCTOBER 1997 COMPLETED BY T V Dao TELEPHONE L352)7954486 ,

MEIHOD OF UCENSEE SYSTEM COS*PONENT CAUSE AND COrmtw sVE NO. DATE TYPE (1) DURATION REASON (2) ACTION TO PREVENT HWJRS 91UTTING EVEF CODE (4) CODE (5) ,

RCCURRENCE DOWN REACTOR (3) REPORTf 4 96-020-00 EE ENGINE Reactor rema:ned in cold shutdown to 97-10 971001 e 745 D 96-022-00 AB prepare and implement modications 96-022-01 AB to improve various design margins.

96-024-00 CH 96-024-01 CH 97-001 00 CH 97-G35-00 CH 97-0C3-00 SF w

4 5 2 3 1

EXHlBIT G - MSTACTIONS EXHEIT I- SAME SOURCE REASON: METHOD F: FORCED 149ANUAL FOR PMPARATION Or DAT A S- Schu)UtED A-EOUIPMENT FAJLUPE ENTRY SHEETS FOR UCENSEE B-MAJNTENANCE OR TEST 2-asANUAL 9 CRAM S-AUTO SCRAM ENENT PEPORT (LETg FLE C-NFUELJHG D-REGULATORY MSTRBCTION 4-CONTINUED (NUFEG-0191)

E-OPERATOR TRAINWG & 5-REDUCCD LOAD LICENSE ADMINISTRATION S-OTHER F-ADMINISTRATIO9s G-OPERATIONAL ERROR (EXPLAPO H-OTHER t

- - - W

. . . = - - . - . -- . .

  • ~ ; . . .-

MONTHLY OPERATIONAL

SUMMARY

STATEMENT '

DOCKET NO. 50-302 ,

UNIT FLCRP-3 DATE NOV 3,1997 COMPLETED BY T V Dao

_ TELEPHONE -(352) 795-6486 MONTH: OCTOBER 1997'

SUMMARY

STATEMENT:

Crystal River remained in cold shutdown through October 1997 to resolve the emergency diesel genarator maximum electrical loading issue and to prepare and implement modifications to improve various design margins.

4 I ,-E

, ,, ,, ,- , - - , =